Elsewhere in Contract Documents) .: 5 Feet

This document outlines the demolition and removal of existing buildings and site improvements. It specifies quality standards for demolition work, addresses hazardous materials handling, and examines the structural condition of buildings prior to demolition. The document also covers preparation activities like utility shut-off, salvage requirements, below-grade demolition details, site restoration procedures after demolition, and disposal of demolished materials.

Uploaded by

Omer Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views2 pages

Elsewhere in Contract Documents) .: 5 Feet

This document outlines the demolition and removal of existing buildings and site improvements. It specifies quality standards for demolition work, addresses hazardous materials handling, and examines the structural condition of buildings prior to demolition. The document also covers preparation activities like utility shut-off, salvage requirements, below-grade demolition details, site restoration procedures after demolition, and disposal of demolished materials.

Uploaded by

Omer Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Copyright 2004 and 2005 AIA MASTERSPEC Outline 05/04 (R 05/05)

SECTION 024116 - STRUCTURE DEMOLITION

0.1 SUMMARY

A. Demolition and removal of buildings[ and site improvements].

0.2 QUALITY ASSURANCE

A. Quality Standard: ANSI A10.6 and NFPA 241.

0.3 PROJECT CONDITIONS

A. Hazardous Materials: [Removed prior to start of the Work] [Remediation specified


elsewhere in Contract Documents].

0.4 MATERIALS

A. Satisfactory Soils: Division 31 Section "Earth Moving."

0.5 EXAMINATION

A. [Perform] [Engage a professional engineer to perform] an engineering survey of condition of


building.

0.6 PREPARATION

A. Refrigerant: Remove according to 40 CFR 82.

B. Utility Shut Off: [Owner] [Contractor] [Divisions 15 and 16].

0.7 DEMOLITION

A. Use of explosives is[ not] permitted.

B. Salvage: Items to be salvaged and delivered to Owner are indicated [on Drawings.] [below:]

1. <Insert items to be salvaged.>

C. Below-Grade Construction: [Abandon] [Demolish within 5 feet (1.5 m) of building


footprint] [Demolish completely].

1. Remove [completely] [to at least 6 inches (150 mm) below grade] [to at least 12
inches (300 mm) below grade] [to depths indicated].

STRUCTURE DEMOLITION 024116 - 1


Copyright 2004 and 2005 AIA MASTERSPEC Outline 05/04 (R 05/05)

D. Existing Utilities: [Abandon] [Demolish within 5 feet (1.5 m) of building footprint]


[Demolish completely].

0.8 SITE RESTORATION

A. Below-Grade Areas: [Rough grade] [Fill].

0.9 DISPOSAL OF DEMOLISHED MATERIAL

A. Remove demolished material from site and dispose of [according to Division 01 Section
"Construction Waste Management and Disposal."] [in an EPA-approved landfill.]

END OF SECTION 024116

STRUCTURE DEMOLITION 024116 - 2