0% found this document useful (0 votes)
147 views3 pages

03 - Design Development Workflows

National Park Service - 03 - Design Development Workflows

Uploaded by

budok23
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
147 views3 pages

03 - Design Development Workflows

National Park Service - 03 - Design Development Workflows

Uploaded by

budok23
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

3/31/13 3.

0 Design Development (DBB) - DSC Workflows

National Park Service U.S. Department of the Interior

Find a Park Discover History Explore Nature Get Involved Working with Communities Teachers Kids About Us

DSC Workflows
Home

Supplemental Cultural
Resource Studies 3.0 Design Development (DBB)
Design
3.1 Prepare Design Development Documents
Design-Bid-Build
(DBB)
Based on the Final Schematic Design Documents, and the Response Memorandum to the DAB review
0.0 General
questions, prepare the following:
1.0 Predesign

2.0 Schematic Design Design Development Drawings


Division 1 Specifications
3.0 Design
Development
Divisions 2 through 49 Outline Specifications
Product File
4.0 Construction
Draft Statement of Structural Tests and Special Inspections (STSI)
Documents
Draft Profit Calculator
Design-Build (DB)
Templates:
Construction

Information Division 1 Specifications MF04


Macros must be enabled to edit specifications. Refer to instructions included in the Division 1
Specifications download.
Tools Statement of Structural Tests and Special Inspections (STSI)
Profit Calculator
FAQs

Contact Us Guidelines:
Site Index
Design Deliverables - Content and Format Requirements for Design Development Documents
CAD Standards
Guide for Writing Outline Specifications

3.2 Initiate Constructability Analysis

Initiate Constructability Analysis utilizing the Constructability Checklist template.

Template: Constructability Checklist

3.3 Draft Contract Price Schedule

Prepare a draft Contract Price Schedule utilizing the Contract Price Schedule template.

Template: Contract Price Schedule

Guideline: Guide for Specifiers, December 2010

3.4 Complete NPS Project Sustainability Checklist (Design Development Portion)


www.nps.gov/dscw/dbbdesdevelop.htm 1/3
3/31/13 3.0 Design Development (DBB) - DSC Workflows

Working collaboratively within the integrated design team, complete the Design Development portion of the
NPS Project Sustainability Checklist.

Templates:

NPS Project Sustainability Checklist (based on LEED™ version 2.2)


NPS Project Sustainability Checklist (based on LEED™ version 2009)

3.5 Update Class B Construction Cost Estimate

Update the Class B Construction Cost Estimate based on the completed Design Development documents;
confirm that project cost is within available funds.

Template:

Class B Construction Cost Estimate Template


Refer to the Class B Construction Cost Estimate Template Instructions.

Sample: Class B Construction Cost Estimate Sample (pdf)

Guidance: Cost Estimating Requirements Handbook (pdf)

3.6 Conduct Design Development Value Based Decision-Making

Conduct a Design Stage Value Analysis (DSVA) study to analyze the Design Development Documents to
improve project's performance, reliability, quality, and value.

Prepare the DSVA Report utilizing the Value Analysis (VA) Report template.

Templates:

VA Report
VA Templates

3.7 Design Development Deliverables

3.7.1 Submit Design Development Documents

Submit the following Design Development Documents for review:

Design Development Documents


Design Development Drawings
Division 1 Specifications
Divisions 2 through 49 Outline Specifications
Product File
Draft Statement of Structural Tests and Special Inspections (STSI)
Draft Profit Calculator
Draft Constructability Analysis
Draft Contract Price Schedule
NPS Project Sustainability Checklist
Updated Class B Construction Cost Estimate
Design Stage Value Analysis Report

3.7.2 Resolve Design Development Review Comments

Resolve all review comments. Submit written responses to review comments, utilizing the NPS review
form, within 15 calendar days of receipt of comments.

3.8 Compliance Deliverables

www.nps.gov/dscw/dbbdesdevelop.htm 2/3
3/31/13 3.0 Design Development (DBB) - DSC Workflows

3.8.1 Compliance Drawings and Supporting Narrative

3.8.1.1 When required, prepare and submit drawings and supporting narrative for SHPO/THPO
review and other compliance activities, as required. Incorporate resolution of SHPO/THPO review
comments into Draft Design Development Documents, as required.

3.8.1.2 When required, prepare and submit drawings and supporting narrative for obtaining
Section 404, National Pollutant Discharge Elimination System (NPDES), and other permits as
required.
Resolve reviewing agencies comments, as required.

3.8.2 Submit FONSI or ROD

When required, submit FONSI or ROD.

Back to Top

Frequently Asked Questions Facebook YouTube

Website Policies Twitter iTunes

Contact Us Last Updated: 03/25/2013

www.nps.gov/dscw/dbbdesdevelop.htm 3/3

You might also like