Sr No Project Name Task Name Requesting Team
Tuesday, January 01, 2019
Leave
Wednesday, January 02, 2019
DVR Supprt -Tickit
1 Sales & Service DVR INC000003644348 - RE: DVR Error AD-DMS
DVR Supprt -Tickit
2 Sales & Service DVR AD-DMS
INC000003644351 - RE: DVR date correction - Immediate attention
3 Market Share Working on Marketing Share - Phase II changes Pravesh
4 Market Share Working on VAPT report points for Market Share port Pravesh
Thursday, January 03, 2019
1 Market Share Working on VAPT report points for Market Share port Pravesh
2 Market Share Working on Marketing Share - Phase II changes Pravesh
3 Sales & Service DVR DVR Supprt -Tickit AD-DMS
INC000003646084 - RE: Unable to fill DVR
Friday, January 04, 2019
1 Market Share Working on Marketing Share - Phase II Development Pravesh
2 Sales & Service DVR DVR Supprt -Tickit AD-DMS
INC000003649277 - RE: Unable to fill DVR IM3748492
Saturday, January 05, 2019
Holiday
Sunday, January 06, 2019
Holiday
Monday, January 07, 2019
1 Market Share Working on Marketing Share - Phase II Development Pravesh
Sr No Project Name Task Name Requesting Team
Thursday, January 24, 2019
1 EMS CRUD Masters Dot net
Sr No Project Name Task Name Requesting Team
Wednesday, February 06, 2019
1 EMS Dot net
1. Prevent duplicate data insertion in
production and machine matrix details
2. GetProductionList
3. MachineCreationUpdation
4. SectorCreation
5. DivisionMaster
6. GetDivisionList
Sr No Project Name Task Name Requesting Team
Thursday, February 07, 2019
1 EMS Dot net
[Link] fields in masters table and
[Link] for
plantwise,productionwise,cellwise(Pendin
g)
Sr No Project Name Task Name Requesting Team
Friday, February 08, 2019
1 EMS Dot net
Update Production and machine details
Sr No Project Name Task Name Requesting Team
Monday, February 18, 2019
1 EMS Filter the data of Production details Dot net
Sr No Project Name Task Name Requesting Team
Tuesday, February 19, 2019
1 EMS Filter the data of Production details Dot net
Sr No Project Name Task Name Requesting Team
Wednesday, February 20, 2019
1 EMS Dot net
Trends
Start Date Target / Planned End Date % Completed Status
Leave
2-Jan-19 2-Jan-19 100% Completed
2-Jan-19 2-Jan-19 100% Completed
2-Jan-19 NA 10% WIP/ Pending
2-Jan-19 3-Jan-19 60% WIP/ Pending
VAPT v1.2 changes are done, created deployment package for VAPT ser
2-Jan-19 3-Jan-19 100% (Working)
Will test on VAPT server after deployment of package.
WIP/ Pending
2-Jan-19 NA 10% Completed Zone master with design, working AO master page
3-Jan-19 3-Jan-19 100% Completed
1) Completed Zone master with design
2-Jan-19 NA 15%
2) Completed AO master page
4-Jan-19 4-Jan-19 100% Completed
Holiday
Holiday
1) Completed Zone master with design
2-Jan-19 NA 25% 2) Completed AO master page
3) Completed State master page
Start Date Target / Planned End Date % Completed Status
24-Jan-19 NA 100% Completed
Start Date Target / Planned End Date % Completed Status
6-Feb-19 100% Completed
Start Date Target / Planned End Date % Completed Status
7-Feb-19 50% Pending
Start Date Target / Planned End Date % Completed Status
8-Feb-19 NA 100% Completed
Start Date Target / Planned End Date % Completed Status
18-Feb-19 NA 70% pending
Start Date Target / Planned End Date % Completed Status
19-Feb-19 NA 100% Completed
Start Date Target / Planned End Date % Completed Status
20-Feb-19 NA 100% Completed
Remarks
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Remarks
[Link] create,update web api created [Link] master crud api created [Link] and divisions table and api created.
Remarks
[Link]
adyAssignCellShi
ft proc and api
created.
[Link],division
s,machine crud,
[Link]
ist,GetDivisionLis
t
Remarks
[Link] fields in
Supplier master
table and API
(Createdby,Upda
tedBy,SupplierLo
cation,SupplierT
ype).
Remarks
[Link] and
machine name
showing in
production
details and
machine matrix
api
2.USP_UpdatePr
oductionDetails
store procedure
created.3.USP_U
pdateMachineD
etails Store
procedure
[Link]
eMachineProduc
tionData API
created
Remarks
filter working
Remarks
filter working
Remarks
Trends store
procedure and
api created,add
paramter
modified date in
readings table
where store
data from
zenetix
le and api created.
Stat Date Project Name
3/11/2019 BayView
3/12/2019 BayView
3/13/2019 M-asc Process
3/14/2019 M-asc Process
3/15/2019 M-asc Process
3/16/2019 Holiday
3/17/2019
3/18/2019 M-asc Process
3/19/2019 M-asc Process
3/20/2019 M-asc Process
3/21/2019 Holi
3/22/2019 SL
3/23/2019 Holiday
3/24/2019
3/25/2019 M-asc Process
3/26/2019
3/27/2019
3/28/2019
3/29/2019 SL
3/30/2019 3
3/31/2019
4/1/2019 M-asc Process
4/2/2019 BD tracker,M-asc Process,Smart - Pro
4/3/2019 Smart - Pro,M-asc process
4/4/2019 M-asc Process
4/5/2019 M-asc Process
4/8/2019 M-asc Process,Smart-Pro
4/9/2019 M-asc Process,Smart-Pro
4/10/2019 M-asc Process
4/11/2019 M-asc Process
4/12/2019 M-asc Process,Smart-Pro
4/13/2019
Holiday
4/14/2019
4/15/2019 M-asc Process,Smart-Pro
4/16/2019 M-asc Process
Task Name
Login Module
Add Job
File Upload Module
File Upload Module
Acknowledgement checker module
[Link] Incharge Sales order maker [Link] Incharge Checker One Module
[Link] Incharge Sales order maker [Link] Incharge Checker One Module
[Link] Incharge Sales order maker [Link] Incharge Checker One Module
Corporate Account
Acknowledgement checker,Hub incharge sales order maker,Indent Maker
Hub incharge sales order maker
Hub incharge sales order maker
Hub Incharge,Filter production details reports
BD tracker(Done),M-asc Process(Done),Smart - Pro(Pending)
Smart - Pro,M-asc process
E-Mail Trigger functionality in M-asc Process
E-Mail Trigger functionality in M-asc Process
E-Mail Trigger functionality in M-asc Process,Smart-Pro Deployment
1.E-Mail Trigger functionality in M-asc Process [Link] recover
[Link] code not visible in dropdown while login by admin user on production2.E-Mail functionality for acknowledgement
[Link] user configuration on production 2.E-Mail functionality changes [Link] duplicate data of indent makers on produc
[Link] recover [Link] submitting data through checker1,showing all pending cases to all rest checkers [Link] Mapping
Holiday
[Link] Mapping of M-asc Process -Pending [Link] Date in to Annexure(Smart-Pro) - Completed
[Link] Mapping of M-asc Process
Requesting Team Start Date Target / Planned End Date
Bhojraj 3/11/2019 3/11/2019
Bhojraj 3/12/2019 3/12/2019
Bhojraj 3/13/2019 15-Mar-19
Bhojraj 3/13/2019 15-Mar-19
Bhojraj 3/13/2019 15-Mar-19
Bhojraj 3/18/2019 20-Mar-19
Bhojraj 3/19/2019 21-Mar-19
Bhojraj 3/20/2019 22-Mar-19
Bhojraj 3/25/2019 25-Mar-19
Bhojraj 3/26/2019 26-Mar-19
Bhojraj 3/27/2019 27-Mar-19
Bhojraj 3/28/2019 28-Mar-19
Bhojraj 4/1/2019 1-Apr-19
Bhojraj 4/2/2019 2-Apr-19
Bhojraj 4/3/2019 3-Apr-19
Bhojraj 4/4/2019
Bhojraj 4/5/2019
Bhojraj 4/8/2019
Bhojraj 4/9/2019
Bhojraj 4/10/2019 4/10/2019
Bhojraj 4/11/2019
Bhojraj 4/12/2019 4/24/2019
Bhojraj 4/15/2019 4/24/2019
Bhojraj 4/16/2019 4/24/2019
% Completed Status
100% Completed
100% Completed
50% Pending
100% Completed
100% Completed
30% Pending
60% Pending
100% Completed
100% Completed
100% Completed
50% Pending
100% Completed
Completed
100%
70% Pending
100% Completed
30% Pending
50% Pending
60% Pending
80% Pending
100% Completed
100% Completed
10% Pending
M-asc Process screen mapping(30%),Smart pro (100%) Pending
45% Pending
GetSysAdvLoginDetails,SysManagerDetails table,procedure and api created
AddJob,GetJobDetailsBySysAdvisorID table,procedure and api created
[Link] multiple File upload issue in Indent maker and acknowledgement,[Link] file upload case, we have maintain different sessions wit
[Link] multiple File upload issue in Indent maker and acknowledgement,[Link] file upload case, we have maintain different sessions wit
[Link] Acknowledgement checker, by default bind gridview by ALL FOFO’s and ALL status.2.•In Acknowledgement checker, showing data acc
[Link] hub login, filtered according to hub display all FOFO’s list in dropdown [Link] hub login,default showing all data with mapped FOFO’s an
[Link] hub login,showing FOFO’s list in gridview which has mapped with that particular [Link] sales order length in Hub incharge sa
[Link] hub login,showing FOFO’s list in gridview which has mapped with that particular [Link] sales order length in Hub incharge sa
[Link] Hubinchargemaker fills any sales order then showing list of pending status in corporate hub menu.
[Link] company list updated in database for acknowledgement letter maker page [Link] length for sale order 1 and [Link] ma
[Link] uploading issue in hub incharge sales order resolved
1..File uploading issue in hub incharge sales order resolved
[Link] checker one and hub incharge sales order proc changes.
[Link] hub incharge sales order one, showing only those data who have been mapped with francises id
1. Francises are mapped with hubs user .[Link] mapped with RSA region issue resolved 3. In smart pro, Removed Month
1. In smart pro, Removed Month word from FrmAnnexure 2 as well as add field of nature of business in code behind and page
1.E-Mail trigger functionality in M-asc Process
E-Mail Trigger functionality for HO operations checker two and checker three
1.E-Mail Trigger functionality for Hub incharge sales order maker,corporate [Link] accountant [Link] Email templat
[Link] Email template page design [Link] store procedure creation and Functionality [Link] Recover
[Link] code not visible in dropdown while login by admin user on production2.E-Mail functionality for acknowledgement m
[Link] design of E-Mail template [Link] new user id on production (PO tracker) and given access for checker two an
[Link] recover [Link] submitting data through checker1,showing all pending cases to all rest checkers [Link] Mapping
[Link] Mapping of M-asc Process -Pending [Link] Date in to Annexure(Smart-Pro) - Completed
Screen mapping Of Acknowledgement Checker
Priority
WFH
M-asc Process,Smart Pro
Item No. Type Status Topic
1 mfscl Completed - complete with page designed
2 mfscl v2nd(laravel & vuejs) Completed mfscl v2nd completed admin city master
3 mfscl v2nd(laravel & vuejs) Completed
4 mfscl Completed
5 mfscl v2nd(laravel & vuejs) Completed
6 mfscl v2nd(laravel & vuejs) Completed
7 mfscl v2nd(laravel & vuejs) Completed
8 mfscl
9
10
11 MFSCL Completed
9 Carnation Completed
10 MFSCL Completed
11 Carnation Completed
12 MFSCL Completed
13 Carnation Completed
14 Carnation Completed
15 Carnation Completed
16 Carnation Completed
17 Carnation Pending
18 Carnation Completed
22 Carnation Completed
23 Carnation Pending
24 Carnation Completed
25 Carnation Pending
26 Carnation Pending
27
28
27 cranation Completed
28 cranation Completed
29 cranation Completed
30 cranation Completed
31 cranation Completed
34 cranation Completed
35 cranation Completed
36 cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
cranation Completed
mfscl Completed
mfscl Completed
Completed
mfscl Completed
mfscl Completed
cranation Completed
cranation Completed
Completed
mfscl Completed
mfscl Completed
cranation Completed
cranation Completed
cranation Completed
mfscl Completed
cranation Completed
mfscl Completed
cranation Completed
mfscl Completed
mfscl Completed
mfscl Completed
mfscl Completed
mfscl Completed
mfscl Completed
Completed
MFSCL Completed
MFSCL Completed
MFSCL Completed
carnation
Completed
MFSCL Completed
Completed
MFSCL Completed
carnation Completed
MFSCL Completed
MFSCL Completed
MFSCL Completed
carnation Completed
MFSCL Completed
MFSCL Completed
MFSCL Completed
carnation Completed
Description
- complete with page designed
mfscl v2nd completed admin city master
worked on car model
made dynamic live search for city state service center name together , and for car make model ,added datepicker
LP_West page ,LP_East page,LP_South,LP_North page completed form submission
[Link] dynamic live search for city state service center name together
[Link] dynamic live search car make model ,
[Link] datepicker
[Link] send
[Link] you page with complete
completed car-model bulk,delete row,and view upload
completed car-make bulk,delete ,and view upload
there was issues after login redirect on dashboard which that issues been resolved,laravel provide simple login with auth due to customization our login pr
mfscl live - worked on lp-east,lp-west
mfscl v2nd - completed dental panel page
womens day activity was there
mfscl live - done with cosmetic changes and functional changes on live site
deployed at client site
searched admin for carnation
mfscl live - worked on request changes on lp-east,lp-west,lp-south,lp-noth
carnation - raw designed created for home page
worked on exide-life pages
desiged page with responsive
carnation timeline created.
search for map bounce js
worked on exide life page
working on exide-life thank you page
carnation - worked on carnation home page
carnation - completed home page with responsive
[Link] on admin panel - carnation
[Link] on login page - carnation
[Link] Home page layout . - carnation
[Link] offer page . - carnation
[Link] partner with us page - carnation
[Link] about us page - carnation
[Link] contact us page - carnation
[Link] of activity - holi celebration
[Link] book appointment page . - carnation
[Link] service center locator page - carnation
[Link] menu in backend
[Link] on dashboard
[Link] on user-management
[Link] on users crud and designed
[Link] crud Roles and designed
[Link] city master crud and designed
1. created state master crud
[Link] on service center crud
[Link] the issues of mfscl
compeleted service center crud
and worked on bookappointment page
[Link] -worked on franchies from admin
worked on bookappointment page
worked on bookappointment page
worked on contactus page
completed contact us page
worked on customer register on there services
worked on car-make model
book appointment page is completed
worked on service locator
worked on Periodic Maintenance Service
worked on Running Repair
worked on wheel Car
worked on body repair
worked on Air conditiong system
worked on care car
worked on accessories
worked on service maintence package
worked on wbw
created privacy policy
created terms and codition
worked on service center locator
mapped website
on particular search data displayed in single master page
map displayed through database from js
solved the issues on live site to on gst price with js
solve the issues on report of franchies
resolved the issues on valuepass page
resolved the issues on DSA_lp page
due jquery issues redesign partnerwithus page form
created auto calculation feature in partnerwith us page
resolved the valuepass page issues
resolved the service centers issues
partner with us page completed
due to lack of server setup unable to deply carnation website
carnation demo has been done
worked on service centers
server setup of carnation
made script for deployment
worked on carnation changes
worked on value pass transaction
created service center login
made changes on reports
created two blogs
service center sheet created
worked on database changes
mapped service center data into database
worked on exporting reports but facing issues
test transaction on valuepass
partner with us sweetalert content change
redirect on home page after partner with us form submission
on tab link with mfscl url & changed the tab name
In contact us page city field has to be autocomplete
contact us sweetalert content change
download app apple img remove & link app
footer social links
remove footer "deisgned by carnation"
remove next tab from all pages
add state code field
workshop status field remove
remove required from password field
test transaction on valuepass
completed dsa_lps service centers mapping from database
carnation demo done with client
fixed the issues of Variant too & fuel
fixed Road side assistance service changes
worked on valuepass tag manager
worked on bookanappointment page license plat field generated through js
added roadside assistance in offer through js
worked on offers page changes
work on mfscl issues
solve the issues of carnation
Priority (H/M/L) Owner Open Date Target Resolution Closed/ Resolved Resolution
Date Date
Medium suprakash 3/1/2019 3/11/2019 3/11/2019
Medium suprakash 3/1/2019 3/12/2019 3/12/2019
High suprakash 3/4/2019 3/15/2019 3/15/2019
High suprakash 3/5/2019 3/5/2019 3/5/2019
High suprakash 3/6/2019 3/6/2019
High suprakash 3/7/2019 3/7/2019 3/7/2019
3/8/2019
3/8/2019
Holiday
High Bhojraj 3/11/2019 3/11/2019 3/11/2019
High Bhojraj 3/12/2019 3/12/2019 3/12/2019
High Bhojraj 3/12/2019 3/12/2019 3/12/2019
High Bhojraj 13-Mar-19 13-Mar-19 13-Mar-19
High Bhojraj 13-Mar-19 13-Mar-19 13-Mar-19
High Bhojraj 14-Mar-19 14-Mar-19 14-Mar-19
High 0 15-Mar-19 15-Mar-19 15-Mar-19
High Bhojraj 18-Mar-19 12-Feb-19
High Bhojraj
19-Mar-19 22-Jan-19
High Bhojraj
20-Mar-19 22-Jan-19
High Bhojraj 12-Feb-19
22-Mar-19
bhojraj 25-Mar-19
bhojraj 26-Mar-19
bhojraj 27-Mar-19
bhojraj 28-Mar-19
bhojraj 29-Mar-19
Holiday
High bhojraj 1-Apr-19
High bhojraj 1-Apr-19
High bhojraj 2-Apr-19
High bhojraj 2-Apr-19
High bhojraj 3-Apr-19
High bhojraj 3-Apr-19
High bhojraj 3-Apr-19
High bhojraj 4-Apr-19
High bhojraj 4-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 5-Apr-19
High bhojraj 6-Apr-19
High bhojraj 6-Apr-19
High bhojraj 6-Apr-19
High bhojraj 6-Apr-19
High
High bhojraj 9-Apr-19
High bhojraj 9-Apr-19
High bhojraj 9-Apr-19
High bhojraj 9-Apr-19
High
High bhojraj 10-Apr-19
High bhojraj 10-Apr-19
High bhojraj 10-Apr-19
High bhojraj 9-Apr-19
High bhojraj 11-Apr-19
High bhojraj 11-Apr-19
High bhojraj 11-Apr-19
High bhojraj 11-Apr-19
High bhojraj 15-Apr-19
High bhojraj 12-Apr-19
High bhojraj 12-Apr-19
High bhojraj 12-Apr-19
High bhojraj 12-Apr-19
High bhojraj 12-Apr-19
High bhojraj 15-Apr-19
High
High bhojraj 15/04/2019
High bhojraj 15/04/2019
High bhojraj 15/04/2019
15/04/2019
High
bhojraj
High bhojraj 15/04/2019
High
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
High bhojraj 4/16/2019 4/16/2019
Updates/ Notes / Level 1: Project Level 2: M&M Level 3: Project
Document link Manager Operations Head Management
3