M Fuel Oil Pipe System IC M FOP 00

This document is a checklist for inspecting the construction of a new load center-3 at King Khalid International Airport. It lists items to inspect for the fuel oil piping system, including reviewing documentation, inspecting installation, and testing. Representatives from the client, contractor, and engineering company must sign off on the inspection of each item as acceptable, rejected, or not applicable.

Uploaded by

achusanachu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views2 pages

M Fuel Oil Pipe System IC M FOP 00

This document is a checklist for inspecting the construction of a new load center-3 at King Khalid International Airport. It lists items to inspect for the fuel oil piping system, including reviewing documentation, inspecting installation, and testing. Representatives from the client, contractor, and engineering company must sign off on the inspection of each item as acceptable, rejected, or not applicable.

Uploaded by

achusanachu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

  

CONSTRUCTION OF NEW LOAD CENTER-3 AT KING KHALED INTERNATIONAL AIRPORT


Fuel oil Piping System Checklist
Contractor: SSEM IC Ref. No.: 085-IC-M-FOS- 00
Contract No.: R-15-085-BF-0 ITP Ref. No.: 085-ITP-M-GOP- 00
Title: Mechanical Works Sec. Fuel oil system
Drawing. No. / Line No.: Area/Location:
Work / item for Inspection:
GACA/AECOM
Item Activity SSEM SSEM Corr. Remarks
Representative
Engr. QC A R N/A
Sign Off
1.0
Documents/ Material status
1.Verify the pipe material type, size and factory
test reports.
2.Check welding/brazing procedures.
3.check welder certificates

1.1
Installation
1. check Fit-up
2. weld visual inspection
3. NDE Inspection
4. Valve installation
5. Painting/Coating inspection
6. Support installation

1.2
Testing
1.Hydrotesting

GACA/AECOM Representative Remarks:

SSEM QC Representative GACA Representative AECOM Representative


Signed: Signed: Signed:
Name: Name: Name:
Date: Date: Date:

085-IC-M-PS 007

Legend: A=Acceptable; R=Rejected; N/A=Not Applicable P a g e 1 of 1