EQUIPMENT / MACHINERY CHECKLIST School Name Blank (Highlight this cell & insert school name)
Equipmen Make/Model & Edquip No
MILLING MACHINE - VERTICAL Blank (Highlight this cell & insert brand & Edquip No)
t
Location/Room Blank (Highlight & insert Room) HOD / Teacher in Charge Blank (Highlight this cell & insert name) Year Blank
Website link to this document: [Link]
MAINTENANCE RECORD – EQUIPMENT / MACHINERY
Date Regular servicing as per Maintenance Checklist / Major or Minor repairs Maintenance performed by Time Cost Tag-out (If Tag Removed
Company / Business / Individual Taken Required) & Checked by
WH&S legislation - Plant Code of Practice 2005 outlines that workers (staff members) and others (students, maintenance contractors)
using plant / equipment should be trained and provided with information and instruction on :
o safe work practices and operating procedures
o maintenance procedures
Acknowledgement: Much of the information for this document has been sourced from content kindly provided by Department of Education & Children’s Services SA website:
Machine Guarding - Maintenance Schedules.
EQUIPMENT / MACHINERY CHECKLIST School Name Blank (Highlight this cell & insert school name)
Equipmen Make/Model & Edquip No
MILLING MACHINE - VERTICAL Blank (Highlight this cell & insert brand & Edquip No)
t
Location/Room Blank (Highlight & insert Room) HOD / Teacher in Charge Blank (Highlight this cell & insert name) Year Blank
Website link to this document: [Link]
The below checks are recommended for equipment prior to or during a unit of work where the equipment will undergo moderate to heavy use.
Date
Follow-up
/ / / / Actions
RANDOM EQUIPMENT CHECKS Signature
Tick or comment Tick or comment Tick or comment Tick or comment Eg. Cracked blade replaced 03/10
John Smith
Visual check of mains Electrical Switches, Wiring and/or Conduit (Cracks, broken controls
etc.) Arrange for immediate repair of any faults
Verify all Guards are secure and function correctly (Check latches, locks, fasteners and/or
interlocks)
Ensure workspaces and walk-ways are clear and unobstructed and that no slip-hazards are
present
Confirm availability and condition of Personal Protective Equipment
Conduct close inspection for damage to Switch Gear Test operation of Switch Gear
(Proper function of switch controls)
Lubricate lightly according to manufacturer’s specification
Check availability of specific tools for this machine. (spanners, Allen keys, drifts, soft head
hammers etc.)
Check condition of suds (coolant) and pump operation
Check floor space for oil contamination (Coolant spilt on floor should be absorbed with
suitable material immediately)
Lubricate lightly according to manufacturer’s specification
Other:
Other:
Other:
Other:
Other:
Acknowledgement: Much of the information for this document has been sourced from content kindly provided by Department of Education & Children’s Services SA website:
Machine Guarding - Maintenance Schedules.
EQUIPMENT / MACHINERY CHECKLIST School Name Blank (Highlight this cell & insert school name)
Equipmen Make/Model & Edquip No
MILLING MACHINE - VERTICAL Blank (Highlight this cell & insert brand & Edquip No)
t
Location/Room Blank (Highlight & insert Room) HOD / Teacher in Charge Blank (Highlight this cell & insert name) Year Blank
Website link to this document: [Link]
Date / Follow-up
END OF SEMESTER /
Date
Signature Actions ANNUAL CHECK /
CHECKS Tick or comment Tick or comment Eg. Blade & pulley alignment Signature
adjusted 02/10 Tick or comment
Sem 1 Sem 2 John Smith
Check the availability of spare parts i.e. cutters, blades, mops, Check condition of 50mm line markings defining Operator Zones
wheels etc. and Access Walkways
Lubricate all points in accordance with the manufacturer's Review Safety Operating Procedure and update if necessary
specification
Clean out “T” slots in table & all fines, grit, swarf and waste from Other:
inside and around housings, cabinets etc (Isolate the machine)
Check position and operation of table feed stops and stops on Other:
other slides
Other:
Replace suds (coolant) totally and dispose according to Material
Safety Data Sheet (MSDS)
Other:
Protect all bare metal surfaces before Term Shutdown
(CRC, WD40, RP7 of similar) Other:
Check pulleys for Correct Alignment & Check security of all
eg. Yellow line for operator zone repainted
Fixed Guards (Back Gear covers etc) Follow-up Actions
14/12 John Smith
Check gear train/s (back gears etc.) for correct mesh and
alignment - Adjust if necessary
Examine drive belts for Flaws & Correct Tension - Adjust if
necessary
Inspect Morse Taper Sleeves for burrs / scratches. Remove raised
metal with an appropriate reamer (internal) or slipstone (external).
Adjust gib strips on all slides to manufacturers specification
Examine bolts used for mounting the motor to the machine. Re-
tighten if necessary
Check the security of Machine Mountings to the floor or base
block
Acknowledgement: Much of the information for this document has been sourced from content kindly provided by Department of Education & Children’s Services SA website:
Machine Guarding - Maintenance Schedules.