A
MAJOR PROJECT REPORT
ON
Online Admission System
SUBMITTED IN THE PARTIAL FULFILLMENT OF
THE DEGREE OF
BACHELOR OF COMPUTER APPLICATION
Dr. B. R. AMBEDKAR UNIVERSITY, AGRA
BY
STUDENT NAME: SHAMSHER KHAN
ROLL NO:
ENROLMENT NO:
Under the Guidance of
Internal Guide Name External Guide Name
(Designation) (Designation)
Dr. MPS MEMORIAL COLLEGE OF BUSINESS STUDIES, AGRA (U.P.) 282007
Year 2019
CERTIFICATE
It is certified that the work contained in the project report titled “Title of the Project
Report,” by “Name of the Student,” has been carried out under my/our supervision and
that this work has not been submitted elsewhere for a degree
Signature of Supervisor(s)
Name(s)
Department(s)
DR. M.P.S. COLLEGE OF BUSINESS STUDIES
Month, Year
DECLARATION
I declare that this written submission represents my ideas in my own words and where
others' ideas or words have been included, I have adequately cited and referenced the
original sources. I also declare that I have adhered to all principles of academic honesty
and integrity and have not misrepresented or fabricated or falsified any
idea/data/fact/source in my submission. I understand that any violation of the above will
be cause for disciplinary action by the Institute and can also evoke penal action from the
sources which have thus not been properly cited or from whom proper permission has
not been taken when needed.
(Signature)
(Name of the student)
(Roll No.)
Date:
ACKNOWLEDGEMENT
TABLE OF CONTNTS
Title Page i
Declaration of the Student ii
Certificate of the Guide iii
Abstract iv
Acknowledgement v
List of Figures vi
List of Tables (optional) vii
Timeline / Gantt Chart viii
1. INTRODUCTION 1
1.1 Problem Definition 1
1.2 Project Overview/Specifications* (page-1 and 3) 2
1.3 Hardware Specification 3
1.4 Software Specification 4
1.3.1 4
1.3.2
…
2. LITERATURE SURVEY 5
2.1 Existing System 5
2.2 Proposed System 6
2.3 Feasibility Study 7
3. SYSTEM ANALYSIS & DESIGN
3.1 Requirement Specification 9
3.2 Flowcharts / DFDs / ERDs 10
3.3 Design and Test Steps / Criteria 12
3.3 Algorithms and Pseudo Code 16
3.3.1 18
3.3.2 19
3.4 Testing Process 22
… 27
4. RESULTS / OUTPUTS 40
5. CONCLUSIONS / RECOMMENDATIONS 47
6. REFERENCES 49
7. APPENDICES 50
hchgyygyug