The document provides information on building services for the Cultural Intervention Center at Balgandharva Natya Madir in Pune. It identifies several key services including ventilation, air conditioning, heating, mechanical ventilation, lighting, electrical, acoustics, sound insulation, noise control, fire protection, water supply, and lifts. It also provides a case study of the services and facilities at the NESCO Exhibition Center in Goregaon, Mumbai including details on its eight entry/exits, six exhibition halls, administrative areas, food court, parking lots, and mechanical and electrical systems.

Uploaded by

Apurva Korde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
180 views8 pages

Identification of Services

The document provides information on building services for the Cultural Intervention Center at Balgandharva Natya Madir in Pune. It identifies several key services including ventilation, air conditioning, heating, mechanical ventilation, lighting, electrical, acoustics, sound insulation, noise control, fire protection, water supply, and lifts. It also provides a case study of the services and facilities at the NESCO Exhibition Center in Goregaon, Mumbai including details on its eight entry/exits, six exhibition halls, administrative areas, food court, parking lots, and mechanical and electrical systems.

Uploaded by

Apurva Korde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

CULTURAL INTERVENTION CENTER

AT BALGANDHARVA NATYA MADIR, PUNE


BUILDING SERVICES
IDENTICATION OF SERVICES AND CASE STUDY REPORT

APURVA KORDE | 1529

SEMESTER IX

SIR J.J. COA


APURVA KORDE | 1529

IDENTIFICATION OF SERVICES :

1. VENTILATION
 Methods of ventilation
 Natural Ventilation
 Mechanical Ventilation
 Energy conservation in Ventilation System

2. AIR CONDITIONING, HEATING AND MECHANICAL VENTILATION


- OUTDOOR INDOOR DESIGN CONSIDERATIONS
- PLANNING
 Room for air conditioning plant
 Room for air handling units and package units
 Supply and return air ducts
 Cooling tower

- TYPES OF SYSTEMS IN AIR CONDITIONING AND THEIR AREA REQUIREMENTS


 Split
 Package
 Centralised

- FACTORS TAKEN INTO CONSIDERATION FOR DIFFERENT APPLICATION IN DIFFERENT


SPACES
- UNGERGROUOND/ BASEMENT CAR PARK VENTILATION
- VENTILATION OF NON AIR CONDITIONED AREAS
- HVAC SYSTEMS
 Split air conditioners
 VRF systems
 Mechanical ventilation system
 Building automation system for hvac control monitoring and ventilation

3. LIGHTING
- Use of daylight
- Orientation of the building
- Use of artificial lighting
- Lighting required in different spaces as per the function
- Different light systems that can be incorporated
- Energy conservation in lighting

4. ELECTRICAL
- PLANNING OF ELECTRICAL INSTALLATIONS
 Substations and switch rooms
 Location and requirements of distribution panels
 Overhead lines, wires and cables
 Map of underground networks
 System for power backup

- USAGE IN CAR PARK FOR ELECTRICAL VEHICULAR CHARGE


- USE OF ALTERNATIVE RESOURCES FOR GENERATIONS OF ELECTRICITY
- BUILDING MANAGEMENT SYSTEM
- SECURITY SYSTEM

5. ACCOUSTICS, SOUND INSULATIONAND NOISE CONTROL


- PLANNING AND DESIGN AGAINST OUTDOOR NOISE
 Use of green belts and landscaping
 Highway noise landscaping
- PLANNING AND DESIGN AGAINST INDOOR NOISE
 Identification of zones which produce a lot of noise
 Internal planning measures
- SOUND PROOFING/ NON PROOFING

6. FIRE PROTECTION REQUIREMENTS


- TAKING INTO CONSIDERATION BUILDING HEIGHT AND PROVIDING ADEQUATE MEASURE
OF FIRE SAFETY
- PODIUM PROPOSAL OR NO
- CONSTRUCTION MATERIALS
- EXITS
 Types of exits
 General requirements taken into consideration
- FIRE ALARM DEVICES
- ESCAPE ROUTES
- NUMBER AND WIDTH OF ESCAPE ROUTES
- REQUIREMENTYS OF EXITS
- FIRE ESCAPE BALCONIES
- REFUGE AREA
- RAMPS

7. WATER SUPPLY
- UNDERGROUND TANK
- OVER HEAD TANK
- FIRE TANK
- PUMP ROOMS
8. LIFTS
- LIFT LOBBYS
- LIFT MACHINE ROOMS AND PITS
- CAPACITY AND LOADING
CASESTUDY

NESCO EXHIBITION CENTER, GOREGAON


LOCATION:
Bombay Exhibition Centre, NESCO, Goregaon, Mumbai, Maharashtra 400063

EARLIER AN INDUSTRIAL AREA NOW CONVERTED INTO ECHIBITION CENTER

THE SITE INCLUDES

- 8 ENTRY EXITS
 GATE 1A, TO PARKING LOT
 GATE 1, MAIN ENTRY AND EXIT
 GATE 2, MAIN ENTRY EXIT
 GATE 3, COMMERCIAL OFFICES ENTRY AND EXIT
 GATE 4, LOADING UNLOADING ENTRY AND EXIT
 GATE 5, LOADING UNLOADING ENTRY AND EXIT
 GATE 6, STAFF ENTRY
 GATE 7, EXIT FROM THE PARKING LOT FOR SERVICE TRUCKS

- 6 EXHIBITION HALLS OF DIFFERENT CAPACITY


 HALL 1, 19143 SQ.M
o 7 entry/exits
o Four toilet areas (both men and women)
 T1, T2, T3, T4
o 18 to 21m span x 9 rows
o 21m ht

 HALL 2, 7378 SQ.M


o Formarly hall 5
o Adjoined to hall 3
o 5 entry/exits
o One toilet
 T6
o 15m span
o 21m ht

 HALL 3, 11799 SQ.M


o Formally hall 6
o Adjoined to hall 2
o 3 independent entry/ exits
o 3 entrys from hall 2
o 21m span
o 21m ht
o Three toilets
 T9,t10,t11

 HALL 4, 10800 SQ.M


o Formally hall 7a
o Three entry/ exits
o 18m span
o 21M HT
o 1 toilet
 T

 HALL 5, 4864 SQ.M


o Formally hall 7
o One entry/ exit
o No existing toilets, 2 proposed
o 12m span
o 21M HT

 HALL 8, 11880 SQ.M


o New proposed hall
o 6 propsed entry exits
o 4 proposed toilets
o 21m span
o 21M HT

- 3 IT BUILDINGS
 IT BUILDING NO 4
o Under construction
o 3 entry exits
o 3rd entry connected to loading unloading
o G+15
o Admin for construction management

 IT BUILDING NO 3
o Main IT building with entire administration of the exhibition center
o G+12
o G+4 podium
o 4 restricted entry/exits

 IT BUILDING NO 2
o Underconstruction
o 4 propsed entrys/ exits
o G+9
o Management administaration

- ADMIN AREA
 Above hall one is the admin area
 G+2
 One unrestricted entry

- ROOT
 IT core for meetings
 G +0
 Restricted entry

- FOOD COURT
 Open cafeteria
 6 food stalls for time being
 Indoor and outdoor seating area

- FOUR PARKING LOTS OF DIFFERENT CAPACITY


 PARKING GROUND 1
o 18500 SQ.MT
o 750 CARS
o ENTRY AND EXITS FROM GATE 1,1A AND GATE 7

 PARKING GROUND 2
o 4010 SQ.MT
o 150 CARS
o ENTRY AND EXITS AFROM GATE 1. 1A AND GATE7

 PARKING GROUND 3
o 7267 SQ.MT
o 300 CARS
o COSEST ENTRY EXIT FROM GATE 2

 PARKING GROUND 4
o 9000 SQ.MT
o 300 CARS
o ENTRY AND EXITS AFROM GATE 1 AND 1A
o PICKUP AND DROP OFF POINT FOR AUTO RIKSHAWS, OLA AND UBER

- A LUXURY HALL
 THE GRANDE
o Formally HALL 2
o 2188 sqmt
o G+2
o 5 restricted entry and exits
o Two proposed toilets

- HALL 4, 10800 SQ.M


 FORMALLY KNOWN AS HALL 7
o THREE ENTRY EXITS
o ONE STAFF ENTRY FROM GATE 6 AND 7
o 3 ROWS 12 COLUMS OF TRUSSES (C/C 10M) WITH 18M SPAN
o 21M HT
o 1 TOILET

 HVAC SYSTEM
o 4 CHILLARS OF 900LTS CAPACITY, LOCATED AT THE BACK OF THE HALL
 2 IN USE, 2 ON STANDBY
o COOLING TOWER TO SIDE ENTRY
 Water is cooled down to 4 degree temperature
 2100tr per tower
 24kv ht supply
 Two line distribution
o 36 AHUS
 On a span of 3m on the mezzanine floor level created on the
exterior wall on 8m ht
 21k CFM AHU
 Blower and motor installed
 Duct size starting from 1mx0.6m when starting from the AHU
and reducing to 0.45x 0.45m at the end
 Fire rated ducting system of gi sheeting
 Two restricted entry exits to the mezzanine floor
 Monthly maintenance check
 15 to 30 air changes per hour in its working state

o NO MAINTANCE OF THERMOSTAT REMOTE DIFFERENCE


o POWER SAVING MODE IN GIVEN EXHIBITION CHOICES
o 2 AUTOMATED VALVE ACCORDING TO TEMPERATURE CHANGE
o OZONISER AND HUMIDIFIER FIT IN THE AHU DUCTS TO AVOID ANY
ACCUMULATED FOUL SMELL
o CFD ANALYSIED
o BTU METER IS IMPLIED (BRITISH THERMAL UNIT METER)
o UPS APPLIED WHEN THE HALL IN USE (UNINTERUPPED POWER SUPPLY)
- ELECTRICAL
 2 transformers provided
 35 electrical panels provided for hvac, lighting, internal stall arrangements
 Hydroneumatic system usage of power being used for water supply
 All electrical charges are provided by the NESCO marketing team
 Total of 36 distribution panels in the hall and 2 per every toilet is provided
 12 distribution panels for the mezzanine floor
 Three meter rooms provided at the back of the hall.

- FIREFIGHTING
 SPRINKLER SYSTEM ACROSS THE ROOF OF THE HALL
 HOSE RAIL AT 2M OFFSET FROM THE EXTERNAL WALL
 54K LTS CAPACITY FIRE TANK IMPLEMENTED FOR THE ENTIRE HALLS
 FIRE PIPES OF DIA 40MM DIA RUNNING ACROSS FOR HOSE RAIL PURPOSES
 FIRE EXTINGUISHGERS PROVIDED AT EVERY 6M
 NO FIRE EXIT INDICATED