We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
~
Printed Pages: 01 Sub Code :Nv 038
Paper ID 100707 Roll No. i
B. TECH.
(SEM VI) THEORY EXAMINATION 2018-19
ENGINEERING HYDROLOGY
Time: 3 Hours Total Marks: 100
Note: 1. Attempt all Sections. If require any missing data; then choose suitably.
2
SECTION A
Attempt ail questions in brief. 2x10=20
Discuss Depression storage.
What are methods to assess the recharge of ground water in an area?
Discuss flood frequency analysis
Write short note on Global Water Budget.
Define synthetic unit hydrograph
What is a “Return Peric
Define Probable Moium Precipitation.
What is transmissibility?
Why is base flow separated from total runos??
Define Recurrence interval of flood
Gore as ae ge
10x3=30
a State the Horton’s equation for infiltration capacity curve and skéfch’with the
salient components ofthe curve. And explain briefly about th 'g-index and w-
index.
b. The following aié the ordinates for @ flood Sydrograph “Tesulting from an
isolated soap pt hours duration.
Time (hr) 2] [a] el wT a) | 8
Ordinates of | 5 7 15 | 40 | 80 | 6o-fs50 | 25 | 15 | 5
Attempt any three of the follo
Hydrograph
Determine the ordinates of 1 cm- 6 hous ‘unit irhyarogragh if the catchment area
is 450 Kn
cist the various direct methods of measurement of consumptive use of water
d. How will you derive the synthetic unit hydrograph from a number of unit
hydrograph? Illustrate [Link] with suitable example in a tabular form.
¢. Derive an expression for discharge from a well in unconfined aquifer. The well
fully penetrates it
SECTION C
Attempt any one part of the following: 10x 1=10
(a) Explain the concept of S-hydrograph and under what circumstances you would
adoption of this hydrograph, Give a clear associated sketch.
(b) What do you mean by probable maximum precipitation (PMP) over the basin?
Explain how PMP is estimated
1]PegeAttempt any one part of the following: 10x1=10
(a) Define Unit Hydrograph, Explain its assumption and uses. A 12-tr. UH of a
catchment is triangular in the shape with a base width of 144 br and peak
discharge of 23 m?/s. Calculate the area of the catchment.
(b) Briefly distinguish between :
i) Actual and Potential evapotranspiration
(i) Field Capacity and permanent wilting point
(ii) Depression storage and interception
{iv) Infiltration capacity and infiltration rate,
Attempt any one part of the following: 10x1=10
(2) The ordinates of a 4 hr unit hydrograph of a basin of area 300 km? measured at
| hr intervals are 6, 36, 66.91, 106, 93.79, 68, $8.49, 41, 34, 27, 23, 17, 13, 9, 6.
3 and 1.5 m'/s respecbvely. Determine the ordinates of a 3 hr Unit hydrograph
for the basin.
(b) Unit hydrograph ordinates of 4 hour are given below Find out ordinates of 8
hour unit fy ogra
Time(hr) 4 20 [24 | 28 | 32 | 36
UO. 7 17 60 {47 | 32-[ 15 | o
an”
Attempt any one part of the follwing: lox FH10
{a) Describe the various sarbtucal methods adopted for control af fddds. Also
discuss the Problem ob: floods and their control with special fetence to the
Indian scene
(>) The peak values-@f the floods from the year 1941 to 1955 are - 4000, 5400, 7000,
4600, 381 0 4900, 7800, 6400, 5300. 4700, (5200, 10000 and 5200
cumecs. Estimate the magnitude of flood having fréqiency equal to (i) 100
years, (ii) 300 years. The Ya = 0.5128 and Sn=1.0206.°
Attempt any one part of the following: we 10x1=10
(a) Write short notes on following: .
(i) Specific capacity of well.
(ii) Well loss “
(iii) Spherical flow in well
(b) A 25 cm diameter well penetrates 20m below water table. After | day pumping
at arate of 4600 litre/minutes. The water level in attest well at 110m is lowered
by 0.7m and test, well at 40 m away drawdown is 1.25 m. What is the
transmissibility of aquifer?
21 Page