Iloilo City Occupancy Permit Guide

This document outlines the requirements for obtaining an occupancy permit from the Iloilo City Engineer's Office. It lists the necessary documents, including building, electrical, plumbing, and mechanical permits as well as an issued/approved plan, certificate of occupancy, certificate of completion forms signed by registered engineers and architects, pictures of the building, and other safety documents. The purpose of the occupancy permit is to allow occupancy and use of a completed building and is required before any new or existing structure is occupied.

Uploaded by

Anonymous 06ZPEe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
463 views2 pages

Iloilo City Occupancy Permit Guide

This document outlines the requirements for obtaining an occupancy permit from the Iloilo City Engineer's Office. It lists the necessary documents, including building, electrical, plumbing, and mechanical permits as well as an issued/approved plan, certificate of occupancy, certificate of completion forms signed by registered engineers and architects, pictures of the building, and other safety documents. The purpose of the occupancy permit is to allow occupancy and use of a completed building and is required before any new or existing structure is occupied.

Uploaded by

Anonymous 06ZPEe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

OCCUPANCY PERMIT

Source: Iloilo City Engineer’s Office

NAME OF PERMIT NO. OF COPY AGENCY


PURPOSE REQUIREMENTS CONCERNED FEE
3 copies
An Occupancy Building Permit
Permit is required 3 copies CITY
OCCUPANCY before any Electrical Permit ENGINEERING’S
building/structure 3 copies OFFICE
is used or Sanitary / Plumbing Permit TO BE ASSESSED
occupied. It is
3 copies
usually secured
Mechanical Permit
after the
completion of a 1 set
structure. It is also Issued/Approved Plan
required if there is 5 copies
any change in the Certificate of Occupancy
existing use or
occupancy Duly Accomplished Certificate Of 4 copies
classification of a Completion Forms (Building,
building, structure Plumbing/Sanitary, Electrical,
or any portion &Mechanical) signed and sealed by
thereof. duly registered Civil Engineer/Architect,
Master Plumber, Professional Electrical
Engineer, and Professional Mechanical
Engineer on their corresponding
discipline in-charge of construction
4 copies
Pictures of the building/structure
showing all sides (front, right, left,
& rear)

OTHER DOCUMENTS
Original and 2 photocopies
Fire Safety Inspection Certificate

Picture of the structure nearest to


PECO high tension line/wire for 2-
storey and above building
OCCUPANCY PERMIT
Source: Iloilo City Engineer’s Office

As built-Plan if there are significant


changes made during the
implementation stage in relation to
the issued plan

Any other requirements/documents


deemed necessary to support the
issuance of the permit