Project File Index Sheet - README

This document provides a master document list for the Tanjung Jati B Expansion (Jawa-4) Coal Fired Steam Power Plant 2 x 1,000 MW project. The list includes over a dozen documents related to construction, commissioning, testing, and scheduling. Some documents have been updated, with their status changed from "RE" (revision required) to "AP" (approved). The timing of document submissions to BJP/OE is also noted for each item.

Uploaded by

Rustono R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views1 page

Project File Index Sheet - README

This document provides a master document list for the Tanjung Jati B Expansion (Jawa-4) Coal Fired Steam Power Plant 2 x 1,000 MW project. The list includes over a dozen documents related to construction, commissioning, testing, and scheduling. Some documents have been updated, with their status changed from "RE" (revision required) to "AP" (approved). The timing of document submissions to BJP/OE is also noted for each item.

Uploaded by

Rustono R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Tanjung Jati B Expansion (Jawa-4) Coal Fired Steam Power Plant 2 x 1,000 MW NTP > 31-Mar-17

Master Document List (EPC)

Item No. Type No. Document Number Issue Submission Timing Remarks B JP Sub missio n LOT'S Su bm ission
Purpose Lots to state reasons for the following: T iming DATE Tim ing DATE
This column is to inform Lots what Lots to State 1) Deletion of drawings in MDL
COMBINE Lot 1's Internal Doc No.
has EPC/IHE updated till Oct 18
STATUS Document Name (IFC/IFU/Only as Built) 2) Addition of drawings to MDL
Time Lots Submission 3) Change of Approval Status. i.e. "RE" to "AP"
Section TJB56 EPC / LOTS OFF / ON U5/U6/C KKSID DiscipID DocID SEQNo.
Base Timing
BJP Submission Timing

7.8 7 10-Jan-20 27-Dec-19


TJB56 L2 OFF C H F CMS 0001 TJB56-L2-OFF-C-H-F-CMS-0001 SUBMITTED Construction And Pre-Commissioning Package System Management Procedure AP NTP 143 145 Will only be submitted to BJP/OE for information since it is based on EPC/IHE's PIM plans
7.10 61 26-May-17 12-May-17
TJB56 L3 ON C 00 F SCH 1180 TJB56-L3-ON-C-00-F-SCH-1180 Updated SUBMITTED Overall Commissioning "Target" Schedule - Level 2 (Lot 3 Scope) RE NTP 6 8 WILL NOT BE SUBMITTED TO BJP/OE
5.13 5 13-Dec-19 29-Nov-19
TJB56 L1 OFF C SGA F PRO 3858 TJB56-L1-OFF-C-SGA-F-PRO-3858 7649787 Updated SUBMITTED Site Test and Commissioning Procedure for Fire Fighting System AP NTP 139 141
7.7 12 29-Jun-18 15-Jun-18
TJB56 L4 ON C UHN Q ITP 0004 TJB56-L4-ON-C-UHN-Q-ITP-0004 NOT SUBMITTED ITP Elevator Commissioning And Test AP NTP 63 65
7.7 14 29-Jun-18 15-Jun-18
TJB56 L4 ON C UHN Q ITP 0005 TJB56-L4-ON-C-UHN-Q-ITP-0005 NOT SUBMITTED ITP Aircraft Warning Lights Commissioning And Test AP NTP 63 65
7.10 1 31-Aug-18 17-Aug-18
TJB56 L4 ON C SAA F SCH 9931 TJB56-L4-ON-C-SAA-F-SCH-9931 NOT SUBMITTED Commissioning Work Schedule For HVAC AP NTP 72 74 WILL NOT BE SUBMITTED TO BJP/OE
7.10 2 31-Jan-20 17-Jan-20
TJB56 L4 ON C SGA F SCH 9932 TJB56-L4-ON-C-SGA-F-SCH-9932 NOT SUBMITTED Commissioning Work Schedule For Fire Fighting And Alarm AP NTP 146 148 WILL NOT BE SUBMITTED TO BJP/OE
7.10 3 1-May-20 17-Apr-20
TJB56 L4 ON C BMB F SCH 9933 TJB56-L4-ON-C-BMB-F-SCH-9933 NOT SUBMITTED Commissioning Work Schedule For Oily Drain System AP NTP 159 161 WILL NOT BE SUBMITTED TO BJP/OE
7.11 2 17-May-19 3-May-19
TJB56 L1 OFF C GM Q PRO 7505 TJB56-L1-OFF-C-GM-Q-PRO-7505 7650521 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for Sump Pump AP NTP 109 111
7.11 3 Commissioning Procedure - Function Test and Heat Run for Closed Cycle Cooling 17-May-19 3-May-19
TJB56 L1 OFF C PG Q PRO 7506 TJB56-L1-OFF-C-PG-Q-PRO-7506 7650522 NOT SUBMITTED AP NTP 109 111
Water Pump
7.11 4 17-May-19 3-May-19
TJB56 L1 OFF C PG Q PRO 7507 TJB56-L1-OFF-C-PG-Q-PRO-7507 7650523 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for Chemical Dosing System AP NTP 109 111
7.11 5 Commissioning Procedure - Function Test and Heat Run for Condensate Polishing 17-May-19 3-May-19
TJB56 L1 OFF C LD Q PRO 7508 TJB56-L1-OFF-C-LD-Q-PRO-7508 7650524 NOT SUBMITTED AP NTP 109 111
Plant
7.11 6 17-May-19 3-May-19
TJB56 L1 OFF C LCB Q PRO 7509 TJB56-L1-OFF-C-LCB-Q-PRO-7509 7650525 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for Condensate Pump AP NTP 109 111
7.11 7 Commissioning Procedure - Function Test and Heat Run for Condenser Leak 17-May-19 3-May-19
TJB56 L1 OFF C QUC F PRO 7510 TJB56-L1-OFF-C-QUC-F-PRO-7510 7650526 NOT SUBMITTED AP NTP 109 111
Detection System
7.11 8 17-May-19 3-May-19
TJB56 L1 OFF C XAV F PRO 7511 TJB56-L1-OFF-C-XAV-F-PRO-7511 7650527 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for MBFP Auxiliary Oil Pump AP NTP 109 111
7.11 9
TJB56 L1 OFF C LAC F PRO 7512 TJB56-L1-OFF-C-LAC-F-PRO-7512 7650528 NOT SUBMITTED
Commissioning Procedure - Function Test and Heat Run for Motor Driven Boiler Feed
AP NTP 109 111
17-May-19 3-May-19
Water Pump
7.11 10
TJB56 L1 OFF C MAJ F PRO 7513 TJB56-L1-OFF-C-MAJ-F-PRO-7513 7650529 NOT SUBMITTED
Commissioning Procedure - Function Test and Heat Run for Condenser Vacuum
AP NTP 109 111
17-May-19 3-May-19
Pump
7.11 11 17-May-19 3-May-19
TJB56 L1 OFF C MAW F PRO 7514 TJB56-L1-OFF-C-MAW-F-PRO-7514 7650530 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for Gland Steam Exhauster AP NTP 109 111
7.11 12 17-May-19 3-May-19
TJB56 L1 OFF C MAX F PRO 7515 TJB56-L1-OFF-C-MAX-F-PRO-7515 7650531 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for EHC Oil Unit AP NTP 109 111
7.11 13 Commissioning Procedure - Function Test and Heat Run for S team Turbine Lube Oil 17-May-19 3-May-19
TJB56 L1 OFF C MAV F PRO 7516 TJB56-L1-OFF-C-MAV-F-PRO-7516 7650532 NOT SUBMITTED AP NTP 109 111
Pumps
7.11 14 Commissioning Procedure - Function Test and Heat Run for Steam Turbine Turning 17-May-19 3-May-19
TJB56 L1 OFF C MAK F PRO 7517 TJB56-L1-OFF-C-MAK-F-PRO-7517 7650533 NOT SUBMITTED AP NTP 109 111
Gear
7.11 15 17-May-19 3-May-19
TJB56 L1 OFF C XAV F PRO 7518 TJB56-L1-OFF-C-XAV-F-PRO-7518 7650534 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for BFPT Lube Oil Pumps AP NTP 109 111
7.11 16 17-May-19 3-May-19
TJB56 L1 OFF C XAA F PRO 7519 TJB56-L1-OFF-C-XAA-F-PRO-7519 7650535 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for BFPT Turning Gear AP NTP 109 111
7.11 17 17-May-19 3-May-19
TJB56 L1 OFF C 00 F PRO 7520 TJB56-L1-OFF-C-00-F-PRO-7520 7650536 NOT SUBMITTED Commissioning Procedure - Interlock Test for Steam Turbine AP NTP 109 111
7.11 18 17-May-19 3-May-19
TJB56 L1 OFF C XAA F PRO 7521 TJB56-L1-OFF-C-XAA-F-PRO-7521 7650537 NOT SUBMITTED Commissioning Procedure - Interlock Test for BFP Turbine AP NTP 109 111
7.11 19 17-May-19 3-May-19
TJB56 L1 OFF C XAA F PRO 7522 TJB56-L1-OFF-C-XAA-F-PRO-7522 7650538 NOT SUBMITTED Commissioning Procedure - BFPT Indivisual Operation Test AP NTP 109 111
7.11 20 17-May-19 3-May-19
TJB56 L1 OFF C XAA F PRO 7523 TJB56-L1-OFF-C-XAA-F-PRO-7523 7650539 NOT SUBMITTED Commissioning Procedure - BFPT Couple Run Operation Test AP NTP 109 111
7.11 21 17-May-19 3-May-19
TJB56 L1 OFF C MAG F PRO 7524 TJB56-L1-OFF-C-MAG-F-PRO-7524 7650540 NOT SUBMITTED Commissioning Procedure - Condenser Vacuum Up Test AP NTP 109 111
7.11 22 17-May-19 3-May-19
TJB56 L1 OFF C 00 F PRO 7525 TJB56-L1-OFF-C-00-F-PRO-7525 7650541 NOT SUBMITTED Commissioning Procedure - Turbine Stretch Out AP NTP 109 111
7.11 23 17-May-19 3-May-19
TJB56 L1 OFF C 00 F PRO 7526 TJB56-L1-OFF-C-00-F-PRO-7526 7650542 NOT SUBMITTED Commissioning Procedure - No Load Test AP NTP 109 111
7.11 24 17-May-19 3-May-19
TJB56 L1 OFF C 00 F PRO 7527 TJB56-L1-OFF-C-00-F-PRO-7527 7650543 NOT SUBMITTED Commissioning Procedure - Turbine Load Operation Test AP NTP 109 111
7.11 25 17-May-19 3-May-19
TJB56 L1 OFF C 00 F PRO 7528 TJB56-L1-OFF-C-00-F-PRO-7528 7650544 NOT SUBMITTED Commissioning Procedure - Load Rejection Test AP NTP 109 111
7.11 26 17-May-19 3-May-19
TJB56 L1 OFF C 00 F PRO 7529 TJB56-L1-OFF-C-00-F-PRO-7529 7650545 NOT SUBMITTED Commissioning Procedure - BFP Run Back Test AP NTP 109 111
7.11 27 17-May-19 3-May-19
TJB56 L1 OFF C 00 F PRO 7530 TJB56-L1-OFF-C-00-F-PRO-7530 7650546 NOT SUBMITTED Commissioning Procedure - Heater Bypass Test AP NTP 109 111
7.11 28 17-May-19 3-May-19
TJB56 L1 OFF C MKW F PRO 7531 TJB56-L1-OFF-C-MKW-F-PRO-7531 7650547 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for Main Seal Oil Pump AP NTP 109 111
7.11 29
TJB56 L1 OFF C MKW F PRO 7532 TJB56-L1-OFF-C-MKW-F-PRO-7532 7650548 NOT SUBMITTED
Commissioning Procedure - Function Test and Heat Run for Emergency Seal Oil
AP NTP 109 111
17-May-19 3-May-19
Pump
7.11 30 TJB56 L1 OFF C MKF F PRO 7533 TJB56-L1-OFF-C-MKF-F-PRO-7533 7650549 NOT SUBMITTED Commissioning Procedure - Function Test and Heat Run for Stator Cooling Water AP NTP 109 111
17-May-19 3-May-19
Pump
7.11 31 17-May-19 3-May-19
TJB56 L1 OFF C MKW F PRO 7534 TJB56-L1-OFF-C-MKW-F-PRO-7534 7650550 NOT SUBMITTED Commissioning Procedure - Function Test for Seal Oil System AP NTP 109 111
7.11 32 17-May-19 3-May-19
TJB56 L1 OFF C MKF F PRO 7535 TJB56-L1-OFF-C-MKF-F-PRO-7535 7650551 NOT SUBMITTED Commissioning Procedure - Function Test for Stator Winding Cooling System AP NTP 109 111
7.11 33 17-May-19 3-May-19
TJB56 L1 OFF C MKA F PRO 7536 TJB56-L1-OFF-C-MKA-F-PRO-7536 7650552 NOT SUBMITTED Commissioning Procedure - Polarization Index Stator Windings AP NTP 109 111
7.11 34 17-May-19 3-May-19
TJB56 L1 OFF C MKA F PRO 7537 TJB56-L1-OFF-C-MKA-F-PRO-7537 7650553 NOT SUBMITTED Commissioning Procedure - Generator Air Leakage Test AP NTP 109 111
7.11 35 17-May-19 3-May-19
TJB56 L1 OFF C MKG F PRO 7538 TJB56-L1-OFF-C-MKG-F-PRO-7538 7650554 NOT SUBMITTED Commissioning Procedure - Hydrogen Gas Filling into Generator AP NTP 109 111
7.11 36 17-May-19 3-May-19
TJB56 L1 OFF C MKG F PRO 7539 TJB56-L1-OFF-C-MKG-F-PRO-7539 7650555 NOT SUBMITTED Commissioning Procedure - Hydrogen Gas Release from Generator AP NTP 109 111
7.11 37 17-May-19 3-May-19
TJB56 L1 OFF C MKA F PRO 7540 TJB56-L1-OFF-C-MKA-F-PRO-7540 7650556 NOT SUBMITTED Commissioning Procedure - Generator Operation Test AP NTP 109 111
7.11 38 17-May-19 3-May-19
TJB56 L1 OFF C CS F PRO 7541 TJB56-L1-OFF-C-CS-F-PRO-7541 7650557 SUBMITTED Commissioning Procedure - Calibration for Instrument AP NTP 109 111
7.11 39 8-Feb-19 25-Jan-19
TJB56 L1 OFF C MA F PRO 7500 TJB56-L1-OFF-C-MA-F-PRO-7500 7650516 NOT SUBMITTED Commissioning Procedure - Precommissioning for Motor Operated Valve AP NTP 95 97
7.11 40 8-Feb-19 25-Jan-19
TJB56 L1 OFF C MA F PRO 7501 TJB56-L1-OFF-C-MA-F-PRO-7501 7650517 NOT SUBMITTED Commissioning Procedure - Precommissioning for Turbine Modulating Control AP NTP 95 97
7.11 41
TJB56 L1 OFF C CWE F PRO 7502 TJB56-L1-OFF-C-CWE-F-PRO-7502 7650518 NOT SUBMITTED
Commissioning Procedure - Precommissioning for Vibration Monitorinig System
AP NTP 109 111
17-May-19 3-May-19
(VMS)
7.11 42
TJB56 L1 OFF C CFA F PRO 7503 TJB56-L1-OFF-C-CFA-F-PRO-7503 7650519 NOT SUBMITTED
Commissioning Procedure - Precommissioning for Turbine Supervisory Instrument
AP NTP 109 111
17-May-19 3-May-19
(TSI)
7.11 43 17-May-19 3-May-19
TJB56 L1 OFF C QUA F PRO 7504 TJB56-L1-OFF-C-QUA-F-PRO-7504 7650520 NOT SUBMITTED Commissioning Procedure - Precommissioning for Sampling System AP NTP 109 111
7.11 44 17-May-19 3-May-19
TJB56 L1 OFF C CB F PRO 7542 TJB56-L1-OFF-C-CB-F-PRO-7542 7650558 SUBMITTED Commissioning Procedure - Restoration Test for DCS AP NTP 109 111
7.11 45 17-May-19 3-May-19
TJB56 L1 OFF C CB F PRO 7543 TJB56-L1-OFF-C-CB-F-PRO-7543 7650559 SUBMITTED Commissioning Procedure - I/O Signal Check for DCS AP NTP 109 111
7.11 46 17-May-19 3-May-19
TJB56 L1 OFF C MAJ F PRO 7544 TJB56-L1-OFF-C-MAJ-F-PRO-7544 7650560 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for Condenser Vacuum up Master AP NTP 109 111
7.11 47
TJB56 L1 OFF C MAJ F PRO 7545 TJB56-L1-OFF-C-MAJ-F-PRO-7545 7650561 NOT SUBMITTED
Commissioning Procedure - Sequence Master Test for Condenser Vacuum Break
AP NTP 109 111
17-May-19 3-May-19
Master
7.11 48 TJB56 L1 OFF C LCA F PRO 7546 TJB56-L1-OFF-C-LCA-F-PRO-7546 7650562 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for Condensate Cleanup (Blow) AP NTP 109 111
17-May-19 3-May-19
Master
7.11 49 TJB56 L1 OFF C LCA F PRO 7547 TJB56-L1-OFF-C-LCA-F-PRO-7547 7650563 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for Condensate Cleanup AP NTP 109 111
17-May-19 3-May-19
(Recirculation) Master
7.11 50 17-May-19 3-May-19
TJB56 L1 OFF C LCA F PRO 7548 TJB56-L1-OFF-C-LCA-F-PRO-7548 7650564 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for LP Cleanup (Blow) Master AP NTP 109 111
7.11 51 Commissioning Procedure - Sequence Master Test for LP Cleanup (Recirculation) 17-May-19 3-May-19
TJB56 L1 OFF C LCA F PRO 7549 TJB56-L1-OFF-C-LCA-F-PRO-7549 7650565 NOT SUBMITTED AP NTP 109 111
Master
7.11 52 17-May-19 3-May-19
TJB56 L1 OFF C LAB F PRO 7550 TJB56-L1-OFF-C-LAB-F-PRO-7550 7650566 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for HP Cleanup (Blow) Master AP NTP 109 111
7.11 53 Commissioning Procedure - Sequence Master Test for HP Cleanup (Recirculation) 17-May-19 3-May-19
TJB56 L1 OFF C LAB F PRO 7551 TJB56-L1-OFF-C-LAB-F-PRO-7551 7650567 NOT SUBMITTED AP NTP 109 111
Master
7.11 54 17-May-19 3-May-19
TJB56 L1 OFF C MAA F PRO 7552 TJB56-L1-OFF-C-MAA-F-PRO-7552 7650568 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for HPT Warming Start Master AP NTP 109 111
7.11 55 17-May-19 3-May-19
TJB56 L1 OFF C MAA F PRO 7553 TJB56-L1-OFF-C-MAA-F-PRO-7553 7650569 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for HPT Warming Stop Master AP NTP 109 111
7.11 56 17-May-19 3-May-19
TJB56 L1 OFF C LBQ F PRO 7554 TJB56-L1-OFF-C-LBQ-F-PRO-7554 7650570 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for LP Extraction Start Master AP NTP 109 111
7.11 57 17-May-19 3-May-19
TJB56 L1 OFF C LBQ F PRO 7555 TJB56-L1-OFF-C-LBQ-F-PRO-7555 7650571 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for LP Extraction Stop Master AP NTP 109 111
7.11 58 17-May-19 3-May-19
TJB56 L1 OFF C LBQ F PRO 7556 TJB56-L1-OFF-C-LBQ-F-PRO-7556 7650572 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for HP Extraction Start Master AP NTP 109 111
7.11 59 17-May-19 3-May-19
TJB56 L1 OFF C LBQ F PRO 7557 TJB56-L1-OFF-C-LBQ-F-PRO-7557 7650573 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for HP Extraction Stop Master AP NTP 109 111
7.11 60 Commissioning Procedure - Sequence Master Test for LP Heater Drain Condenser 17-May-19 3-May-19
TJB56 L1 OFF C LCJ F PRO 7558 TJB56-L1-OFF-C-LCJ-F-PRO-7558 7650574 NOT SUBMITTED AP NTP 109 111
Collection Master
7.11 61 Commissioning Procedure - Sequence Master Test for HP Heater Drain Condenser 17-May-19 3-May-19
TJB56 L1 OFF C LCJ F PRO 7559 TJB56-L1-OFF-C-LCJ-F-PRO-7559 7650575 NOT SUBMITTED AP NTP 109 111
Collection Master
7.11 62
TJB56 L1 OFF C LCJ F PRO 7560 TJB56-L1-OFF-C-LCJ-F-PRO-7560 7650576 NOT SUBMITTED
Commissioning Procedure - Sequence Master Test for HP Heater Drain Deaerator
AP NTP 109 111
17-May-19 3-May-19
Collection Master
7.11 63 17-May-19 3-May-19
TJB56 L1 OFF C LAC F PRO 7561 TJB56-L1-OFF-C-LAC-F-PRO-7561 7650577 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for MBFP Service-In Master AP NTP 109 111
7.11 64 17-May-19 3-May-19
TJB56 L1 OFF C LAC F PRO 7562 TJB56-L1-OFF-C-LAC-F-PRO-7562 7650578 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for 1st TBFP Service-In Master AP NTP 109 111
7.11 65 17-May-19 3-May-19
TJB56 L1 OFF C LAC F PRO 7563 TJB56-L1-OFF-C-LAC-F-PRO-7563 7650579 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for 2nd TBFP Service-In Master AP NTP 109 111

7.11 66 17-May-19 3-May-19


TJB56 L1 OFF C LAC F PRO 7564 TJB56-L1-OFF-C-LAC-F-PRO-7564 7650580 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for MBFP Service-Out Master AP NTP 109 111

7.11 67 17-May-19 3-May-19


TJB56 L1 OFF C LAC F PRO 7565 TJB56-L1-OFF-C-LAC-F-PRO-7565 7650581 NOT SUBMITTED Commissioning Procedure - Sequence Master Test for TBFP Service-Out Master AP NTP 109 111
7.11 68 17-May-19 3-May-19
TJB56 L1 OFF C CHC F PRO 7566 TJB56-L1-OFF-C-CHC-F-PRO-7566 7650582 NOT SUBMITTED Commissioning Procedure - Function Test for Plant Automation System AP NTP 109 111
7.11 69 17-May-19 3-May-19
TJB56 L1 OFF C MKC F PRO 7567 TJB56-L1-OFF-C-MKC-F-PRO-7567 7650583 NOT SUBMITTED Commissioning Procedure - Function Test for Excitation Transformer AP NTP 109 111
7.11 70 17-May-19 3-May-19
TJB56 L1 OFF C CHC F PRO 7568 TJB56-L1-OFF-C-CHC-F-PRO-7568 7650584 NOT SUBMITTED Commissioning Procedure - Setting for Generator & Transformer Protection Relay AP NTP 109 111
7.11 71 17-May-19 3-May-19
TJB56 L1 OFF C BA F PRO 7569 TJB56-L1-OFF-C-BA-F-PRO-7569 7650585 NOT SUBMITTED Commissioning Procedure - Measurement for Generator VT/CT Polality AP NTP 109 111
7.11 72
TJB56 L1 OFF C BA F PRO 7570 TJB56-L1-OFF-C-BA-F-PRO-7570 7650586 NOT SUBMITTED
Commissioning Procedure - Measurement for Generator Current and Phase Angle On
AP NTP 109 111
17-May-19 3-May-19
Load Operation
7.11 73
TJB56 L1 OFF C BA F PRO 7571 TJB56-L1-OFF-C-BA-F-PRO-7571 7650587 NOT SUBMITTED
Commissioning Procedure - Measurement for Phase Rotation before 500kV Power
AP NTP 109 111
17-May-19 3-May-19
Receiving
7.11 74 17-May-19 3-May-19
TJB56 L1 OFF C CGA F PRO 7572 TJB56-L1-OFF-C-CGA-F-PRO-7572 7650588 NOT SUBMITTED Commissioning Procedure - Restoration Test for AVR AP NTP 109 111
7.11 75 17-May-19 3-May-19
TJB56 L1 OFF C CGA F PRO 7573 TJB56-L1-OFF-C-CGA-F-PRO-7573 7650589 NOT SUBMITTED Commissioning Procedure - Dynamic Characteristic Test for AVR AP NTP 109 111
7.11 76 17-May-19 3-May-19
TJB56 L1 OFF C CJJ F PRO 7574 TJB56-L1-OFF-C-CJJ-F-PRO-7574 7650590 SUBMITTED Commissioning Procedure - Restoration Test for MT DEHC AP NTP 109 111
7.11 77 17-May-19 3-May-19
TJB56 L1 OFF C CJJ F PRO 7575 TJB56-L1-OFF-C-CJJ-F-PRO-7575 7650591 SUBMITTED Commissioning Procedure - Function Test for MT DEHC AP NTP 109 111
7.11 78 17-May-19 3-May-19
TJB56 L1 OFF C CJJ F PRO 7576 TJB56-L1-OFF-C-CJJ-F-PRO-7576 7650592 SUBMITTED Commissioning Procedure - Restoration Test for BFPT DEHC AP NTP 109 111
7.11 79 17-May-19 3-May-19
TJB56 L1 OFF C CJJ F PRO 7577 TJB56-L1-OFF-C-CJJ-F-PRO-7577 7650593 SUBMITTED Commissioning Procedure - Function Test for BFPT DEHC AP NTP 109 111
7.11 80 17-May-19 3-May-19
TJB56 L1 OFF C BAC F PRO 7578 TJB56-L1-OFF-C-BAC-F-PRO-7578 7650594 NOT SUBMITTED Commissioning Procedure - Operation Test for GCB Synchronization AP NTP 109 111
7.11 81 17-May-19 3-May-19
TJB56 L1 OFF C BAC F PRO 7579 TJB56-L1-OFF-C-BAC-F-PRO-7579 7650595 NOT SUBMITTED Commissioning Procedure - Operation Test for Generator Synchronization AP NTP 109 111
7.11 82 17-May-19 3-May-19
TJB56 L1 OFF C MKA F PRO 7580 TJB56-L1-OFF-C-MKA-F-PRO-7580 7650596 NOT SUBMITTED Commissioning Procedure - Measurement for Generator BCT/VT Burden Circuit AP NTP 109 111
7.11 83 17-May-19 3-May-19
TJB56 L1 OFF C MKA F PRO 7581 TJB56-L1-OFF-C-MKA-F-PRO-7581 7650597 NOT SUBMITTED Commissioning Procedure - Measurement for Generator VT Secondary Voltage AP NTP 109 111
7.11 84 17-May-19 3-May-19
TJB56 L1 OFF C MKA F PRO 7582 TJB56-L1-OFF-C-MKA-F-PRO-7582 7650598 NOT SUBMITTED Commissioning Procedure - Interlock Test for Generator AP NTP 109 111

7.10 1 10-Jan-20 27-Dec-19


TJB56 L2 OFF U5 H F CTP 0001 TJB56-L2-OFF-U5-H-F-CTP-0001 Updated NOT SUBMITTED Commissioning Schedule For Boiler AP NTP 143 145 WILL NOT BE SUBMITTED TO BJP/OE

7.10 2 12-Jun-20 29-May-20


TJB56 L2 OFF U6 H F CTP 0001 TJB56-L2-OFF-U6-H-F-CTP-0001 Updated NOT SUBMITTED Commissioning Schedule For Boiler AP NTP 165 167 WILL NOT BE SUBMITTED TO BJP/OE
7.11 1 31-Aug-18 17-Aug-18
TJB56 L4 ON C SAA F PRO 9941 TJB56-L4-ON-C-SAA-F-PRO-9941 NOT SUBMITTED Commissioning Manual For HVAC AP NTP 72 74
7.11 2 31-Jan-20 17-Jan-20
TJB56 L4 ON C SGA F PRO 9942 TJB56-L4-ON-C-SGA-F-PRO-9942 NOT SUBMITTED Commissioning Manual For Fire Fighting And Alarm AP NTP 146 148
7.11 3 1-May-20 17-Apr-20
TJB56 L4 ON C BMB F PRO 9943 TJB56-L4-ON-C-BMB-F-PRO-9943 NOT SUBMITTED Commissioning Manual For Oily Drain System AP NTP 159 161
7.12 85
TJB56 L1 OFF C LCB F PRO 7583 TJB56-L1-OFF-C-LCB-F-PRO-7583 7650599 NOT SUBMITTED
Commissioning Procedure - Function Test and Heat Run for Condensate Booster
AP NTP 109 111
17-May-19 3-May-19
Pump
7.11 3 10-Jan-20 27-Dec-19
TJB56 L2 OFF C H F CTP 0002 TJB56-L2-OFF-C-H-F-CTP-0002 NOT SUBMITTED Commissioning Test Procedure for Boiler AP NTP 143 145
7.13 86
TJB56 L1 OFF C PCB F PRO 7584 TJB56-L1-OFF-C-PCB-F-PRO-7584 7650600 NOT SUBMITTED
Commissioning Procedure - Function Test and Heat Run for Auxiliary Cooling Water
AP NTP 109 111
17-May-19 3-May-19
Pump
7.10 63 28-Dec-18 14-Dec-18
TJB56 L3 ON C 00 F SCH 1182 TJB56-L3-ON-C-00-F-SCH-1182 Updated NOT SUBMITTED Commissioning Work Schedules RE NTP 89 91 WILL NOT BE SUBMITTED TO BJP/OE, Detailed commissioning work schedules as necessary

Page 1 of 132