0% found this document useful (0 votes)
534 views1 page

Load Testing Cranes Circular

This document outlines requirements for load testing cranes with different maximum safe working loads (SWL). Cranes with a SWL of 100 tons or below must be tested at 125% of the SWL. Cranes above 100 tons but not more than 500 tons must be tested at 110% of the SWL. Cranes of 500 tons or more must be tested at 100% of the SWL. The crane owner must be informed of the crane's new SWL based on the test load. The original load chart must be verified and a new load chart provided if the SWL is reduced. Crane owners with moment indicators must replace them with accurate load radius indicators.

Uploaded by

Peter Ng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
534 views1 page

Load Testing Cranes Circular

This document outlines requirements for load testing cranes with different maximum safe working loads (SWL). Cranes with a SWL of 100 tons or below must be tested at 125% of the SWL. Cranes above 100 tons but not more than 500 tons must be tested at 110% of the SWL. Cranes of 500 tons or more must be tested at 100% of the SWL. The crane owner must be informed of the crane's new SWL based on the test load. The original load chart must be verified and a new load chart provided if the SWL is reduced. Crane owners with moment indicators must replace them with accurate load radius indicators.

Uploaded by

Peter Ng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ALL APPROVED PERSONS

LOAD TESTING OF CRANES

You are hereby required to carrying out load tests on cranes based on the following
requirements:
Maximum Safe Working Load (SWL) of Lifting Test Load Required on
Machine Lifting Machine
100 tons and below 125% of the SWL
Above 100 tons but not more than 500 tons 110% of the SWL
500 tons and above 100% of SWL

2. You are to inform the crane owner of the SWL of the crane you had approved after
the load test. This will allow the crane owner to be aware that his crane can only be rated
with a SWL corresponding to the weight of the test load used during the load testing.

3. You shall also verify and confirm if the original load chart is applicable to the SWL as
confirmed by the load test of the crane. When a crane is tested and given a reduced SWL,
please inform the owner that the crane’s original load chart will no longer apply. A new load
chart (eg. Modifying the existing load chart based on test load) for the “new” SWL shall be
provided by you to the owner to replace the previous load chart. You shall also ensure that
the load radius indicator is correspondingly re-programmed for the new SWL of the crane.

4. Should you encounter any crane installed with moment indicators, you are requested
to advise the occupier/crane owner to replace the moment indicator with an accurate load
radius indicator. You are reminded that you are not to approve any crane for use if the
crane has not been installed with an accurate load radius indicator.

Yours faithfully,

TAN GEOK LENG


for CHIEF INSPECTOR OF FACTORIES

Date of Issue Classification: Circular No: CIF A32.4.1

1 April 2003 General Policy OSD/ ENG CIR / LE 1/03 Page 1 of 1