Figure B Framing: Pre-Assembled Dormer Wall Roof Framing (Install After Wall Sheathing) Wall Framing

This document provides framing details for constructing a dormer addition, including: 1) A framing sequence showing the order of wall, roof, and sheathing installation. 2) Diagrams of wall framing layout and dimensions for left/right walls and front/rear walls. 3) Diagrams showing the installation of wall sheathing on left/right walls and front/rear walls. 4) Diagrams illustrating rafter installation, soffit framing, and subfascia installation for the dormer roof.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
245 views13 pages

Figure B Framing: Pre-Assembled Dormer Wall Roof Framing (Install After Wall Sheathing) Wall Framing

This document provides framing details for constructing a dormer addition, including: 1) A framing sequence showing the order of wall, roof, and sheathing installation. 2) Diagrams of wall framing layout and dimensions for left/right walls and front/rear walls. 3) Diagrams showing the installation of wall sheathing on left/right walls and front/rear walls. 4) Diagrams illustrating rafter installation, soffit framing, and subfascia installation for the dormer roof.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Figure B

Framing

FR AMING SEQUENCE
Wall framing
Pre-assembled dormer wall
Roof framing (install after
wall sheathing)
Pre-assembled “ladder”
Dormer sheathing nailers
Cross-ties
Install after main roof sheathing
Figure C 2x6 x 18' 0" RIDGE.
ALL OTHER PIECES ARE 2x4s
Left & Right Wall Framing

RAFTER

A
EXTERIOR
12

SECTION A-A
9 4' 8-5/16"
A

1 1 16-1/4"

ORANGE
REAR PIECES FRONT
- LEFT WALL 48"
WALL WALL
ONLY

8' 1-1/8"

2x4 TREATED
BOTTOM 35-1/2"
PLATE

20-1/2" 24" O.C. 20-1/2"

11' 5"

12' 0"
Figure D
Front & Rear Wall Framing
NOTE: ALL BLUE PIECES - FRONT WALL ONLY ALIGN LIGHT
A BLUE STUDS
WITH WALL
STUDS BELOW.

19-1/2"
2' 5-9/16"

19-1/2"

A
DOUBLED
2x10s SECTION A-A
- ALL OTHER
PIECES
ARE 2x4s

8' 1-1/8"
ORANGE
6' 11-3/8"
PIECES
- REAR WALL
ONLY

2x4 TREATED 7' 7-1/2"


BOTTOM
PLATE

24" 24" O.C. 24" O.C. 24"

16' 0"
Figure E
Left & Right Wall Sheathing
NOTCH SHEATHING
AROUND RIDGE

1/2" OSB
SHEATHING
STRIPS
1-1/2" WIDE
OVER WALL
8' STUDS

4' 4' 4'

REAR WALL ALIGN BOTTOM EDGES


FRAMING (REF) OF WALL SHEATHING
WITH LOWER EDGE OF
BOTTOM PLATES.

NOTE: 1/2" OSB SHEATHING. MAKE CUT-OUTS


FOR WINDOWS AND ADD 1-1/2" STUD
STRIP IN LEFT WALL ONLY.
Figure F
Front & Rear Wall Sheathing

1/2" x 4-1/2"
OSB STRIPS

1/2" x 2-1/4"
8' OSB STRIPS

4'

ALIGN BOTTOM EDGES NOTE: 1/2" OSB SHEATHING. FRONT WALL SHEATHING SHOWN.
OF WALL SHEATHING FOR REAR WALL, USE FOUR 4'x8' PANELS.
WITH LOWER EDGE OF
BOTTOM PLATES.
Figure G 12
DORMER SIDEWALL
Rafters 4 NAILER (LEFT WALL
1 SHOWN; RIGHT WALL 1 3
Installation IS OPPOSITE)

1 3
INSTALL CENTER 7
REAR RAFTERS 6
OPPOSITE DORMER
RAFTERS.

ROOF
2 1/4"
SHEATHING
(REF.)

7
3/8" 4
SECTION A-A 2 BEVEL CORNER 5
SECTION B-B SECTION C-C
(TYPICAL ALL
SUBFSACIAS)

A B C C C

18' 0"

12' 1-1/2"

24" 24-3/4"
O.C.

A B C C C
2x4
SUBFASCIA

NOTE: ALL 2x4 CONSTRUCTION. FRONT OVERHANG LADDER (GREEN PIECES)


IS PRE-ASSEMBLED, THEN INSTALLED WITH TOP SURFACES OF SMALL
RAFTERS ( 4 5 ) FLUSH WITH TOP SURAFCES OF 1 RAFTERS.
Figure G1
Front Overhang Strap

SIMPSON
LSTA24
OR SIMILAR
Figure H 3A
Roofs & Dormer SOFFIT
NAILER
2x4
SUBFASCIA
Side Walls 1/2" OSB
SHEATHING 1/4"
Sheathing
1"
BEVEL CORNER

SOFFIT

1/2" OSB
SHEATHING
SECTION A-A

3A 1/2" OSB
SUBFASCIA SOFFIT SHEATHING

SOFFIT

2
SOFFIT
NAILER 2x4 x 14' 1"
12-1/2" SUBFASCIA 12-1/2"

1/2" OSB
SHEATHING
SIDE WALL

A
Figure J 1x6
PVC
Side Wall
SHINGLE
TRIM TRIM 1x6
PVC
Siding & Trim 1x4 TRIM
PVC
TRIM

SHINGLE
TRIM

1x2 1" x 7-1/4"


DRIP PVC TRIM
CAP

B B
2
SUBFASCIA
A (ref.)
TRIM
(CUT TO FIT) SOFFIT
(ref.)
1x2
STOP

1x6
PVC
TRIM
ALUMINUM
STORM 1x6
WINDOW PVC
B B TRIM 1x6
RIPPED
C C PVC
TO TRIM
1" x 3-1/2" 4-3/4"
SILL 1x4
PVC
TRIM

SECTION B-B
A (SECTION C-C
OPPOSITE)

1x6
SECTION A-A
PVC
TRIM

HOUSE
2x4 TREATED
WRAP
DOOR GUIDE
1x4 5/16"
PVC FIBER-CEMENT
TRIM SIDING NOTE: LEFT WALL SHOWN. FOR RIGHT WALL, OMIT WINDOWS
AND COVER SIDING JOINTS WITH 1x4 TRIM.
1x6 TRIM 1x6 TRIM
Figure K RIPPED 1x4 RIPPED 1x6 SHINGLE TRIM 1x6
TO 4-3/4" TRIM TO 4-1/2" FASCIA TRIM (CUT TO FIT) TRIM
Front Wall
Siding & Trim

1-1/2" x 2"
TRACK
MOUNT B

1x6 2-3/4" 1x4


PVC 1x6 TRIM
TRACK
TRIM RIPPED
COVER
TO 4-3/4"
VIEW A-A A A

1x6 DORMER FIBER-CEMENT


PVC 1x4 FLASHING SIDING
TRIM 1x4 TRACK B SHINGLE
TRIM COVER TRIM

1x2 ALUMINUM
STOP STORM 1x6
WINDOW FASCIA

1" x 3-1/2" 1x6


SILL PVC
APRON
TRIM
1x6 1-1/2" x 2"
PVC TRACK
TRIM MOUNT
1x4
TRACK
COVER
1x4
TRIM

BYPASS
DOOR
TRACK

DOOR
SECTION B-B 2x4 TREATED 1x4 SHOP-MADE DOORS NOTE: Shingles omitted from
DOOR GUIDE TRIM (SEE FIGURE M) main view for clarity.
Figure L 9' 4-3/4"
1-7/8"
Rafters & 53˚ 53˚
Cross-ties
Patterns RAFTER 1 (13 REQ’D) 20-3/8"

9' 4-3/4"

53˚ 53˚

OVERHANG RAFTER 2 (8 REQ’D - 4 USED AS SOFFIT NAILERS)

7' 2-3/4"
7/8" 71.5˚

71.5˚

DORMER RAFTER 3 (7 REQ’D)


10"

7' 1-1/8"

18.4˚ 71.5˚

OVERHANG RAFTER 3A (4 REQ’D - 2 USED AS SOFFIT NAILERS)

21-1/8" 19-1/4"

53˚ 53˚ 53˚ 53˚

RAFTER 4 (2 REQ’D) RAFTER 5 (5 REQ’D)

9' 3/8"

37˚ 18.4˚

CROSS-TIE 6 (3 REQ’D)

11' 10-1/2"

37˚
1-1/2"

CROSS-TIE 7 (3 REQ’D) 2"

NOTE: ALL 2x4 CONSTRUCTION.


Figure M
Shop-made Door 40-7/8"

1x2
PVC

17-3/4"

86"
78-7/8"

59"

10"

10"

10"

1x4 PVC
3/8" 1x4
CEMENT PVC
BOARD 1x6 PVC
(4 PERIMETER
BOARDS)
48"
Figure N
Sliding Door Bottom

DOOR

WASHERS

TREATED 2X4

ANGLE IRON

FENDER WASHER

5/16” LAG SCREW