Grand Hyatt Manila Query Schedule

This document is a query schedule for the Grand Hyatt Manila Gold Residences project. It contains 4 queries regarding amenities areas, lift lobbies, and the helipad that were submitted on December 31, 1999 and responses are required by March 12, 2018. The queries reference specific drawing numbers and request clarification or additional details regarding floor finishes and specifications.

Uploaded by

AlejandroGonzaga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views8 pages

Grand Hyatt Manila Query Schedule

This document is a query schedule for the Grand Hyatt Manila Gold Residences project. It contains 4 queries regarding amenities areas, lift lobbies, and the helipad that were submitted on December 31, 1999 and responses are required by March 12, 2018. The queries reference specific drawing numbers and request clarification or additional details regarding floor finishes and specifications.

Uploaded by

AlejandroGonzaga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Query Schedule

Schedule Issue Number: 1

GRAND HYATT MANILA GOLD RESIDENCES

Queries & Responses

Query Date of Date Response Drawing/Document


Item Discipline
No. Query Required Reference

1 31/12/99 12-Mar-18 12-Mar-18 A-1011 AMINITIES

A-1011, A-1012, & A-


2 31/12/99 12-Mar-18 12-Mar-18 LEVEL 8 TO 38
1013
3 31/12/99 12-Mar-18 12-Mar-18 A-1014 & A-1014 LEVEL 39 TO 48

4 31/12/99 12-Mar-18 12-Mar-18 A-1015


Discipline

SOME AREAS AT
AMENITIES

LIFT LOBBY
LIFT LOBBY

HELIPAD
M

Query Description

In the absence of floor tagging in some areas at [Link] provide detail and specifaction.

We have assumed that the highlighted area below has floor finish of TL-2. Please confirm.
We have assumed that the highlighted area below has floor finish of TL-2. Please confirm.

Please provide specification and deatil.


MARCH 12, 2018

Open /
Response
Closed