0% found this document useful (0 votes)
215 views5 pages

NTPC Anta 135MWp PV System Simulation

This document summarizes the simulation parameters for a 135MWp grid-connected solar photovoltaic system in Anta, India. Key parameters include: - The system consists of two sub-arrays totaling 135,004kWp of photovoltaic modules tilted at 21 degrees. - Meteorological data is from Meteonorm 7.2 for the period of 2001-2010. - The system losses account for soiling, wiring, mismatching, light induced degradation, and iron losses from transformers. - The system has 29 inverters totaling 90,000kWac to convert the solar energy for connection to the grid.

Uploaded by

Vamsi Manoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
215 views5 pages

NTPC Anta 135MWp PV System Simulation

This document summarizes the simulation parameters for a 135MWp grid-connected solar photovoltaic system in Anta, India. Key parameters include: - The system consists of two sub-arrays totaling 135,004kWp of photovoltaic modules tilted at 21 degrees. - Meteorological data is from Meteonorm 7.2 for the period of 2001-2010. - The system losses account for soiling, wiring, mismatching, light induced degradation, and iron losses from transformers. - The system has 29 inverters totaling 90,000kWac to convert the solar energy for connection to the grid.

Uploaded by

Vamsi Manoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PVSYST V6.

84 19/11/19 Page 1/5

Grid-Connected System: Simulation parameters


Project : NTPC ANtA 135MWp
Geographical Site Anta Country India
Situation Latitude 25.16° N Longitude 76.29° E
Time defined as Legal Time Time zone UT+5.5 Altitude 0 m
Albedo 0.20
Meteo data: Anta Meteonorm 7.2 (2001-2010), Sat=100% - Synthetic

PVsyst TRIAL
Simulation variant :

Simulation parameters
Collector Plane Orientation
final
Simulation date

System type
Tilt
19/11/19 18h21

Unlimited sheds
21° Azimuth 0°
Sheds configuration Nb. of sheds 200 Unlimited sheds
Sheds spacing 7.50 m Collector width 3.92 m
Inactive band Top 0.02 m Bottom 0.02 m
Shading limit angle Limit profile angle 20.3° Ground cov. Ratio (GCR) 52.3 %
Shadings electrical effect Cell size 15.6 cm Strings in width 1

PVsyst TRIAL
Models used Transposition Perez Diffuse Perez, Meteonorm
Horizon Free Horizon
Near Shadings Mutual shadings of sheds Electrical effect
User's needs : Unlimited load (grid)

PV Arrays Characteristics (2 kinds of array defined)


PV module Si-poly Model FOR BOS.72.330.05 (5 wp)
Custom parameters definition Manufacturer NTPC Ltd Provided
Sub-array "Sub-array #2"
Number of PV modules In series 29 modules In parallel 392 strings
Total number of PV modules Nb. modules 11368 Unit Nom. Power 330 Wp
Array global power Nominal (STC) 3751 kWp At operating cond. 3400 kWp (50°C)

PVsyst TRIAL
Array operating characteristics (50°C) U mpp 989 V I mpp 3437 A
Sub-array "Sub-array #1"
Number of PV modules In series 29 modules In parallel 13715 strings
Total number of PV modules Nb. modules 397735 Unit Nom. Power 330 Wp
Array global power Nominal (STC) 131253 kWp At operating cond. 118946 kWp (50°C)
Array operating characteristics (50°C) U mpp 989 V I mpp 120262 A
Total Arrays global power Nominal (STC) 135004 kWp Total 409103 modules
Module area 793804 m² Cell area 716945 m²

Sub-array "Sub-array #2" : Inverter Model EP-2500-HA-UD


Custom parameters definition Manufacturer Sineng Electric Co.,ltd
Characteristics Operating Voltage 900-1300 V Unit Nom. Power 2500 kWac
Max. power (=>25°C) 2875 kWac

PVsyst TRIAL
Inverter pack Nb. of inverters 1 units Total Power 2500 kWac
Pnom ratio 1.50
Sub-array "Sub-array #1" : Inverter Model SG3125HV
Custom parameters definition Manufacturer Sungrow
Characteristics Operating Voltage 875-1300 V Unit Nom. Power 3125 kWac
Max. power (=>25°C) 3594 kWac
Inverter pack Nb. of inverters 28 units Total Power 87500 kWac
Pnom ratio 1.50

PVsyst Evaluation mode


PVSYST V6.84 19/11/19 Page 2/5

Grid-Connected System: Simulation parameters


Total Nb. of inverters 29 Total Power 90000 kWac

PV Array loss factors


Array Soiling Losses Loss Fraction 3.0 %
Thermal Loss factor Uc (const) 29.0 W/m²K Uv (wind) 0.0 W/m²K / m/s
Wiring Ohmic Loss Array#1 4.8 mOhm Loss Fraction 1.5 % at STC
Array#2 0.14 mOhm Loss Fraction 1.5 % at STC

PVsyst TRIAL
LID - Light Induced Degradation
Module Quality Loss
Module Mismatch Losses
Strings Mismatch loss
Incidence effect (IAM): User defined profile
Global Loss
Loss
Loss
Loss
Loss
Fraction
Fraction
Fraction
Fraction
Fraction
1.5 % at STC
2.0 %
0.0 %
1.5 % at MPP
0.10 %

10° 20° 30° 40° 50° 60° 70° 80° 90°


1.000 1.000 1.000 1.000 1.000 1.000 0.930 0.730 0.000

System loss factors


Array#1 : AC wire loss inverter to transfo Inverter voltage 630 Vac tri
Wires 142 m 3x2500 mm² Loss Fraction 1.0 % at STC
Array#1 : External transformer Iron loss (24H connexion) 133500 W Loss Fraction 3.6 % at STC

PVsyst TRIAL
Unavailability of the system

Auxiliaries loss
Resistive/Inductive losses
Array#2 : External transformer Iron loss (24H connexion)
Resistive/Inductive losses
3.6 days, 3 periods

Proportionnal to Power
0.616 mOhm
0W
0.000 mOhm

6.0 W/kW
Loss
Loss
Loss
Fraction
Fraction
Fraction
Time fraction

... from Power thresh.


0.6
0.0
0.0
1.0 %

0.0 kW
%
%
%
at
at
at
STC
STC
STC

PVsyst TRIAL

PVsyst TRIAL
PVsyst Evaluation mode
PVSYST V6.84 19/11/19 Page 3/5

Grid-Connected System: Main results


Project : NTPC ANtA 135MWp
Simulation variant : final
Main system parameters System type Unlimited sheds
PV Field Orientation Sheds disposition, tilt 21° azimuth 0°
PV modules Model FOR BOS.72.330.05 (5 wp) Pnom 330 Wp
PV Array Nb. of modules 409103 Pnom total 135004 kWp
Inverter Model EP-2500-HA-UD Pnom 2500 kW ac

PVsyst TRIAL
Inverter Model SG3125HV Pnom 3125 kW ac
Inverter pack Nb. of units 29.0 Pnom total 90000 kW ac
User's needs Unlimited load (grid)

Main simulation results


System Production Produced Energy 224169 MWh/year Specific prod. 1660 kWh/kWp/year
Performance Ratio PR 78.71 %

Normalized productions (per installed kWp): Nominal power 135004 kWp Performance Ratio PR

8 1.0
Lc : Collection Loss (PV-array losses) 1.07 kWh/kWp/day PR : Performance Ratio (Yf / Yr) : 0.787
0.9
7 Ls : System Loss (inverter, ...) 0.16 kWh/kWp/day
Yf : Produced useful energy (inverter output) 4.55 kWh/kWp/day
0.8
[kWh/kWp/day]

PVsyst TRIAL
0.7
Performance Ratio PR

5
0.6
Energy

4 0.5

0.4
3
Normalized

0.3
2
0.2

1
0.1

0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

final

PVsyst TRIAL
Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh
January 119.1 43.32 16.83 153.2 145.2 17737 17277 0.835
February 145.6 40.26 20.32 178.9 169.8 20146 19647 0.814
March 192.5 55.94 26.14 215.5 203.9 23384 22814 0.784
April 207.0 69.22 31.12 212.2 200.2 22561 22015 0.768
May 215.4 91.45 34.86 206.3 193.1 21838 21314 0.765
June 174.9 98.90 32.27 163.9 152.7 17694 16360 0.739
July 152.7 97.97 28.89 144.3 133.9 15896 15486 0.795
August 148.0 95.48 27.56 145.6 135.3 16103 15689 0.798
September 168.6 71.06 27.91 180.4 169.6 19696 19210 0.789
October 159.2 58.20 26.74 186.0 175.7 20451 19943 0.794

PVsyst TRIAL November


December
Year

Legends: GlobHor
DiffHor
126.7
120.4
1929.9
43.59
38.37
803.75

Horizontal global irradiation


Horizontal diffuse irradiation
21.97
18.32
26.10
161.8
161.3
2109.5
153.1
153.1
1985.4

GlobEff
EArray
18197
18593
232297
17085
17329
224169
0.782
0.796
0.787

Effective Global, corr. for IAM and shadings


Effective energy at the output of the array
T_Amb T amb. E_Grid Energy injected into grid
GlobInc Global incident in coll. plane PR Performance Ratio

PVsyst Evaluation mode


PVSYST V6.84 19/11/19 Page 4/5

Grid-Connected System: Special graphs


Project : NTPC ANtA 135MWp
Simulation variant : final
Main system parameters System type Unlimited sheds
PV Field Orientation Sheds disposition, tilt 21° azimuth 0°
PV modules Model FOR BOS.72.330.05 (5 wp) Pnom 330 Wp
PV Array Nb. of modules 409103 Pnom total 135004 kWp
Inverter Model EP-2500-HA-UD Pnom 2500 kW ac

PVsyst TRIAL
Inverter Model SG3125HV Pnom 3125 kW ac
Inverter pack Nb. of units 29.0 Pnom total 90000 kW ac
User's needs Unlimited load (grid)

Daily Input/Output diagram

1000000
Values from 01/01 to 31/12
800000
[kWh/day]

600000
grid

PVsyst TRIAL
into

400000
injected

200000
Energy

-200000
0 1 2 3 4 5 6 7 8
Global incident in coll. plane [kWh/m².day]

PVsyst TRIAL 8000000

7000000
System Output Power Distribution

Values from 01/01 to 31/12


Bin]

6000000
/
[kWh

5000000
grid

4000000
into
injected

PVsyst TRIAL
3000000
Energy

2000000

1000000

0
0 20000 40000 60000 80000 100000
Power injected into grid [kW]

PVsyst Evaluation mode


PVSYST V6.84 19/11/19 Page 5/5

Grid-Connected System: Loss diagram


Project : NTPC ANtA 135MWp
Simulation variant : final
Main system parameters System type Unlimited sheds
PV Field Orientation Sheds disposition, tilt 21° azimuth 0°
PV modules Model FOR BOS.72.330.05 (5 wp) Pnom 330 Wp
PV Array Nb. of modules 409103 Pnom total 135004 kWp
Inverter Model EP-2500-HA-UD Pnom 2500 kW ac

PVsyst TRIAL
Inverter Model SG3125HV Pnom 3125 kW ac
Inverter pack Nb. of units 29.0 Pnom total 90000 kW ac
User's needs Unlimited load (grid)

Loss diagram over the whole year

1930 kWh/m² Horizontal global irradiation


+9.3% Global incident in coll. plane

-0.04% Global incident below threshold


-1.94% Near Shadings: irradiance loss

PVsyst TRIAL
-1.05% IAM factor on global
-3.00% Soiling loss factor

1985 kWh/m² * 793804 m² coll. Effective irradiation on collectors


efficiency at STC = 17.04% PV conversion

268506 MWh Array nominal energy (at STC effic.)


-0.39% PV loss due to irradiance level

-8.51% PV loss due to temperature

-0.06% Shadings: Electrical Loss , sheds1 strings in width


-2.00% LID - Light induced degradation
-1.60% Mismatch loss, modules and strings
-1.06% Ohmic wiring loss
233310 MWh Array virtual energy at MPP

PVsyst TRIAL -1.32%


-0.44%
0.00%
0.00%
0.00%
0.00%
Inverter Loss during operation (efficiency)
Inverter Loss over nominal inv. power
Inverter Loss due to max. input current
Inverter Loss over nominal inv. voltage
Inverter Loss due to power threshold
Inverter Loss due to voltage threshold
-0.04% Night consumption
229106 MWh Available Energy at Inverter Output

-0.59% Auxiliaries (fans, other)


-1.04% System unavailability
-0.02% AC ohmic loss
-0.53% External transfo loss

PVsyst TRIAL
224169 MWh Energy injected into grid

PVsyst Evaluation mode

You might also like