HAZOP Neautralization Reactor

This document summarizes a Hazard and Operability Study (HAZOP) for Reactor R-102 in a bioethanol production process. It identifies 4 key process parameters - flow, temperature, level, and agitation. For each parameter, possible deviations, causes, and consequences are described along with recommended actions. The goal is to identify any safety or process issues that could occur in the neutralization reactor and recommend solutions.

Uploaded by

Issyahira Ernie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views4 pages

HAZOP Neautralization Reactor

This document summarizes a Hazard and Operability Study (HAZOP) for Reactor R-102 in a bioethanol production process. It identifies 4 key process parameters - flow, temperature, level, and agitation. For each parameter, possible deviations, causes, and consequences are described along with recommended actions. The goal is to identify any safety or process issues that could occur in the neutralization reactor and recommend solutions.

Uploaded by

Issyahira Ernie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Table 8.

13: HAZOP for Reactor R-102

Project Name: Production of 10000 Metric Tonnes Date: 05/05/2020 Page: 2 of 6 Assigned to: Safety,
of Bioethanol Health and Environment
Department
Process: Neutralization of hydrolysate from Sulphuric acid by using Calcium Hydroxide
Section: R-102 Prepared by: Mohamad Afie bin Rosman
Item Study Node Process Deviation Possible Causes Possible Consequences Action Require
Parameter
1. Continuous Flow No  Inlet line rupture  Neutralization not  Periodic
  Stirred Tank  Fail to open the occur (high content maintenance of
Reactor control valve of sulphuric acid) control valves
(CSTR), system  Blast and rupture of  Visual inspection
Neutralizer R-  Blockage happen in pipeline may occur of pipelines
102 the piping system
   Low  Plugging and  Neutralization take  Installation of
broken pipe longer time to alarm or indicator
 Blockage happen complete for flow in the
in the piping  Outlet pipeline
system concentration of  Periodic
 Control valve Sulphuric acid maintenance of
system for higher control valves
reactants flow not  Visual inspection
working properly of pipeline
High  Control valve  Loss of reactant due  Installation of
system for to overflow alarm or indicator
reactants flow not  Increase of reactor for temperature in
working properly temperature the pipeline
 Ineffective  Periodic
neutralization maintenance of
process control valves
 Blast and rupture of  Visual inspection
the reactor may of pipeline
happen
 2.  Continuous  Temperatur  Low  Excessive removal  Reduce reaction  Installation of
  Stirred Tank e of heat due to low rate hence reaction alarm or indicator
Reactor   flow of steam for take longer time for temperature in
(CSTR), the reactor  Not able to achieve the reactor
Neutralizer R-  Control valve desired reaction  Increase steam
102 system for the temperature flow to the
  steam flow not  Ineffective reactor’s heating
working properly neutralization system
process  Periodic
maintenance of
control valves
 High  Excessive  Increase of reactor  Installation of
introduction of temperature alarm or indicator
heat due to high  Ineffective for temperature in
flow of steam for neutralization the reactor
the reactor process  Decrease steam
 Control valve  Blast and rupture of flow to the
system for the the reactor may reactor’s heating
steam flow not happen system
working properly  Periodic
maintenance of
control valves
 3.  Continuous  Level  Low  Control valve  Ineffective  Installation of
  Stirred Tank   system for neutralization alarm or indicator
Reactor reactants flow not process for level in the
(CSTR), working properly  Increase the reactor reactor
Neutralizer R-  Blockage may temperature  Periodic
102 happen in the  Quality of product maintenance of
  pipeline reduced control valves
 Leakage of the  Visual inspection
piping system of pipeline
 High  Control valve  Reactant and  Installation of
system for product losses alarm or indicator
reactants flow not  Reaction for level in the
working properly temperature not reactor
 Outlet pipeline achieved  Periodic
clogged  Product quality not maintenance of
achieved control valves
 Visual inspection
of pipeline
 4.  Continuous  Agitation  No  Agitator motor  Slow reaction rate  Motor to be
  Stirred Tank   mixing failure  Product quality not checked
  Reactor    Shaft seal failure achieved periodically
(CSTR),  Proper lubrication
Neutralizer R- of motor
102  Slow  Corrosion of the  Proper mixing does  Proper

  mixing impeller not happen maintenance of

   Wear or tear on the  Product quality not motor


agitator motor achieved  Proper lubrication
 Gear, belt or shaft of motor
damage
 More  Gear failure  Impeller runs in  Proper inspection
mixing high rpm and maintenance

You might also like