0% found this document useful (0 votes)
821 views30 pages

Model Answer Summer 2016

1) The document provides guidance for examiners on how to evaluate answers from candidates for an examination. It suggests examiners focus on the understanding demonstrated rather than exact word-for-word matches, and to give partial credit for steps in numerical problems. 2) The guidance also states that examiners should not penalize candidates for language errors except for subjects related to language. Examiners are also advised to give credit for equivalent concepts and figures even if they vary from the model answers. 3) The document aims to help examiners evaluate the candidates' comprehension level rather than just whether their answers exactly match model answers, in order to fairly and accurately assess each candidate's knowledge.

Uploaded by

haider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
821 views30 pages

Model Answer Summer 2016

1) The document provides guidance for examiners on how to evaluate answers from candidates for an examination. It suggests examiners focus on the understanding demonstrated rather than exact word-for-word matches, and to give partial credit for steps in numerical problems. 2) The guidance also states that examiners should not penalize candidates for language errors except for subjects related to language. Examiners are also advised to give credit for equivalent concepts and figures even if they vary from the model answers. 3) The document aims to help examiners evaluate the candidates' comprehension level rather than just whether their answers exactly match model answers, in order to fairly and accurately assess each candidate's knowledge.

Uploaded by

haider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 30

MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD

(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 1 of 30

Important suggestions to examiners:


1) The answers should be examined by key words and not as word-to-word as given in the model
answer scheme.
2) The model answer and the answer written by candidate may vary but the examiner may try to
assess the understanding level of the candidate.
3) The language errors such as grammatical, spelling errors should not be given more importance.
(Not applicable for subject English and communication skills)
4) While assessing figures, examiner may give credit for principle components indicated in a figure.
The figures drawn by candidate and model answer may vary. The examiner may give credit for any
equivalent figure drawn.
5) Credits may be given step wise for numerical problems. In some cases, the assumed constant
values may vary and there may be some difference in the candidate’s answers and model answer.
6) In case some questions credit may be given by judgment on part of examiner of relevant answer
based on candidate understands.
7) For programming language papers, credit may be given to any other program based on equivalent
concept.

Q.1 Attempt any TEN of the following 20 Marks


a) Give classification of Electrical Installation with suitable examples of each
Ans:
Types of Electrical Installation: ( 2 Marks)
i) Internal Electrical Installation : ( for example: Any Indoor Installation)
ii) External Electrical Installation: (for example: Any Outdoor Installation)
OR
For example application oriented:
a) Residential Electrical Installation : e.g. Domestic, home wiring
b) Commercial Electrical Installation: e.g College, Mall, Hospital
c) Industrial Electrical Installation : Small scale industry

b) Draw symbols for lamp exhaust fan, Light socket and bell
Ans: i) Lamp ii) Exhaust Fan iii) Light Socket iv) Bell

( Each Symbols: 1/2Mark)


MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 2 of 30

c) Draw Wiring diagram for 1 lamp and 1 fan


Ans: Wiring diagram for 1 lamp and 1 fan ( 2 Marks)

d) Define service connection with neat diagram


Ans: Service Connection:- ( 1 Marks)
It is the input conductor or wire which is carried out from supply company
(authorities) pole to consumers’ main board or premises.
Diagram: ( 1 Marks)

OR

e) State general rule for deciding no. of sub circuit for lighting and power circuit.
Ans: General rule for deciding no. of sub circuit for lighting and power circuit:
Lighting Circuit :- (1 Mark)
 Each sub circuit should not have more than a total 10 points (including lights, fans
and 5A socket outlet)
 Each sub circuit should not exceed 800 watts.
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 3 of 30

 Make the no. of lighting sub circuit for lighting load.


Total Electrical lighting load
No. of Lighting Sub circuits  OR
800 W
Total No. of lighting po int
No. of Lighting Sub circuits 
10
Power Circuit :- (1 Mark)

 For power load there should be maximum 3000W for 2 to 3 points.


 For power load there should be maximum 2000W for 1 to 2 points. (old rule)
 Make the no. of power sub circuits for power load.
Total electrical power load
No. of power Sub circuits 
2000 W or 3000 W
OR
Total No.of power po int s
No. of power Sub circuits 
2000 W or 3000 W

f) List out various wiring accessories for conduit wiring.


Ans: Following List various wiring accessories for conduit wiring :
( Any four accessories required: 1/2 Mark each)
1) Elbow : To move the direction of the conductor path as per wiring installation

2) Lock nut: To hold and seal the conduit with their wires

3) Conduit box: To hold and inspect incoming and outgoing terminals

4) Inspection box: To inspect the path of wiring.


5) PVC accessories: like 1-Way to 4 Way junction box, Bend, ‘T’
6) Lamp holder: It is the holding accessory. The different types of holders used such as
angle holder, batten holder, pendent holder
7) Ceiling Rose: Ceiling rose are of two types: i) Two plate ii) Three Plate and it is used
to give supply for ceiling fan and tubes.
8) Tube holder- It is used to hold the tube
9) Switch: the function of switch is to make ON/OFF. Switches are available in the
rating of 6A and 16A
10) Plug: Two pin plugs, three pin plugs and 5 in one plug. 16A Power plate.
11) MCB: It is safety device available in 6A to 32A, 40 to 60A and Single pole to Four
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 4 of 30

pole MCB
12) Kit Kat Fuse: It is a safety device available in 6A to 32 A
13) Saddles, screws, rawal plug, etc
14) Switch board, ICDP Main Switch
15) All types of size of VIR & PVC wire

g) State the use of busbar, MCB, ELCB and DB


Ans: i) Use of Bus-bar: - Distribute the load on 3-phase four wire systems. (1/2 Mark)
 To provide number of connection of incoming line to provide easy way to connect
number of sub circuit.
 For better firm connection.
 To provide easy access during inspection & maintenance.
 To avoid unauthorized changes or connection
ii) Use of MCB: - (1/2 Mark)
 Function of MCB use to trip the circuit when there is over load and short circuit fault.
 At normal condition it act as a switch.
iii) Use of ELCB: - (1/2 Mark)
 An Earth Leakage Circuit Breaker (ELCB) is a device used to directly to detect earth
fault current from an installation and cut off the circuit from power supply and avoid
electrical shock to the person..
iii) Use of DB: - (1/2 Mark)

 To distribute the lighting load and power load

h) Differentiate between wire and cable


Ans: (Any Two Points expected: 1 Mark each)
S.No Wire Cable
i) It is generally single core It may be single core, Two core, 2.5
core, 3 core, 3.5 core and 4 core
ii) Wires are used for LT Supply Cables are used for LT and HT
supply
iii) Current & Voltage capacity for Current & Voltage capacity for cable
wire is less is More
iv) Cost of wire is less. Cost of cable is more.
v) There are following types of wires: There are following types of cables:
VIR, PVC, TRS/CTS/flexible etc armored and unarmored.
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 5 of 30

i) Draw a neat diagram for busbar chamber


Ans: Diagram showing the arrangement of busbar Chember: (2 Marks)

or equivalent figure

j) Draw a single line diagram for motor wiring circuit


Ans: Single line diagram for motor wiring circuit: (2 Mark)

or equivalent figure

OR
(Diagram: 2 Mark)
3-ph,4 wire 400v A.C. supply
Energy meter

S Main Fuse

ICTP

Star-delta starter

3 Ø Squirrel cage Induction motor


IM
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 6 of 30

k) State the material and size of earth wire used for industrial installation
Ans: The material used and size of earth wire used for industrial installation: (2 Mark)

1. 8 SWG Copper Wire

2. 6 SWG GI Wire or Copper wire

3. If the total connected load more than 20 HP then Copper strips can be used as a earth
wire

l) List out various types of tenders


Ans: Types of Tender: ( Any Two expected: 2 Marks each)
1. Negotiated Tender
2. Limited competition or selective Tenders
3. Open competition ender

Q.2 Attempt any Four of the following : 16 Marks


List out general rules and guidelines for installation of residential Electrification (any
a)
eight
Ans: (Note: Similar to following rules any eight expected 1/2 Mark each point)
Following rules and guidelines for installation of residential electrification:-
1. Every installation is to be properly protected near the point of entry of supply cables
by a two-pole linked main switch and a fuse unit. In a two wire installation if one
pole is permanently earthed, no fuse, switch or circuit breaker is to be inserted in this
pole. A 3-pole switch and fuse unit is to be used in 3-ph supply.
2. The conductors used are to be such that size of conductor should carry rated current
and partial over load current safely.
3. The conductors installed are to be safe in all respects.
4. Every sub-circuit is to be connected to a distribution fuse board.
5. Every line (phase or positive) is to be protected by a fuse of suitable rating as per
requirements.
6. A switch board is to be installed so that its bottom lies 1.25 to 1.5 meters above the
ground floor.
7. A plugs and socket-outlets are to be of 3-pin type, the appropriate pin of socket
being connected permanently to the earthing system.
8. All incandescent lamps, unless otherwise required, are to be hung at a height of 2.5
meters above the floor level. And ceiling fans are to be hung 2.75 meters above the
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 7 of 30

floor.
9. Lights and fans may be wired on a common circuit. Each sub-circuit is not to have
more than a total ten points of lights, fans and socket-outlets. The load on each sub-
circuit is to be restricted to 800 watts.
10. No fuse and switch is to be provided in earthed conductor.
11. Every circuit or apparatus is to be provided with a separate means of isolation such
as a switch.
12. All circuit or apparatus requiring attention are to be provided with means of access
to it.
13. In any building, light and fan wiring and power wiring are to be kept separate.
14. In 3-Phase, 4-wire installation the load is to be distributed equally on all phases.
15. No additional load is to be connected to an existing installation unless it has been
ascertained that the installation can safely carry the additional load and that the
earthing arrangements are adequate.
16. Lamp holders used in bath rooms are to be constructed or shrouded in insulating
materials and fitted with protective shield and earth continuity conductor is not to be
size less than 7/0.915 mm.
17. The metal sheaths or conduits for all wiring and metal coverings of all consuming
apparatus or applications is to be properly earthed in order to avoid danger from
electrical shock due to leakage or failure of insulation.
18. Each sub-circuit is to be protected against excessive current (that may occur either
due to over load or due to failure of insulation) by fuse or automatic circuit breaker.
19. All light conductors are to be insulated or otherwise safe guarded to avoid danger.
After completion of work the installations are to be tested (the test are to be
carried out as described) before energisation.
20. Earth Resistance : should be very low for domestic installation it should be equal to
or less than 5 ohm to 8 ohm
21. Insulation Resistance between conductor : should be very high for domestic
installation it should be equal to or more than 1 mega ohm or it should be not be
50 M
less than =
Number of outlet
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 8 of 30

b) Define contract. State requirements of valid contract.


Ans: Contract : (1 Marks)
It is the agreement between two parties, owner (party No.1) and contractor (party
No.2) under some specific terms and conditions.

Following requirements of valid contract:


( 1/2 Mark for each requirements –Total 3 Mark)
1. Contract should be written.
2. Contract should be signed by proper witness
3. Contractor licenses should be valid.
4. Contract should be signed by competent authority.
5. Contract should be signed by proper authorized persons.
6. It should be legally challenged in the court.

A room is to be fitted with 1 fan, 1 tube and one light socket. Draw single line diagram,
c)
schematic diagram and wiring diagram
Ans: Single line diagram for 1 fan, 1 tube and one light socket : (2 Marks)

Schematic diagram for 1 fan, 1 tube and one light socket : (1 Marks)
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 9 of 30

Wiring diagram for 1 fan, 1 tube and one light socket : (1 Marks)

d) Draw a neat labeled diagram for underground service connection


Ans: Underground service connection: Diagram : 4 Marks )

or equivalent figure

Compare underground service connection and overhead service connection on the basis
e)
of safety, Labour cost, location and installation time
Ans: Compare underground service connection and overhead service connection:
( Each Point : 1 Mark)
S.No Basis Underground service Overhead service connection
connection
1 Safety More safety Less safety

2 Labour cost Cost is more Cost is Less

3 location For thickly populated area For general purpose it is


MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 10 of 30

it is preferred OR It is preferred OR It is open to sky


underground so repairing so repairing and Maintenance
and maintenance is less is more
4 Installation More Less
time

f) Prepare schedule of material for overhead service connection


Ans: (Minimum Eight point expected: 1/2 Mark each point)
Scheduled of material for overhead service connection is as follows:
1. 2.5 Sqmm x 2 core PVC insulated cable or insulated wire
2. ‘S’ Shaped GI pipe 50 mm diameter
3. 8 SWG GI earth wire
4. Meter Board
5. Stay Wire
6. Stay insulator
7. Saddles for pipe
8. Screw required for pipe fitting
9. Bobbin insulator
10. Earthing sundry
11. Earthing plate
12. Bars Nutbolts
13. Sand
14. Charcoal
15. Pipe clamp
16. Miscellaneous

Q.3 Attempt any FOUR of the following : 16 Marks


a) Draw Symbols for i) ICTP ii) Ceiling Fan iii) Twin Tubes iv) Push Button
Ans: i) ICTP ii) Ceiling Fan iii) Twin Tubes iv) Push Button

( Each Symbols : 1 Mark)


MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 11 of 30

A room consists of following load Tube points 4 Nos : 40 watt each, Fan points 3 nos :
100 watt each, Lamp points 2 nos : 60 watt each, 5A socket outlet 4 nos : 100 watt each,
15A socket outlet 2 nos: 1000 watt each,
b) Find i) Total light load and power load
ii) No. of sub circuits required
iii) Rating of main switch
iv) Rating of DB required
Ans: Given Data: (All data is assumed it may vary or it may not be available, there will be
only steps and this steps are expected) (Give stepwise Marks as mention below)

Total load in  tubes  watt  4  40  160 W


 Fans  watt  3 100  300 W

 Lamps  watt  2  60  120 W

 Sockets  watt  4 100  400 W


i) Totalconnectedlightingloadin a house 160 300120 980W or 0.98 KW , - (1/2 Mark)

ii) Total connected Power load in a house  2  1000  2000W or 2.0 KW , (1/2 Mark)

Total load connected  980  2000  2980 or 2.980 KW (1/2 Mark)

980
Total load in   1.225  2 Nos lighting sub circuit (1/2 Mark)
iii) 800

2000
Total load in   1 Nos Power sub circuit (1/2 Mark)
2000

iv) Distribution Board: So, 3 Number of MCB are required -------------------- ( 1/2 Mark)

Total Connected load is 2980 watt, so Number of sub circuit = 3 Nos.


v) Current rating of iron clad Main switch = since more current is 23 A.

Current rating Iron clad main switch = 32A ---------------------------- (1/2 Mark)

vi) Value of current rating of iron clad main switch: ------------------------- (1/2 Mark)
So Use: - 250V, 32A, ISI mark Main switch of any company
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 12 of 30

c) Differentiate between MCB and ELCB


Ans: (Any Four similar points expected: 1 Mark each)
S.No MCB ELCB
1 Miniature circuit breaker operates Earth Leakage circuit breaker
automatically at the time of short operates automatically at the time of
circuit fault or over load earth fault
2 The cost of the MCB is moderate Cost of the ELCB is high compare to
MCB
3 There is no need of replacement after There is no need of replacement after
tripping the MCB tripping the ELCB
4 MCB are designed for separate current ELCB are designed for separate earth
rating leakage current ratings

d) Compare residential installation and commercial installation on the basis of type of


supply, purpose of installation, load capacity, general requirements
Ans: (Each points : 1 Mark)

S.No Basis Residential installation Commercial installation


1 Type of Supply Generally single phase Generally 3 phase
2 Purpose of Domestic purpose Commercial purpose
installation
3 load capacity Lighting load is more, power Power load is more, lighting
load is less. load is less.
4 General MCB, ELCB and other Smoke detector & fire alaram
requirements safety measures willingly protection, MCB, ELCB and
installed other safety measures must be
installed

e) State the design consideration for commercial installation


Ans: (Minimum Eight point expected: 1/2 each point)
The following points of design consideration commercial Installation:

1) Find out the type of load and total electrical load for the given commercial installation.
2) Differentiate this total electrical load in lighting load and power load.
3) Make the no. of lighting sub circuit for lighting load.
Total Electrical lighting load
No. of Lighting Sub circuits 
800 W
OR
Total No. of lighting po int
No. of Lighting Sub circuits 
10
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 13 of 30

4) Make the no. of power sub circuits for power load.


Total electrical power load
No. of power Sub circuits 
1000 W or 2000 W
OR
Total No.of power po int s
No. of power Sub circuits 
1000 W or 2000 W
5) Find out total power consumption of every lighting and power sub circuits.
6) Find out rated Input current for every lighting and power sub circuit.
P = V1 cos  P = Input power for every sub circuit
V = voltage = 230 V
I = Input current for every sub circuit
7) Determine the size of wire required for every sub circuit by considering overload
starting surge and future expansion.
8) Draw the single line diagram.
9) Mark the batten on plan layout.
10) Find out the total length of batten required for every sub circuit and whole
commercial installation.
11) Find out the total length and size of wire required for every sub circuit.
12) List out the material required for whole commercial installation.
13) Find out cost of material and labour in estimation chart.
14) Find out the total cost of estimation with profit margin and contingencies charges.
15) Find out per point charges.
16) Draw the circuit diagram.

f) A motor is to be operated with star delta starter. Draw wiring diagram showing
connection for motor, starter and motor switch

Ans: Single line diagram - (4 Mark)


3-ph,4 wire 400v A.C. supply
Energy meter

S Main Fuse

ICTP

Λ / Δ starter

IM 3 Ø Induction motor OR
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 14 of 30

Wiring diagram –

Or equivalent ckt dia.


Q.4 Attempt any FOUR of the following : 16 Marks
a) State the need of earthing. Draw neat diagram for plate earthing.
Ans: Need of Earthing: ( 2 Marks)

1. To provide an alternative path for the leakage current to flow towards earth.
2. To save human life from danger of electrical shock due to leakage current.
3. To protect high rise buildings structure against lightening stroke.
4. To provide safe path to dissipate lightning and short circuit currents.
5. To provide stable platform for operation of sensitive electronic equipments.
Diagram for plate earthing : ( 2 Marks)

or equivalent figure
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 15 of 30

A room 4m x 5m is to be fitted with one tube, one fan and one 5A socket. Draw
b)
installation plan and wiring diagram. Calculate length of conduit and wire required.
Ans: Note: Credits may be given step wise for numerical problems. In some cases, the
assumed constant values may vary and there may be some difference in the
candidate’s answers and model answer.
Given Data: (The Assumed data may be vary (Give stepwise Marks as mention below)
Total load in Hall  tubes  watt  1 40  40 W
 Fans  watt  01 60  60 W

 Socket  watt  01 100  60 W

Total load in Hall  tubes in Watt  Fans in Watt  Sockets in watt

i) Total load in Hall  40  60  100  200 watt


200
Total load in Amps   0.869  1 Amp --------------------------- (1/2 Mark)
230

iii) Length of Conduit:

= 1.5 + 4+2+1+2.5+10%

= 11+10%

= 12.1 Mtr

= 12 Mtr ----------------------------------------------------------- (1/2 Mark)

iv) Length of Wire:

= 12 x 3 +20 % extra

= 36+ 20%

= 43.2 or 440 mtr ----------------------------------------------- (1/2 Marks)


v) Rating Main switch: - since rated input current is 1 A.
Assumed that Staring current = 1.5 times rated current
So starting current = 1.5x 1 = 1.5 A
So Use:- ------------ (1/2 Mark)
230V, 6A, ISI mark Main switch of any company
Installation plan: ----------------------- (1 Mark)
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 16 of 30

wiring diagram :- --- (1 Marks)

or equivalent figure

Describe how rating of main switch, motor switch DB and cable is decided in industrial
c)
installation.
Ans: (Reason of main switch:2 Marks & Reason of main switch B & cable : 2 Mark)
1. Reason of Main Switch or Fuse Rating is decided in industrial installation:
 Rating of main switch or fuse is based up the starting current of motor.
 For calculating starting current is considered 2 times that of full load current,.
Thus main switch is decided.
 If number of motors are there, then main switch is decided from following
formula.
Incoming current = Starting current of highest rated m/c + Full load current remaining all m/c
Thus from incoming current main switch is decided
2. Reason of Cable Rating is decided in industrial installation:
 The current rating of cables for supply to motor is based up on the normal full
load current of motor considering the overload capacity 50%
 We take 1.5 times the rated current or full load current. & thus cable rating is
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 17 of 30

decided.
3. Reason of DB Rating is decided in industrial installation:
 i.e MCB or fuse rating is decided from starting current of motor which explained
above.
d) State any six requirements of valid contract.
Ans: Following requirements of valid contract:
( First Two point: 1 Mark each & other Four Point:1/2 Mark each –Total 4 mark)
1. Contract should be written.
2. Contract should be signed by proper witness
3. Contractor licenses should be valid.
4. Contract should be signed by competent authority.
5. Contract should be signed by proper authorized persons.
6. It should be legally valid.
e) Give complete procedure for submission and opening of tender.
Ans: Procedure of submission Procedure of Tender:- (2 Marks)
 The tender is submitted from party No.2 (Bidder) to party No.1 (Owner) in sealed
envelopes within the specification date & time period.
 The is submitted in envelops No.2 titled by envelop No.1 & envelop No.2.
 The content in every envelop is given an above.
OR
 The system of submitting tender documents is also called as two envelope system.
 The treasury challan, deposit, call receipt, forwarding letter the copies of
registration certificate, income tax clearance certificate, and list of machinery to be
used to be sealed in one envelope.
 The tender set itself with quoted value should be sealed in another envelope: these
two sealed envelopes should again be put in one coverer and sealed. On the top of
this cover, the name of the work, address of the receiving authority should be
written. These envelopes are then handed over in person or send by post to the
address mentioned before the specified time and date
OR
 According to old procedure three envelopes are there and in third envelope rate
offered by the tenderer is given and it is mention at “ Envelop No.3”

Procedure of Opening of Tender:- (2 Marks)


The sealed envelopes are opened in presence of representative of bidders. The
procedure is as below
 The tenders are always opened at specified date & time in front of representative
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 18 of 30

of every bidder.
 Initially envelop No.1 of every party is opened. The all documents which are
given as above are checked if found O.K. then envelope No.2 of those parties is
opened.
 If one of the party having the any short coming in envelop No.1 then the envelop
No.2 of that party is not opened.
 The all contents in envelop No.1 are checked. It is as above & after opening the
all envelops of all parties the comparative statement is done and for suitable
company the contract is handed over.
 If one of the company having quotation of lowest price can be rejected by party
No.1 (Owner) due to poor reputation, large works in hand, unsuitable drawing or
without any reason.
 At first envelop No.1 of all parties are opened and comparative statement of all
parties done.
 The rejected party of whose envelope No.1 is invalid there envelope No.2 are not
opened it is freezed.
 For all reaming parties envelope No.2 opened and detailed comparative
statement is done.
 For lowest eligible bidders the contract is handed over.

f) Define security deposit and earnest money deposit


Ans: i) Security Deposit (SD):- (2 Marks)
Security deposit is amount or deposit given by the contractor to the owner
till satisfactory completion of the project work. Generally it is a 5 to 10 % of
the total estimated cost.

ii) Earnest Money deposit (EMD) :- (2 Marks)


EMD is a deposit taken as a guaranty from the bidder if the tender is accepted
by the owner and if the contractor (bidder) refuses to accept that work in that case
the EMD is not returned to that party it is generally 2 to 5 percent estimated cost. It
is refundable to every unsuccessful (not considered) bidder.
Q.5 Attempt any TWO of the following : 16 Marks
a) A three storeyed building has 10 shops on each floor. Each shop has 2 fan, 3 tubes, and
one power socket. Draw complete wiring diagram for above load.
Ans: Note: Credits may be given step wise for numerical problems. In some cases, the
assumed constant values may vary and there may be some difference in the
candidate’s answers and model answer.
Given Data: (The Assumed data may be vary (Give stepwise Marks as mention below)
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 19 of 30

Total load in One Shop  tubes  watt  03  40  120 W


 Fans  watt  02  60  120 W

 Power Sockets  watt  01 1000 1000W

Total load in One Shop  tubes inWatt  Fans in Watt  Socket in watt  Power Sockect

i) Total load in one Shop  120  120  1000  1240 watt ---------------------- (1 Mark)
1240
Total load in one shop Amps   5.391 Amp assu min g p. f .  0.9 - (1/2 Mark)
230

240
ii) Total load in   0.3  1 Nos lighting sub circuit ----------------- (1/2 Mark)
800

1000
Total load in   0.5  1 Nos Power sub circuit ------------------ (1/2 Mark)
iii) 2000

iv) Total load in one floor  Total Shop  Total load in one shop -------- (1/2 Mark)

Total load in one floor  10  1240


Total load in one floor  12400 Watt
Total load in one floor  12.400 KW --------------------------------- (1/2 Mark)
12400
v) Total load in One Floor in Amp  3  415  0.9

12400
Total load in One Floor in Amp 
646.902
Total load in One Floor in Amp  19.1682 Amp ------------------------------ (1 Mark)
vi) Total Load in Building = 3 floor x 1 floor total Load
= 3 x 12400
= 37200 watt
= 37.200 KW
37200
vii) Total load in building  ----------------------------------- (1/2 Mark)
3  415  0.9
37200
Total load in building 
646.902
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 20 of 30

Total load in building  57.504 Amp -------------------------------------- (1 Mark)


 For each floor 3-ph, 415 V, 4 Wire is to be supplied.

 On every phase 3 or 4 Shops are connected for every storeyed building.

Wiring Diagram for Lighting circuit in one shop:- (Similar to other shop & Building
floor) (1-Marks)

or equivalent figure

Wiring Diagram for Main Board & Circuit: (1-Marks)

or equivalent figure
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 21 of 30

A hall of 10m x 6m is to be fitted with 8 fan and 15 tubes. Pare schedule of material for
b)
complete installation.
Ans: Note: Credits may be given step wise for numerical problems. In some cases, the
assumed constant values may vary and there may be some difference in the
candidate’s answers and model answer.
Given Data: (The Assumed data may be vary (Give stepwise Marks as mention below)
Total load in Hall  tubes  watt  15  40  600 W
 Fans  watt  08  60  480 W

Total load in Hall  tubes in Watt  Fans in Watt

i) Total load in Hall  600  480  1080 watt -------------------------- (1 Mark)


1080
Total load in Amps   4.695  5 Amp assu min g p. f .  1 --- (1 Mark)
230

1080
ii) No. of Sub circuit   1.35  2 Nos lighting sub circuit ------------ (1 Mark)
800

23
According to po int No. of Sub circuit   2.3  3 Nos lighting sub circuit
10

iii) Rating Main switch: - since rated input current is 16 A.


Assumed that Staring current = 1.5 times rated current
So starting current = 1.5x 5 = 7.5 A
So Use:- ------------ (1 Mark)
230V, 16A, ISI mark Main switch of any company
Cable selected: 1 Sqmm, Copper cable single core
Wiring Layout:
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 22 of 30

Conduit required :
= 1+1.5+1.5+5x7+3
= 3+35+3+10%
= 41+4.1
= 45 Mtr
Wire required :
= 135+20%
= 162 Mtr

Note:- Cost of material it not required or may vary so do not stick on final figures

ii) Schedule & cost of Material: - (4-Marks)

S.No Material of Material Quantity Rate Total


Amount
1 ICDP 250V,16A 01 250.00 250.00
2 6A MCB for lighting load 03 45.00 135.00
3 PVC conduit (3 Mtr pipe) 1.5mm 45 Mtr 15.00 300.00
thickness
4 Copper Earthing Plate 01 490.00 490.00
5 DP 01 150.00 150.00
6 Earthing Sundry lumsump 200.00 200.00
7 6A Switch 23 10.00 260.00
8 Ceiling rose 23 10.00 180.00
9 2.5 Sqmm PVC wire Running earth 15 Mtr 7.00 105.00
10 Flexible wire for connection of tube & 12 Mtr 5.00 60.00
Fan
11 1 Sqmm PVC wire with earth wire (90 02 Bundle 780.00 1560.00
Mtr -1 bundle)
12 Junction Box 25 approx. 07.00 175.00
13 10 x 12 Switch board with cutting 02 35.00 70.00
15 Labour Charges 23 110.00 2530
Total Amount :- 6465.00
15 Contingencies+ profit margin 10% Amount:- 646.50
Total Amount:- 7111.50
iii) Cost of work: Say Total Amount: 7112.00
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 23 of 30

c) Prepare schedule of material for industrial load as shown in figure No.1

Ans: Note: Credits may be given step wise for numerical problems. In some cases, the
assumed constant values may vary and there may be some difference in the
candidate’s answers and model answer.
Assuming height of Ceiling if 3 m from the floor.
Motor is installed 1 M away from the nearest wall.
Height of Main Switch is 1.2 M from the floor
Step No. 1:- The out power of induction motor = 10 x 735.5 = 7355 W-------- (1/2 Mark)
Step No. 2:- Input power of I. M = output power of I M / efficiency of IM motor.(1/2 Mark)
Assuming efficiency of I.M is 80 %
Input power of induction motor = 7355 / 0.8 = 9193.75 W
Step No. 3:- To determine the rated current for I.M ---------------------------------- (1/2 Mark)
P  3 V L I L Cos V L  415 V
P
IL 
3 VLCos

9193.75
IL  Cos  0.8 assumption
3  415  0.8
I L  15.98 Amp Rated current  15.98 Amps
Step No. 4:- To determine the size & core of cable:- --------------------------------- (1/2 Mark)
Starting current is assumed two times rated input current for starting surge,
momentary short circuit & overload. Starting current = 2 x 15.98 = 31.96 Amps
So use,
10 Sqmm 3 core cable for the I.M.
Step No. 5:- Determined the size length & dimensions of ICTP earth wire at input cable:-
The rating of main switch is 450 V, 32 Amp ICTP ISI mark
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 24 of 30

Size of earth wire 8 SWG copper or 6 SWG GI ------------------------ (1 Mark)


Length of earth wire = 2 times length of cable
Length of input cable for I .M at actual
Step No.6: Draw the circuit Diagram. ---------------------------------------------------- (1Mark)

or equivalent figure

Step No. 7:- Find out the estimation chart with material cost & labour cost: ----- (4 Mark)
Length of cable - it should be calculated as per their assumed distances
Material Shedule:

1 32 A Busbar with Netural link 01


2 3-ph,4 wire 415V, 15-30A, A.C. supply Energy 01
Meter
3 ICTP 450V,32A 02
4 Star Delta Starter 01
5 8 SWG Earthing Wire 0.5.kg
6 60 cm x 60cm x6.36 mm Copper Earthing Plate 01
7 Earthing nut-board 04
8 Earthing Sundry lumsump
9 12x12 Wooden Board for SDB 02
10 Screw 3 inch length 12 No
11 Screw 1 inch length 06 No
12 R,Y,B Indication Lamp 03
13 PVC Tape 04
14 Saddles 1 box
15 32mm PVC conduit (3 Mtr pipe) 1.5mm thickness 7 pipe
17 10 Sqmm x 4 Copper armored cable 10 Mtr
18 Junction Box 03 approx.
19 Lug & gland 06 approx
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 25 of 30

Q.6 Attempt the following : 04 Mark


Decide rating of main switch, DB, Motor switch and starter for following load.
a)
i) 1HP, 3-Ph Sq.cage IM, IFL = 5A ii) 3 HP, 3-Ph Slip ring IM, IFL = 8A
Ans: (Rating point -2 Mark and Procedure – 2 Mark)

Ratings of main switch, DB, Motor switch and Starter are decided by the following
points:-

 Type & Capacity of motor which is used in the installation.


 Supply providing to the motor which is used in installation.
 Power factor of the motor.
 Future expansion.
 Starting surge, over load and momentary short circuit on the motor.
i) Rating for 1HP, 3-Ph Sq.cage IM, IFL = 5A :-
Total power  Total H .P  735.5
Total power  1 HP  735.5  735.5 watt
Total power  .735.5 watt
HP  735.5
Rated input current I L 
3 VL    Cos

1 735.5
Rated input current I L 
3  415  efficency  P. f

= 1.6 Amp
But IFL is given 5A, So use
 Main switch : ICTP, 415V, 8A or 5A
 DB : 3-Ph, 415V, 10A, Distribution board of two outlet
 Motor switch: 415V, 16A industrial plug socket
 Starter : 3-Ph, 415 V, 1 HP DOL Starter
ii) Rating for 3 HP, 3-Ph Slip ring IM, IFL = 8A:-
Total power  Total H .P  735.5
Total power  3 HP  735.5  735.5 watt
Total power  .2206.5 watt
HP  735.5
Rated input current I L 
3 V L    Cos
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 26 of 30

3  735.5
Rated input current I L 
3  415  efficency  P. f

= 4.80 Amp
But IFL is given 8A, So use
 Main switch : ICTP, 415V, 16A
 DB : 3-Ph, 415V, 16A, Distribution board of two outlet
 Motor switch: 415V, 32A industrial plug socket
 Starter : 3-Ph, 415 V, 3 HP Rotor resistance Starter

b) Attempt any ONE of the Following 12 Marks


i) Estimate the cost of installation for flat as shown in figure No.2.

Ans: (Costing of material is not required marks are only allotted for Material list: 12 Point
Expected Each Point: 1 Marks –Total 12 Marks)

Total load in Installation  tubes  watt  2  40  80 W


 Fans  watt  2  60  120 W

 Lamps in WC & bath  watt  2  40  80 W --- (1 Mark)

Total load in Hall  tubes in Watt  Fans in Watt  Lamps in WC & Bath

i) Total load in Installation  80  120  80  280 watt -------------- (1 Mark)


280
Total load in Amps   1.217  2 Amp --- (1 Mark)
230
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 27 of 30

So Use:- ------------ (1 Mark)


230V, 5A, ISI mark Main switch of any company and lighting load 280 watt
& 6 points.
Therefore one sub circuit is required
Wiring Layout: --- (2 Mark)

Length of the conduit: --- (1 Mark)


V H H V H H H H H
 1.5 4  2.5 4 2.5 2.5 2.5 3  2  10%
 11.5  10  10%
 21.5  10%
 21.5  2.2
 24.2  24 Mtr
Length of the Wire: --- (1 Mark)
 24  3  20%
 72  20%
 72  14.4
 86.4  87 Mtr
Schedule of Material: ( 4 Mark)

S.No Material Quantity Rate Total


Amount
1 ICDP 250V, 6A 01 250.00 250.00
2 6A MCB for lighting load 01 45.00 45.00
3 PVC conduit (3 Mtr pipe) 1.5mm 24 Mtr 15.00 360.00
thickness
4 1 Sqmm Copper Wire (90 mtr bundle) 01 mtr 650.00 650.00
5 Copper Earthing Plate 01 490.00 490.00
6 Earthing Sundry lumsump 200.00 200.00
7 6A Switch 07 15.00 105.00
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 28 of 30

8 6A Three point socket 01 18.00 18.00


9 Ceiling rose 04 10.00 40.00
10 Angle holder 02 10.00 20.00
11 Junction Box 08 10.00 80.00
12 4 x 4 Switch board with cutting 03 20.00 60.00
13 25 x 8 screws 01 35.00 70.00
14 Raval plug 03 05.00 15.00
15 Labour Charges 08 110.00 880.00
Total Amount :- 3283.00
16 Contingencies+ profit margin 10% Amount:- 328.30
Total Amount:- 3611.30
iii) Cost of work: Say Total Amount: 3611.00

ii) Estimate the cost of installation for workshop as shown in figure No. 3

Ans: (Costing of material is not required marks are only allotted for Material list: 12 Point
Expected Each Point: 1 Marks –Total 12 Marks)

i) Rating for 3HP, 3-Ph I.M :-


Total power  Total H .P  735.5
Total power  3 HP  735.5  2206.05 watt
Total power  .2206.05 watt ------ (1 Marks)
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 29 of 30

HP  735.5
Rated input current I L 
3 V L    Cos

2206.5
Rated input current I L 
3  415  efficency  P. f
2206.5
Rated input current I L 
3  415  0.85  0.85

Rated input current I L  4.248 Amp ------ (1 Marks)

Starting current = 2 x 4.248 = 8.496 Amp ---------------------- (1 Marks)


So use, 2.5 Sqmm , 4 core cable copper cable , 500V grade should be
selected rating of SFU, ICTP switch is 16A, 450V grade should be selected. -(1 Marks)

ii) Rating for 2HP, 3-Ph I.M :-


Total power  Total H .P  735.5
Total power  2 HP  735.5  1471 watt
Total power  .1471 watt ------ (1 Marks)
HP  735.5
Rated input current I L  ------ (1 Marks)
3 V L    Cos

1471
Rated input current I L 
3  415  efficency  P. f
1471
Rated input current I L 
3  415  0.85  0.85

Rated input current I L  2.83 Amp


Starting current = 2 x 2.83 = 5.66 Amp ---------------------- (1 Marks)
So use, 1.5 Sqmm , 4 core cable copper cable , 500V grade should be
selected rating of SFU, ICTP switch is 16A, 450V grade should be selected. -(1 Marks)
Schedule of Material : (4 Marks)
S.No Material of Material Quantity Cost of
material
1 32 A Busbar with Netural link 01 1750.00
2 3-ph,4 wire 415V, 15-30A, A.C. supply 01 500.00
Energy Meter
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)

SUMMER– 2016 Examinations


Subject Code: 17416 Model Answer Page 30 of 30

3 ICTP 450V,16A 03 750.00


4 DOL Starter 02 4000.00
5 8 SWG Earthing Wire 0.5.kg 225.00
6 60 cm x 60cm x6.36 mm Copper Earthing 01 450.00
Plate
7 Earthing nut-board 04 35.00
8 Earthing Sundry lumsump 3500.00
9 12x12 Wooden Board for SDB 05 25.00
10 Screw 3 inch length 18 No 30.00
11 Screw 1 inch length 10 No 15.00
12 R,Y,B Indication Lamp 03 60.00
13 PVC Tape 04 40.00
14 Saddles 1 box 25.00
15 32mm PVC conduit (3 Mtr pipe) 1.5mm 7 pipe 490.00
thickness
16 2.5 Sqmm x 4 Copper aramoured cable 15 Mtr 150.00
17 1.5 Sqmm x 4 Copper aramoured cable 10 Mtr 240.00
18 Junction Box 03 approx. 30.00
19 Lug & gland 06 approx 130.00
20 Labour Charges Lumsum 3000.00
Total Amount :- 15445.00
21 Contingencies+ profit margin 10% Amount:- 1544.50
Total Amount:- 16989.50
iii) Cost of work: Say Total 16990.00
Amount:

------------------------------------------------------END-------------------------------------------------------