0% found this document useful (0 votes)
285 views4 pages

Jadwal Training 2019 Jakarta

This document provides a schedule of training programs in various categories like maritime, safety, security, survey, crewing, environment, and ship design offered by BKI Academy in Jakarta throughout 2019. It lists 53 total programs along with their investment costs in basic, professional and business levels, duration, and months offered. The majority of programs are 3-5 days long and offered across multiple months of the year with some concentration in early 2019 for maritime safety programs and mid-2019 for occupational health and safety certification programs.

Uploaded by

Tsudjatmiko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
285 views4 pages

Jadwal Training 2019 Jakarta

This document provides a schedule of training programs in various categories like maritime, safety, security, survey, crewing, environment, and ship design offered by BKI Academy in Jakarta throughout 2019. It lists 53 total programs along with their investment costs in basic, professional and business levels, duration, and months offered. The majority of programs are 3-5 days long and offered across multiple months of the year with some concentration in early 2019 for maritime safety programs and mid-2019 for occupational health and safety certification programs.

Uploaded by

Tsudjatmiko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

JADWAL TRAINING TAHUN 2019 di JAKARTA

BKI ACADEMY - PT. BIRO KLASIFIKASI INDONESIA (Persero)

INVESTASI BULAN
NO. PROGRAM TRAINING DURASI
BASIC PROFESSIONAL BUSINESS JAN FEB MAR APR MEI JUN JUL AUG SEP OKT NOV DES
I KATEGORI MARITIM
A BIDANG SAFETY
1 Internal Auditor ISM Code 7,150,000 8,717,500 9,790,000 3 Hari 9-11 13-15 12-14 11-13 6-8
2 Designated Person Ashore ISM Code 7,700,000 9,267,500 10,340,000 3 Hari 13-15 10-12 10-12 9-11 11-13
3 Risk Assessment ISM Code 6,600,000 8,167,500 9,240,000 3 Hari 8-10 7-9 13-15
4 Marine Accident & Investigation 6,600,000 8,167,500 9,240,000 3 Hari 24-26 18-20 18-20
5 IMDG Code 6,600,000 8,167,500 9,240,000 3 Hari 16-18 8-10 4-6

B BIDANG SECURITY
6 Internal Auditor ISPS Code 6,600,000 8,167,500 9,240,000 3 Hari 6-8 8-10 1-3 2-4 4-6
7 CSO ISPS Code 6,600,000 8,167,500 9,240,000 3 Hari 20-22 7-9 5-7 7-9 2-4
8 PFSO ISPS Code 7,700,000 9,267,500 10,340,000 3 Hari 10-12 21-23 19-21 21-23 16-18

C BIDANG SURVEY
9 Marine Surveyor 9,900,000 12,512,500 14,300,000 5 Hari 4-8 8-12 15-19 9-13 4-8
10 New Building Supervision*) 8,800,000 11,412,500 13,200,000 5 Hari

D BIDANG CREWING
11 Marine Labour Convention 2006 7,150,000 8,717,500 9,790,000 3 Hari 22-24 25-27 9-11

E BIDANG ENVIRONMENT
12 Ballast Water Management 6,600,000 8,167,500 9,240,000 3 Hari 24-26 21-23 18-20
13 Marpol Oil Outflow 6,600,000 8,167,500 9,240,000 3 Hari 12-14 12-14 13-15

F BIDANG SHIP DESIGN


14 Intact Stability Assessment 6,600,000 8,167,500 9,240,000 3 Hari 4-6 1-3 4-6
15 Ship Handling & Maneuvering 6,600,000 8,167,500 9,240,000 3 Hari 8-10 5-7 9-11
16 Damage Stabilty Assessment 6,600,000 8,167,500 9,240,000 3 Hari 11-13 10-12 7-9

G BIDANG IMO MODEL COURSE


17 6.09 Training Of Trainer (TOT) 8,800,000 14,547,500 18,480,000 8 Hari 19-30 13-23 16-26
3.24 Security Awareness Training For Port
18 2 Hari
Facility Personal with Designated Security
Duties *)
3.25 Security Awareness Training for all
19 1 Hari
Port Facility Personnel *)
3.11 Safety Investigation Into Marine
20 7,700,000 10,312,500 12,100,000 5 Hari 25-29 22-26 25-29
Casualties & Marine Incidents
3.27 Security Awareness Training For All
21 1 Hari
Seafarers *)

II KATEGORI KESELAMATAN & KESEHATAN


A KERJA
SERTIFIKASI KEMNAKER
22 Ahli K3 Umum 8,500,000 14,770,000 19,060,000 12 Hari 1-16 11-26
23 Ahli K3 Umum Weekend 9,000,000 16,315,000 21,320,000 12 Hari 6 Jul-11 Agt 5 Okt-10 Nov
24 Ahli K3 Pesawat Angkat dan Angkut 23,000,000 36,062,500 45,000,000 25 Hari 9 Apr-3 19 Agt-12 Sep 18 Nov-12 Des
25 Ahli K3 Elevator & Escavator 16,500,000 19,112,500 20,900,000 12 Hari Mei 24-28 21-25
26 Ahli K3 Listrik 15,000,000 21,270,000 25,560,000 12 Hari 6-28 2-24
27 Ahli K3 Pesawat Uap & Bejana Tekan 23,000,000 36,062,500 45,000,000 25 Hari 17 Jun-11 Jul 14 Okt-7 Nov
28 Ahli K3 Pesawat Uap & Tangki Timbun 23,000,000 36,062,500 45,000,000 25 Hari 1-25 11 Nov-4 Des
29 Ahli K3 Pesawat Tenaga Produksi 23,000,000 36,062,500 45,000,000 25 Hari 24 Jun-18 Jul 26 Nov-20 Des
30 Ahli K3 Kebakaran Kelas D 4,950,000 6,517,500 7,590,000 3 Hari 8-10 11-13
31 Auditor SMK 3 5,500,000 7,590,000 9,020,000 4 Hari 13-16 23-26
32 Operator K3 Forklift 4,500,000 6,067,500 7,140,000 3 Hari 22-24 26-28 16-18
33 Operator K3 Crane (Kelas I/Kelas II/Kelas 6,500,000 8,067,500 9,140,000 3 Hari 22-24 5-7 5-7
34 III)
Operator K3 Alat Berat 8,250,000 10,340,000 11,770,000 4 Hari 23-26 2-5 1-4
35 Operator K3 Rigger 4,500,000 6,067,500 7,140,000 3 Hari 9-11 11-13
36 Working at Height 7,150,000 8,717,500 9,790,000 3 Hari 14-16 8-10
37 Working at Confined Space 7,150,000 9,762,500 11,550,000 5 Hari 15-19 25-29
38 P3K di Tempat Kerja 4,950,000 6,517,500 7,590,000 3 Hari 8-10 22-24
1
B SERTIFIKASI BNSP
39 Ahli K3 Muda 5,500,000 7,590,000 9,020,000 4 Hari 23-26 29-31 28-31
40 Ahli K3 Madya 7,150,000 9,762,500 11,550,000 5 Hari 20-24 12-16 18-22
41 Ahli K3 Utama 8,250,000 10,862,500 12,650,000 5 Hari 24-28 9-13 2-6
42 Auditor SMK3 5,500,000 7,590,000 9,020,000 4 Hari 13-16 19-22
43 HAZOPS 5,500,000 7,590,000 9,020,000 4 Hari 8-11 16-19 14-17
44 Petugas K3 Laboratorium 4,950,000 6,517,500 7,590,000 3 Hari 25-27 24-26 9-11
45 Petugas P3K 4,950,000 6,517,500 7,590,000 3 Hari 21-23 7-9 13-15
46 Operator K3 Migas 6,050,000 8,140,000 9,570,000 4 Hari 6-9 20-23 27-29
47 Pengawas K3 Migas 7,425,000 10,037,500 11,825,000 5 Hari 22-26 24-28 16-20 16-20
48 Pengawas Utama K3 Migas 8,800,000 11,412,500 13,200,000 5 Hari 13-17 26-30

C SERTIFIKASI OSH ACADEMY


49 Safety Manager 7,700,000 9,790,000 11,220,000 4 Hari 1-4 15-18
50 Safety Supervisor 6,875,000 8,442,500 9,515,000 3 Hari 23-25 8-11 19-21
51 Oil & Gas Safety Operation 5,500,000 7,067,500 8,140,000 3 Hari 23-25 28-30 3-5
52 Process Safety Management 6,050,000 7,617,500 8,690,000 3 Hari 22-24 18-20
53 Behavior Based Safety (BBS) 5,500,000 7,067,500 8,140,000 3 Hari 16-18 26-28

D SERTIFIKASI BRITISH SAFETY COUNCIL


NEBOSH International General Certificate
54 1,349 1,498 2,040 18-28 1-12 19-29 21-31 02-12
in Occupational Health and Safety 11 Hari
55 IOSH Managing Safely 369 780 620 4 Hari 11-13 05-07 16-18
IIIKATEGORI ENERGI
A BIDANG MIGAS
56Welding Inspector 18,700,000 32,285,000 41,580,000 28 Hari 11 Mar-12 Apr 1 Jul-1 Agt 4 Nov-4 Des
57Inspektur Instalasi 26,400,000 30,580,000 33,440,000 8 Hari 17-18 6-8
58Inspektur Katup Pengaman & Pemutus 17,050,000 20,185,000 22,330,000 6 Hari 22-27 21-26
59Segel
Inspektur Bejana Tekan 17,000,000 24,315,000 29,320,000 14 hari 22 Apr- 9-22
60Inspektur Tangki Penimbun 17,000,000 24,315,000 29,320,000 14 hari 8 Mei 19-27 9-17
61Inspektur Pesawat Angkat 18,000,000 25,315,000 30,320,000 14 Hari 22 Apr- 8 Mei 3-11 18-26
62Inspektur Peralatan Putar/Rotating 16,000,000 21,225,000 24,800,000 10 hari 22-28 9-15 1-9
63EquipmentPlatform
Inspektur 18,000,000 23,225,000 26,800,000 10 Hari 20-28 1-8 13-21
64Inspektur Kelistrikan 16,000,000 20,180,000 23,040,000 8 hari 25-31 25-30 17-23 10-16
65Inspektur Pipa Penyalur 17,000,000 24,315,000 29,320,000 14 Hari 22 Apr- 16-22 14-22
66Inspektur Sistem Alat Ukur Serah Terima 17,000,000 22,225,000 25,800,000 10 Hari 8 Mei 17-22 10-16 17-23
67Inspektur RIG 19,000,000 22,135,000 24,280,000 6 Hari 26-28 27-29
68Inspektur K3 15,400,000 17,490,000 18,920,000 4 Hari 24-26 3-5 18-20
69Inspektur Lifting Equipment 14,500,000 17,635,000 19,780,000 6 Hari
70Sertifikasi Peralatan di Lingkungan Migas 8,800,000 10,367,500 11,440,000 3 Hari 14-16 18-20
71Inspeksi Teknik 7,150,000 8,717,500 9,790,000 3 Hari 19-21 13-15
Inspeksi Pengelasan untuk Non Welding
72 6,600,000 8,167,500 9,240,000 3 Hari 24-26 18-19
Inspector
73 Lifting Rigging/Juru Ikat Beban 6,600,000 8,167,500 9,240,000 3 Hari 23-25 13-15 16-18
74 Risk Assessment For Offshore Installations 9,900,000 11,990,000 13,420,000 4 Hari 19-22 16-19

B BIDANG MINERBA
75 Pengawas Operasional Pertama 9,900,000 11,990,000 13,420,000 4 Hari 20-23 20-23
76 Pertambangan
Pengawas (POP) Madya
Operasional 12,100,000 15,235,000 17,380,000 5 Hari 22-26 7-11
77 Pertambangan
Pengawas (POM) Utama
Operasional 14,300,000 17,435,000 19,580,000 6 Hari 1-6 1-6 1-6
78 Pertambangan
Petugas (POU)
Pengambil Contoh Uji Batubara 8,250,000 9,295,000 10,010,000 2 Hari 1-2 10-11
79 (Sampler)
Petugas Penguji Contoh Uji Batubara 9,350,000 10,395,000 11,110,000 2 Hari 9-10 12-13
80 (Analis) Verifikasi Teknis Batubara
Petugas 9,350,000 10,395,000 11,110,000 2 Hari 19-20 24-25 20-21
81 (Surveyor)
Petugas Verifikasi Administrasi Batubara 9,350,000 10,395,000 11,110,000 2 Hari 21-22 7-8 16-17
82 (Verifikator) Tambang Terbuka Jangka
Perencanaan 16,500,000 20,157,500 22,660,000 7 Hari 13-19 14-15
83 Panjang NQF 6Tambang Terbuka Jangka
Perencanaan 11,000,000 13,090,000 14,520,000 4 Hari 15-18 16-19
84 Panjang NQF 4Tambang Terbuka Jangka
Perencanaan 13,200,000 15,812,500 17,600,000 5 Hari 8-12 8-12 11-15
85 Panjang Penambangan
Operasi NQF 5 NQF 4 18,700,000 23,925,000 27,500,000 10 Hari 18-27 5-14 2-11
86 Operasi Penambangan NQF 5 19,800,000 25,025,000 28,600,000 10 Hari 15-24 4-13
87 Geologi/Eksplorasi NQF 4 15,400,000 18,535,000 20,680,000 6 Hari 22-27 20-26
88 Geologi/Eksplorasi NQF 5 16,500,000 20,157,500 22,660,000 7 Hari 18-24 19-25 16-22
Manajemen Perawatan Peralatan Tambang
89 13,200,000 15,812,500 17,600,000 5 Hari 25-29 1-5 22-26
NQF 4

90 Manajemen Perawatan Peralatan Tambang 11,000,000 13,090,000 14,520,000 4 Hari 23-26 23-26 5-8
NQF 5 Tyre
Manajemen Perawatan Peralatan Tambang
91 11,000,000 13,090,000 14,520,000 4 Hari 19-22 6-9 10-13
NQF 5 Welding
92 Pengolahan Hasil Tambang NQF 4 16,500,000 20,157,500 22,660,000 7 Hari 8-14 12-19
93 Pengolahan Hasil Tambang NQF 5 18,700,000 23,925,000 27,500,000 10 Hari 22-31 4-13
Keselamatan dan Kesehatan Kerja
94 13,200,000 15,812,500 17,600,000 5 Hari 27-31 9-13
Tambang NQF 6

IV KATEGORI SISTEM MANAJEMEN


A BIDANG ISO SERIES
ISO 9001:2015 - Quality Management
95 4,400,000 5,967,500 7,040,000 3 Hari 7-9 20-22
System (Understanding and Implementing)
ISO 14001:2015 - Environmental
96 4,400,000 5,967,500 7,040,000 3 Hari 10-12 2-4
Management System (Understanding and
Implementing)
ISO 31000:2009 - Risk Management
97 4,400,000 5,967,500 7,040,000 3 Hari
(Understanding and Implementing)
ISO 45001:2018 - OHS Management
98 4,400,000 5,967,500 7,040,000 3 Hari 26-28 22-24 19-21
System (Preparing for Migration from
OHSAS 18001 to ISO 45001)

Note
*) Untuk In-House Training
1 Tempat Pelaksanaan Pelatihan di Graha BKI Lantai 9, Jl. Yos Sudarso No. 38 Tanjung Priok Jakarta
2 Sebelum pelaksanaan training, tanggal pada jadwal training ini dapat berubah sewaktu-waktu tanpa pemberitahuan sebelumnya
3 Biaya sudah termasuk PPN 10%
4 Biaya sudah termasuk training module (PDF Format), training kit, lunch, 2 x cofee break dan certificate
5 Untuk paket basic adalah non residential, professional adalah twin share residential dan business adalah single occupancy residential di Hotel Bintang****
6 Untuk paket professional dan business biaya termasuk antar jemput hotel ke dan dari Graha BKI termasuk breakfast dan dinner
7 Informasi lebih lanjut dapat menghubungi BKI Academy PT. Biro Klasifikasi Indonesia (Persero) Telp. 021 4393 7409, email : info@[Link]

You might also like