Nagarjuna Construction Company Limited: Design Calculations For Sludge Handling System
Nagarjuna Construction Company Limited: Design Calculations For Sludge Handling System
b Sludge Thickner
Average Flow 39000 cu.m/day.
Specific gravity of Solids 1.12
solids concentration 320.00 mg/l
Waste sludge concentration 13977.60 Kg/day
Solids loading Rate 60.00 kg/Sq.m.day
Area Required for sludge thickener 232.96 Sq.m
Dia. of sludge Thickner 17.30 m
Say Diameter of Sludge thickner 17.50 m
Side water depth 3.00 m
Free Board 0.50 m
Overall Size of Sludge Thickener 17.5 m Dia x 3 m SWD
1 of 26
5m x 3m x 4.5m Ht
f Thickener Feed / sludge recycle Pump House
g MCC & Blower Room 12m x 15m x 5m Ht
2 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM I T E D
Design Calculations for Chlorine Contact Tank
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
3 of 26
Chlorine Contact Tank
Average Flow 1625.00 m3/Hr
No. of Units 1.00 No's
Detention Time adopted 30 min
Volume of tank 812.50 Cum
Side water depth 3.00 m
Area of tank 270.83 sqm
Width of tank 5.00 m
Length of Tank 55.00 m
Chlorination Room
Average Flow 1625.00 m3/Hr
Chlorine Dosing 5.00 mg/l
Chlorinator Capacity 10.00 Kg/hr
Vacuum Type Chlorinators 2.00 Nos (1 W + 1 S)
No. of Chlorine tonners 4.00 Nos.
Chlorine Room Size 6m x 4m x 4.5m Ht.
Chlorine Tonner Yard 6m x 4.5m Ht.
4 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM I T E D
Design Calculations for Secondary Clarifier
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
Secondary Clarifier
No. of Units 2 No's
Total flow from 2 no. aeration tanks to 1625.00 m3/Hr
clarifier
Flow (Q) in each unit 812.50 m3/Hr
Return sludge rate 325.00 m3/Hr
Total flow from aeration to clarifier 1137.50 m3/Hr
Detention Time adopted 2.00 hr
Overflow rate 12.00 m3/m2.d
Volume of each clarifier 2275.00
Side water depth 3.50 m
Area of tank 650.00 m2
Diameter 29.00 m
Say Diameter of Clarifier 34.00 m
Free board 0.50 m
Weir Leangth 106.81 m
Weir Loading Rate 255.58 m /day/m
3
5 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T I O N C O M P A N Y L I M I T E D
Design Calculations for Air Blower for Diffused Aeration System
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
wRT 1 p2
0.283
P 1
(8.41)e p1
9 Aeration Tanks
Average Flow 39.00 MLD
No. of Units 2.00 No's
Flow (Q) in each unit 19.50 MLD
19500.00 m3/d
BOD - at inlet So 112.50 mg/l
Suspended solids - at inlet 175.00 mg/l
Influent sewage characteristics:
Xt (MLSS) 4000 mg/l
F/M 0.16
La Influent BOD5 at 200 c
112.50 mg/l
Volume of the tank
F/M = Q x La/Vx(Xt)
V 3364.00 m3
depth of Tank 4.00 m
plan area required 841.00 m2
L/B 1.00
B2 841.00 m2
B 29.00 m
L 29.00 m
FB 0.50 m
Dimensions of Aeration Tank 29m x 29 m x 4 m 2 No's
SWD
BOD applied per day for each Aeration tank 2925.00 Kg/day
Volume of Aeration Tank 3364.00 m3
Volumetric Loading Rate 0.87 Kg/m3
Sludge Recirculation:
SVI 60.00 assumed
Return Sludge Rate 513.16 m /Hr
3
8 of 26
Sludge Recirculation Pumping Capacity 12316.00 m3/day
Hydraulic Retention Time 4.20 Hrs
Total Weight of solids in Aeration Tank 13456.00 Kg
Quantity of sludge taken out from the
system 351.00 m3/day
Waste sludge concentration 4500.00 mg/l
Solids in Excess Sludge 1579.50 Kg/day
solids in Treated Water 195.00 Kg/day
Total weight of solids leaving the system
1774.50 Kg/day
Sludge Retention Time 8.00 Days
9 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM I T E D
Design Calculations for Distribution Chamber
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
Distribution Chamber
Design Peak Flow 1950.00 m3/hr
Detention time 1.05 min
Volume of chamber 31.00 Cum
Side Water depth 3.70 m
Surface area of chamber 8.38 Sq.m
Length of the chamber 1.65 m
Width of the chamber 5.10 m
Free Board 0.30 m
Size of chamber 1.65m x 5.1 m x 3.7 m SWD + 0.3 m F.B.
10 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L I M IT E D
Design Calculations for Flow Measurement Channel
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
11 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L I M IT E D
Design Calculations for Degritting tank
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
Degritting Tank
Design Peak flow 3656.25 m3/hr
Size of Grit particles 0.15 mm
Specific Gravity of Grit 2.50
Minimum Temperature 15.00 Deg.C
Settling Velocity 0.02 m/sec
measure of settling basin performance 0.13
Efficiency of grit chamber 0.75 Assumed
Surface Overflow Rate 895.03 m3/m2/day
Dimensions of Grit Chamber
Plan Area of Chamber 98.04 Sq.m
No. of Grit Chambers 1.00 No.
Side of Grit chamber 10.00 m
Critical displacement velocity 0.15 m/sec
Horizontal velocity of flow should be kept less than critical displacement velocity
12 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L I M IT E D
Design Calculations for Fine Screen Channel
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
13 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Design Calculations for Raw Sewage Pumping Station
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
14 of 26
Doc No. NCC-EDTD-EE-DS-STP-01-07 Date:23 FEB 2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L I M IT E D
Design Calculations for Coarse Screen
S.No. Description Size Remarks
Pumping Hours 24 Hrs
Average Flow 39 MLD
1625.0 m3/hr
Over load 20%
Average Flow with overload 46.80 MLD
1950.0 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
BOD - at inlet So 250 mg/l
Suspended solids - at inlet 350 mg/l
Final outlet BOD5 10 mg/l
Final outlet SS 10 mg/l
15 of 26
O & M FOR 39MLD Cap. SEWAGE TREATMENT PLANT
Water supply and Underground Sewerage System for
Multimodal International Hub Airport At Nagpur (MIHAN)
Man Power
No of Total Total Salary/ 12
S No Details of Man power Qualification Salary/Month
Persons Salary/Month Months
1 Project Manger 1 BE Mechanical 20000 20000 240000
2 Process Engineer 1 BE 10000 10000 120000
3 Chemist 1 BSC 8000 8000 96000
4 Analyst /Lab Asst 2 BSC 5000 10000 120000
5 M & E Engineer 1 BE 7500 7500 90000
6 Electrician 1 ITI 6000 6000 72000
7 Fitters Mechanical 1 ITI 4000 4000 48000
8 Operator 12 Non Technical 3000 36000 432000
9 Security persons 3 Non Technical 2500 7500 90000
10 Gardener 2 Non Technical 2500 5000 60000
11 Peon 2 Non Technical 2500 5000 60000
12 Screening/Grit Collector 1 Non Technical 2500 2500 30000
Grand Total Summary for Twelve Months 121500 1458000
Consumables
Qty/12 Months
S No Description Unit Qty/day Rate Total
in Tons
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
2 Raw sewage sump (Wet well) 20.4m dia x 3 m SWD + 0.5 m F.B. 1 No.
3 Raw sewage Pumping station (Dry well) 10m dia x 4m Ht 1No.
17 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
18 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
19 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
3 Inlet Chamber
Average Flow 1625.00 m3/hr
Peak factor 2.25
Design Peak Flow 3656.25 m3/hr
Detention time 1.00 min
Volume of chamber 61.00 Cum
Side Water depth 3.00 m
Surface area of chamber 20.33 Sq.m
Side of the chamber 4.50 m
Free Board 0.60 m
Size of inlet chamber 4.5m Sq x 3 m SWD + 0.6 m F.B.
5 Degritting Tank
Design Peak flow 3656.25 m3/hr
Size of Grit particles 0.15 mm
Specific Gravity of Grit 2.50
Minimum Temperature 15.00 Deg.C
20 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
7 Distribution Chamber
Design Peak Flow 1950.00 m3/hr
Detention time 1.05 min
Volume of chamber 31.00 Cum
Side Water depth 3.70 m
Surface area of chamber 8.38 Sq.m
Length of the chamber 1.65 m
Width of the chamber 5.10 m
Free Board 0.30 m
21 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
22 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
9 Aeration Tanks
Average Flow 39.00 MLD
No. of Units 2.00 No's
Flow (Q) in each unit 19.50 MLD
19500.00 m3/d
BOD - at inlet So 112.50 mg/l
Suspended solids - at inlet 175.00 mg/l
Influent sewage characteristics:
Xt (MLSS) 4000 mg/l
F/M 0.16
La Influent BOD5 at 200 c
112.50 mg/l
Volume of the tank
F/M = Q x La/Vx(Xt)
V 3364.00 m3
depth of Tank 4.00 m
plan area required 841.00 m2
L/B 1.00
B2 841.00 m2
B 29.00 m
L 29.00 m
FB 0.50 m
Dimensions of Aeration Tank 29m x 29 m x 4 m 2 No's
SWD
BOD applied per day for each Aeration tank 2925.00 Kg/day
Volume of Aeration Tank 3364.00 m3
Volumetric Loading Rate 0.87 Kg/m3
Sludge Recirculation:
SVI 60.00 assumed
Return Sludge Rate 513.16 m /Hr
3
23 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
11 Secondary Clarifier
No. of Units 2 No's
Total flow from 2 no. aeration tanks to clarifier 1625.00 m3/Hr
Flow (Q) in each unit 812.50 m3/Hr
Return sludge rate 514.00 m3/Hr
Total flow from aeration to clarifier 1326.50 m3/Hr
Detention Time adopted 2.00 hr
Overflow rate 12.00 m3/m2.d
Volume of each clarifier 2653.00
Side water depth 3.50 m
Area of tank 758.00 m2
Diameter 32.00 m
Say Diameter of Clarifier 34.00 m
Free board 0.50 m
Weir Leangth 106.81 m
Weir Loading Rate 298.05 m /day/m
3
24 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
13 Chlorination Room
Average Flow 1625.00 m3/Hr
Chlorine Dosing 5.00 mg/l
Chlorinator Capacity 10.00 Kg/hr
Vacuum Type Chlorinators 2.00 Nos (1 W + 1 S)
No. of Chlorine tonners 4.00 Nos.
Chlorine Room Size 6m x 4m x 4.5m Ht.
Chlorine Tonner Yard 6m x 4.5m Ht.
15 Sludge Thickner
Average Flow 39000 cu.m/day.
Specific gravity of Solids 1.12
solids concentration 320.00 mg/l
Waste sludge concentration 13977.60 Kg/day
Solids loading Rate 60.00 kg/Sq.m.day
Area Required for sludge thickener 232.96 Sq.m
Dia. of sludge Thickner 17.30 m
Say Diameter of Sludge thickner 17.50 m
Side water depth 3.00 m
25 of 26
Doc No.MIHAN-STP-01-06 Rev. 0 Dt.12-02-2007
N A G A R JU N A C O N S T R U C T IO N C O M P A N Y L IM IT E D
Water supply and Underground Sewerage System for Multimodal International Hub Airport
At Nagpur (MIHAN)
26 of 26