Copyright 2004 and 2005 AIA MASTERSPEC Outline 05/04 (R 05/05)
SECTION 024116 - STRUCTURE DEMOLITION
0.1 SUMMARY
A. Demolition and removal of buildings[ and site improvements].
0.2 QUALITY ASSURANCE
A. Quality Standard: ANSI A10.6 and NFPA 241.
0.3 PROJECT CONDITIONS
A. Hazardous Materials: [Removed prior to start of the Work] [Remediation specified
elsewhere in Contract Documents].
0.4 MATERIALS
A. Satisfactory Soils: Division 31 Section "Earth Moving."
0.5 EXAMINATION
A. [Perform] [Engage a professional engineer to perform] an engineering survey of condition of
building.
0.6 PREPARATION
A. Refrigerant: Remove according to 40 CFR 82.
B. Utility Shut Off: [Owner] [Contractor] [Divisions 15 and 16].
0.7 DEMOLITION
A. Use of explosives is[ not] permitted.
B. Salvage: Items to be salvaged and delivered to Owner are indicated [on Drawings.] [below:]
1. <Insert items to be salvaged.>
C. Below-Grade Construction: [Abandon] [Demolish within 5 feet (1.5 m) of building
footprint] [Demolish completely].
1. Remove [completely] [to at least 6 inches (150 mm) below grade] [to at least 12
inches (300 mm) below grade] [to depths indicated].
STRUCTURE DEMOLITION 024116 - 1
Copyright 2004 and 2005 AIA MASTERSPEC Outline 05/04 (R 05/05)
D. Existing Utilities: [Abandon] [Demolish within 5 feet (1.5 m) of building footprint]
[Demolish completely].
0.8 SITE RESTORATION
A. Below-Grade Areas: [Rough grade] [Fill].
0.9 DISPOSAL OF DEMOLISHED MATERIAL
A. Remove demolished material from site and dispose of [according to Division 01 Section
"Construction Waste Management and Disposal."] [in an EPA-approved landfill.]
END OF SECTION 024116