Elevator Installation Safety Guide

1. The document provides safety procedures for installing an elevator, including preparing tools and materials, setting up scaffolding, installing templates and brackets, erecting rails, assembling car and control systems, wiring, and testing. 2. It outlines 14 steps from preparation to finish, with safety as the top priority at each stage, such as preparing fire extinguishers when welding and wearing proper protective equipment. 3. Safety measures include barricading work areas, having fire blankets ready, being careful of electric currents and body positioning during mechanical work, and double checking safety before testing elevator functions.

Uploaded by

Mario Sitorus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
1K views1 page

Elevator Installation Safety Guide

1. The document provides safety procedures for installing an elevator, including preparing tools and materials, setting up scaffolding, installing templates and brackets, erecting rails, assembling car and control systems, wiring, and testing. 2. It outlines 14 steps from preparation to finish, with safety as the top priority at each stage, such as preparing fire extinguishers when welding and wearing proper protective equipment. 3. Safety measures include barricading work areas, having fire blankets ready, being careful of electric currents and body positioning during mechanical work, and double checking safety before testing elevator functions.

Uploaded by

Mario Sitorus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Method Statement for Process: Provides detailed steps and safety measures as part of a method statement, outlining procedural instructions for a specific process.

METHOD STATEMENT / WORK PROCEDURE

OF ELEVATOR INSTALLATION

DESCRIPTION PROCEDURE SAFETY

Start

1 Prepare The Tolls and Equipment ;


1 Chain Block 5 Ton 1 set 1 The Worker Must know about Safety (Tool, Material and Location)
2 Drill Machine 1 unit
PREPARATION 3 Hammer 2 pcs
4 Grinder 1 pcs
5 Spanners 1 set
6 Wood or Pipe 1.5 inch 4m
7 Fire Estinguiser 1 set
8 Hand Pallet 1 unit

2 Scaffolding
SCAFFOLDING
1 Be Carefull when install Scaffolding
Scaffolding will be do in Top floor and Bottom floor
Scaffolding catwalk will be install Crossing in each floor 2 When Install Wear Safety Belt

TEMPLATE 3 Template ( at Top and Bottom Floor ) 1 Install Template Must be Rigid
1 Confirmation the As corridor and floor finishing
2 Confirmation to main contractor if there is structure will chipping (at Least 50 mm)
3 Piano wire must do to know the rail position
4 Clean after installation process

BRACKET MAIN RAIL & 4 Braket Main Rail & CWT 1 When Welding Process, the Worker prepare Fire Extinguisher
CWT RAIL
1 Set position vertikal and horizontal bracket rail with waterpass 2 Prepare Fire Blanket
2 Check braket rail Before Welding Process in Bracket

5 Rail Erection
1 Prepare the rail before Installation 1 Be Carefull, the Worker must keep the material and tool, don’t pull down
RAIL ERECTION 2 Prepare Electric winch which will be hoist 2 The worker must wear helm safety helm and Safety belt
3 Hoist the rail slowly 3 Be Carefull the finger when do rail joint

6 Rail Allignment
1 Check the piano wire is right. 1 Be Carefull, the Worker must keep the material and tool, don’t pull down
RAIL ALLIGNMENT
2 Piano wire in rail car or CWT must be between of rail
3 Do this Installation until Top Floor

7 Assembling Car & CWT


ASSEMBLING CAR & 1 Position Assembling Car on Top Floor and CWT on Ground Floor, 1 When car assembling must know the chain block location
CWT 2 Setting horizontal position with waterpas 2 When car assembling must prepare the bottom channel was braked condition
with wire

ASSEMBLING T/M & 8 Assembling T/M & Control Panel


CONTROL PANEL 1 Prepare the Electrical Lay out about location of Control Panel. 1 When Setting traction Machine must know the chain block location
2 The Place of Machine Beam must same with Template

9 Assembling Sill Support, Sill, Jamb, Hanger case & Hatch foor
SILL SUPPORT, SILL,
JAMB. HANGER CASE, &
1 Installation Sill Support, Sill, and Hangercase must know location of piano wire 1 When Welding Process, the Worker prepare Fire Extinguisher
HATCH DOOR 2 Jamb installation must use waterpass 2 Be Carefull, the Worker must keep the material and tool, don’t pull down
3 Hatch door Installation must know the gap between door and Jamb 3 Prepare Fire Blanket
4 Safety Barricade will be install in each floor which protect with pipe

10 Wiring on Car Top Station, Car Operating , Travelling Cable & Indicator 1 Be Carefull with Electric Current
1 Prepare the tool and materials 2 Be Carefull when do in car above
WIRING
2 Wiring on Car Operating Panel, Car top station, Travelling cable & Indicator

11 Dismantling Scaffolding
DISMANTLING
SCAFFOLDING

12 Testing & Commissioning


1 Prepare the tool and materials 1 Be Carefull when mechanical adjustment
TESTING & 2 Slow Speed Operation 2 Before Slow speed test Must check the condition is safe or not
COMMISSIONING 3 Mechanical Adjustment 3 Released the brake
4 High Speed
5 Ballancing

CHECK LIST & HAND 13 Check List and Hand Over


OVER 1 Prepare the document to check list 1 Prepare the tool Requirements
2 Check the Equipment option on contract 2 Be carefull when checking on car above

14 Finish
FINISH