Sample quotation on 30MW Condensing Steam Turbine Gensets.
1. Technical data and supply scope
1.1 Main technical parameters of the steam turbine:
Installation Indoor
Model of Steam turbine N30
Quantity 1 set
Rated Power
Rated Revolution 3000rpm
Rated Inlet Pres. 6.47 MPa
Rated Inlet Tempt. 490Degree C
Layout manner Double arrangement
1.2 Main technical parameters of the generator:
Rated power
Rated speed 3000 rpm
Frequency 50Hz
Excitation style Brushless
Cooling type CACW
Rated voltage 11KV
Power factor 0.8
Insulation class F
1.3 Scope of supply of steam turbine:
One set of components for a steam turbine unit, including:
Emergency stop valve along with integral filter;
Steam turbine proper, front and rear pedestal supports, cover, coupling;
Water strainer;
AC & DC Gear oil pump, electrical motor driven pump, jacking oil pump;
Oil strainer, oil tank, oil cooler;
Gland Sealing Condenser (GSC);
flash tank;
surge tank;
All steam, drain water and oil pipelines within the supply scope;
Woodward 505 Digital electric-hydraulic governor (no panel);
Bently for generator
Condenser(cooled by water)
One set of valves for all the pipelines within the supply scope;
One set of local instruments within the turbine supply scope;
motors for the above pumps,
Spare parts;
Special tools;
Four sets of technical drawings and documents .
1.4 General explanation of the constructions:
Our turbine unit is of impulse type. The casing is of horizontal split type, the
steam chest is an integral part of the inlet casing, and steam enters the steam
chest from both sides of the steam chests. The rotor is forged type, and the LP
stage is built up; The bearings of the turbine are composed of two oval rear
bearing and a front bearing, which are comprised of one tilting pads thrust
bearing at the front and one oval journal bearings for support of the rotor of the
turbine.
1.5 Scope of supply of generator
Generator Assembly
Excitation system and control device (AVR)
Air cooler
Special tools
Spare parts
Drawings and documentation
1.6 Adopted standard and code:
IEC-45 For steam turbine;
IEC-34 For turbo-generator
2. EXCLUSIONS
THE FOLLOWING ARE NOT CONSIDERED IN SCOPE OF THE SUPPLY BY
SUPPLIER:
All civil foundations (Load data to be provided by supplier)
Building, structure and other civil work.
EOT cranes & Hoist
Designing of piping lay-out & its civil foundation.
Main steam piping from boiler to flange of ESV.
CEP pumps,
Deaerator.
LP heater;
HP heaters;
Water piping, steam piping and their valves and elbows except the ones
in the scope stipulated in the items 1.3 and 1.5.
Turbine heat insulation (Technical documentation to be provided by
supplier only for reference)
Generator protection system & panels, CT, PT & distribution
transformers. Neutral grounding systems, Circuit Breakers, Bus bar &
coupler, MCC surge protection panel.
Power Distribution System, Illumination & Telecommunication.
Re-circulation Pump House, DM water plant
Microprocessor / PLC based control system for the CPP.
Instrumental and thermal control system for the turbine and generator and
other equipment of power plant.
Fire Fighting and Protection System.
Air conditioning and Ventilation System
Cooling Tower and Pumps
LT, HT cables, control cables and cable accessories.
Consumable, Chemicals & First fill of Lub. Oil
Lub. oil centrifuge
DC power & battery & charger
Erection & commissioning
3. TERMINAL POINTS ( BATTERY LIMITS )
3.1 Mechanical
Main Steam: At the inlet of the emergency stop valve of the turbine with
counter flanges.
Bleed steam: At the flange of bleed outlet of turbine with counter flanges
Extraction steam: At the flange of extraction outlet
3.2 Electrical
HT Power: At the out let of the Generator.
AC: At the junction box of motors.
UPS Power: To be provided by customer at one point inside the TG house.
3.3 Instrumentation
Instruments : Complete field instruments as detailed in the supply scope.
4. Price
Price for one set of the above shall be CFR India
Port�?/SPAN>CHENNAI�?/SPAN> USD2,068,000
4.1�?/SPAN>Payment
--10% of the total contract price shall be paid as down payment by the customer
by means of telegraphic transfer, within 10 days after signing the contract against
10% Bank Guarantee.
--30% of the total contract price shall be paid by the customer by means of
telegraphic transfer, within 15 days after receiving the basic designing drawings.
--The payment of the rest 60% of total contract price shall be made by an
acceptable irrevocable confirmed and unconditional Letter of Credit at sight in
favor of the Seller within 200 days after signed the contract.
5. Delivery time
The delivery time will be 12 months after received the down payment.
6. After-sale service
For this project, we shall send about three technical specialists to the working site
for supervision of erection and commissioning of the unit, one or two for steam
turbine, and one for generator. The buyer should bear the expense of the above
said experts�?international traffic fee, room and board, communication and
medical insurance. Moreover, the buyer also needs to pay USD200.00/person.day
to these experts as allowance.
7. Validity
2 months (60 days)
8. Packing
All contract goods are packed in solid sea-worthy wood cases.