Techtal - Working Permit Details PDF

The document provides details of a project including the customer information, contractor details, list of personnel and tools/equipment, scope of works, and proposed timeline. Specifically, it lists the names of 24 personnel and 13 tools/equipment for a project installing air conditioning units and drain pipes from July 26 to August 6, 2018 for a customer called MOZZAICO located in Taguig City and to be undertaken by TECHTAL INTERNATIONAL INC. in Pasig City.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views2 pages

Techtal - Working Permit Details PDF

The document provides details of a project including the customer information, contractor details, list of personnel and tools/equipment, scope of works, and proposed timeline. Specifically, it lists the names of 24 personnel and 13 tools/equipment for a project installing air conditioning units and drain pipes from July 26 to August 6, 2018 for a customer called MOZZAICO located in Taguig City and to be undertaken by TECHTAL INTERNATIONAL INC. in Pasig City.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Ground Flr.

Ardan Building ,
Meralco Ave cor Shaw Blvd., Pasig City
Telefax : (02) 696-7813
Mobile : (0917) 1677813
Email : [Link]@[Link]

Name of Customer: MOZZAICO


Address: Unit 2C08, 2nd Floor Serendra Retail, 26th cor 11th Ave. Taguig City
Contact Person: ARCH. SHAYAN ANVARPOUR

Contractor Name: TECHTAL INTERNATIONAL INC.


Address: G/F Ardan Bldg. Meralco Ave cor Shaw Blvd., Pasig City

List of Personnel:
1 Perbec Abina 13 Mico Paolo Abe
2 Crisegen Tilos 14 Leopoldo Conde
3 Edelmar Palo 15 Arnel Candelario
4 Noelito Dedace 16 Edmon Dantes
5 Mark Edison Cuachin 17 Curl Escala
6 Rodel Ignacio 18 Roque Saludaga
7 Edison Tuprio 19 Rolly Arabia
8 Jon Michael Dalisay 20 Lowesito Castro
9 Bernard Guevarra 21 Erick Mendoza
10 Edward Nilo 22 Jumar Aragon
11 Ramie Basence 23 Azel Dellomas
12 Melecio De Guzman 24 Luvimin Andres

List of Tools and Equipment:


1 Adjustable Wrench 8 Welding Machine
2 Pipe Wrench 9 Extension Cord
3 Manual Threaded 10 Steel Brush
4 Hammer Drill 11 Gloves
5 Ladder 12 Steel Brush
6 Rubber Gloves 13 Gatohan (Pipe Table)
7 Speed Cutter

Note: Please see attached files for other materials list.

Works To Do:
1 Installation of York Ceiling Mounted Chilled Water Unit
a. Driling hole for Full Threaded Bar Installation
b. Installation of Hangers
c. Installation of B.I. Pipes with accessories and insulations
2 Installation of Drain Pipes for Air-con
3 Chemical / Hydrogen Testing

Proposed Date: July 26 - August 6, 2018