100% found this document useful (1 vote)
6K views2 pages

Blasting and Painting Inspection Report

This blasting and painting report documents the surface preparation and coating application for a client's project. It provides details on the date of blasting, abrasive type used, required surface standard, and describes the original surface condition. It also lists the coating system applied, including the manufacturer, batch number, and required, minimum, maximum and average dry film thicknesses achieved. The report is signed by representatives from the contractor, paint supplier, and client.

Uploaded by

vinoth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
6K views2 pages

Blasting and Painting Inspection Report

This blasting and painting report documents the surface preparation and coating application for a client's project. It provides details on the date of blasting, abrasive type used, required surface standard, and describes the original surface condition. It also lists the coating system applied, including the manufacturer, batch number, and required, minimum, maximum and average dry film thicknesses achieved. The report is signed by representatives from the contractor, paint supplier, and client.

Uploaded by

vinoth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
  • Blasting & Painting Report

BLASTING & PAINTING REPORT

Report No: OCS/BPR/1115/001 Date: April 26, 2011

CLIENT
[Link]
PROJECT NAME
PURCHASE ORDER
APPLICABLE SPEC
3RD PARTY (IF
ANY) AMBIENT CONDITION
DATE / TIME RH (%) ST (°C) DP (°C)

SURFACE PREPARATION

Date of Blasting : 26.04.2011 Surface Standard : SA 2.5


Abrasive Type Used : Steel Grit – G40L Surface Profile :
Coating Manufacturer : Jotun Original Condition :

[Link] [Link] DESCRIPTION QTY

[Link] [Link] [Link] [Link]


DATE COATING SYSTEM [Link]
µm µm µm µm

RH: Relative Humidity ST: Steel Temperature DP: Dew Point DFT: Dry Film Thickness