Soft Landscaping ROW Area Risk Assessment
Soft Landscaping ROW Area Risk Assessment
CONTROL SHEET
Contract No. 7687-00
Project Title MARSA AL SEEF
RA Reference RA MS 7687-PGL-LSCT-RA-00001
RA Date 31.10.2017 Next review date:
RA Revision No. 01
٭Task / Activity SOFT LANDSCAPE PHASE-1,2,3&4 (ROW AREA)
Expected manpower Hazardous Y N Confined space Y N
20 Chemical required?
required for the task: entry required?
(Tick as applicable) (Tick as applicable)
Plant & Equipment involved: Hand Shovel, Pick Axe, Garden Rake, Khurfi (Garden Shovel ), RISK MATRIX
JCB/Excavator , Bob Cat, Mobile Crane, Boom Loader, HiAB, Tripper , Edge shears and Ladders
Power tools: NA
Probability (P)
1 1 2 3 4 5
Severity (S)
1-3 Acceptable Low – L Minor / <3 Days Injury Minor 2 2 4 6 8 10
4-9 Before task commences Medium - M Moderate / >3 Days Injury Moderate 3 3 6 9 12 15
10-16 Before task commences High - H Major / Permanent Disability Injury Major 4 4 8 12 16 20
20-25 Immediate Very High - VH Catastrophic / Fatality Catastrophic 5 5 10 15 20 25
May
Unlikely Likely Very Likely Certain or Imminent
Happen
Verified by:
Project Manager: Name; T.Arulraj Signature: Date:
Softscape engineer
Name: Zia ur rahman Signature: Date:
Safety Officer: Name: Petchimuthu Signature: Date:
DISTRIBUTION: Original to: Site HSE File Copy to: Site/ Site office
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
Article 91, 92 of Federal Law. Local order 61/1991 Dubai, CoC Safety
HSE Induction to be done to all workers
before entering the site.
*Access & Egress of plant & Equipments
shall be clear from any obstruction.
*Movements of P & E should be guided
by trained banks man
practice.
Unskilled Driver & unsafe in minor to major casualty allowed to operate the heavy machines.
Delivery of material
*Don’t allow the equipment if third part
01 and trees,shrups, R driving vehicle Rotating parts 3 3 9 3 1 3
certificate are not available
small plant, to site. Collision with the fixed Dislocation and fall of Speed Limit 10Km/h
structure & material. loads which may lead to *Visual inspection shall be carried on
Fire Emission of Smoke property damage & injury vehicle before allowing it to enter the site.
Overloading, unsecured & *Safety or Protection devices such as
improper stacking of load. restrained bar shall be completely
Speed violation installed and capable to support the load.
Reversing without flagman *Daily inspection should carry out on all
equipments.
*Daily TBT need to conduct by concerned
supervisor / Engineer
*Ensure Correct staking height
*Ensure Load is properly positioned in
the trailer bed
*Overloaded vehicles will not be
permitted at site
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
*
*Storage Area should be even / one level
*Ensure no personal working near by the
Article 91, 92 of Federal Law. Local order 61/1991 Dubai, CoC Safety
equipment
Unsecured tree storage *Assigned flagman while equipment
Slip, Trip & Fall operating
Improper equipment used *No material to be placed near the edge
of any excavation
for lifting (Over loading)
*All the trees should be stored properly
practice.
area. *Supervisor should inspect his area for
02 R
Extreme weather condition 3 4 12 3 2 6
proper housekeeping & maintaining of
collapse of crane/boom tools at site.
lifter detachment of load *Isolate the area with proper barricade
Lifting of trees by
Falling from height with sign
crane or hiab or
Inadequate lighting Ensure lifting plan and lifting permit
,boom loader Ensure 3rd party safety certificate for
poor communication
Falling lifting gears crane/lifting equipment/operator/riggers
Keep safe distance from the excavation
Keep the lifting area clear of personal
Do a trial lift before lifting the tree
Ensure swl
Don’t stand under suspended load
Crane parking at ground firm level
should be used out riggers
Ensure operator,rigger,signal man have
good communication.
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
Same as Above
*As Possible the distance, twisting and load
*Personnel Injury
*Work related Muscle Dis- should be reduced.
Shifting of material Capability of the person, while order *Proper Handling techniques should be
03 R 3 3 9 3 1 3
Manually handling the shrubs and small *Property Damage followed
plants *Physical Effects *Tool box talk shall be given on the Manual
Handling techniques and training shall be
conducted on Manual handling.
Check the insects
Use Appropriate PPE
Safety practice
officer /foreman
Damage tools *use good condition hand tools
*use proper PPE
04 Use Hand tools R 3 3 9 Daily visual inspection to require for tools as 3 2 6
well as workmanship.
Damage tools need to be discarded
Trained and certified operatives.
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
Article 91, 92 of Federal Law. Local order 61/1991 Dubai, CoC Safety practice
Where possible sides of excavations to
be battered back to a safe freestanding
angle
Provide clear access and egress
Ladder should be provide
Excavations require fencing, backfilling
or covering, at night as well as day
Suitable warning notices required to warn
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
Safety practice
Use of mixture and visitors Wash hand and gloves after use
chemical/fertilizers Very toxic to aquatic life Nervous system effect Store in the closed original container a
07 in the plantation R with long lasting effect from over exposure 5 2 10 dry well-ventilated with sign 5 1 5
Proplant fungicide Provide fire extinguishers DCP
Actara *Daily TBT need to conduct by concern
supervisor / Engineer
Training of workers on proper handling of
chemicals
Prohibit unauthorised entry
Do not reuse empty container
Empty container to be taken to an
approved waste handling site for
recycling or disposal
First aider available in the site.
Keep the stock very minimum and low
quantity.
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
Safety practice
*Lifting shall be handled by only competent
rigger.
*All people shall be proper PPE as per the
project requirement.
*Comments from the Main contractor shall
be followed.
* All lifting and installation shall be carried
out in the presence of activity responsible
supervisor.
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
Same as Above
Ensure a suitable pedestrian route is
maintained-if necessary re-route
R Clean any excess mud/debris off the road
Working at near Minor/major injury and
09 Accident and incident 4 4 16 so far as is practicable. 4 1 4
live road fatality to person Beware of work activities that create dust
or debris that may impact on vehicular or
pedestrian routes.
Wear appropriate PPE such as helmets
hi-visibility vests and safety footwear.
Consider and organise site traffic
access/egress.
Surveyor / Engineer/safety
bridge should be passed .
All necessary NOCs should be obtained
Same as Above
from concerned authorities.
Disruption in public Tool box talk shall be done for the task.
transportation system Above the metro overhead area carryout
officer
Working near metro Damage to metro
10 R and property damage 4 4 16 manual excavation. 4 1 4
overhead bridge overhead Ensure competent supervision full time
,action notice from the
authorities while work is carrying out.
Above the metro overhead bridge area
planting only small plants and shrubs
and grass only.
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
Article 91, 92 of Federal Law. Local order 61/1991 Dubai, CoC Safety
*Access and egress of plant& equipment
shall be clear from any obstruction
*Movements of P&E should be guided by
banks man
* Equipment should not be operating without
the banks man
practice
equipment
*Daily TBT need to conduct by concern
supervisor/Engineer
٭Task name: SOFT LANDSCAPE PHASE-1,2&4 ROW AREA Risk Assessment Date:31.10.2017
Rating Risk
Activity (see Risk Legal
Value Reqd. Sign. Resp.
SN Hazard /Aspect Risk / Impact enclosed Existing Controls (OHS & E) Value
Person
Hard Landscaping legend page R=
Y/N
for details) SXP
Same as Above
the completion of task
officer / foreman
surveyor /safety
Site Engineer /
Poor House keeping Minor / Major Injury to the *All materials, Equipment belonging to
Slips / Trips person the subcontractor shall be removed that
13 Completion of tasks R 03 02 06 can cause harm or inconvenience 03 01 03
*The Area should be clean and free from
spilled liquid or materials to prevent slip /
trip etc.
*Visual inspection to be carried out
٭Mandatory
٭R – routine / NR – non routine
A Dutco Balfour Beatty Company Page 11 of 11 WI HSE 001A / April. 2015