BOQ Perimeter Fence at Angono Rizal

This document is a bill of quantities (BOQ) for a project to rectify a perimeter fence. It includes 6 items of work: general requirements, structural footing, stiffener columns, tie beams, lintel beams, and masonry works. For each item, it lists the scope description, unit, quantity, and total labor cost. The total project cost and discounted price are not provided. The document provides a breakdown of the labor-only costs for the materials, equipment, and tasks needed to complete the fence rectification.

Uploaded by

JohnPaulLaggui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
606 views1 page

BOQ Perimeter Fence at Angono Rizal

This document is a bill of quantities (BOQ) for a project to rectify a perimeter fence. It includes 6 items of work: general requirements, structural footing, stiffener columns, tie beams, lintel beams, and masonry works. For each item, it lists the scope description, unit, quantity, and total labor cost. The total project cost and discounted price are not provided. The document provides a breakdown of the labor-only costs for the materials, equipment, and tasks needed to complete the fence rectification.

Uploaded by

JohnPaulLaggui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project Title: Rectificaion of Perimeter Fence (CHB LAYING with Pile / Structural Footing, Beam's and Column's)

Location: Masagana Village, Mahabang Parang, Angono Rizal


Date Submitted:

BILL OF QUANTITY ( BOQ ) - LABOR ONLY

Item - TOTAL
SCOPE DESCRIPTION / ITEM OF WORK'S UNIT QTY AMOUNT
No. LABOR COST
I General Requirement's
1. Mobilization / Demobilization 1.00 lot -
2. Worker's Protection (Raincoat / Construction Boot's) 1.00 lot -
3. Other's (Please Specify) _________________________________ 1.00 lot -

Sub total for General Requirements -

II Structural Footing
1. Installation of 3" dia. G.I. Pipe include's Concrete Filling - Manual
12.00 pcs. -
Pile Driving
2. Reinforcement of Concrete Footing using 12mm Dia. RSB on
6.00 unit's -
20cm sp. Bw
3. Concrete Work's for Footing - Assume Manual Concrete Mixing 6.00 unit's -
Sub total for Item No. II -

III Stiffener Column


1. Installation of Reinforcement's (include's Tie's and Main Vertical
6.00 unit's -
Bar's)
2. Installation of Formwork's - reusable 6.00 unit's -
3. Concrete Work's for Stiffener Column - Assume Manual Concrete
6.00 unit's -
Mixing
Sub total for Item No. III -

IV Tie Beam
1. Installation of Reinforcement's (include's Stirrup's and Main
21.00 meter's -
Horizontal Bar's)
2. Installation of Formwork's - Bothsides 21.00 meter's -

21.00 meter's -
3. Concrete Work's for Tie Beam - Assume Manual Concrete Mixing
Sub total for Item No. IV -

V Lintel Beam
1. Installation of Reinforcement's (include's Stirrup's and Main
21.00 meter's -
Horizontal Bar's)
2. Installation of Formwork's - reusable 21.00 meter's -
3. Concrete Work's for Lintel Beam - Assume Manual Concrete
21.00 meter's -
Mixing
Sub total for Item No. V -

VI Masonry Work's
1. CHB Laying using 6" chb (include's reinforcement's vertical and
horizontal) - to include installation of 2" PVC pipe as weep holes 71.40 sq.m -
before the lintel beam only
2. No Plastering Required
Sub total for Item No. VI -

Geneneral Reqequirement's and Labor Cost -


Project Supervision and Profit
GRAND TOTAL FOR PROJECT COST -

DISCOUNTED PRICE / LAST PRICE

Full Name and Signature of BIDDER :

Complete Present Address:

Provincial Address:

RIMAR RM CONSTRUCTION AND BUILDER'S CORPORATION Email Address : [email protected]