Safe Questions Undafe

The document contains 10 multiple choice questions about Lean-Agile principles and SAFe. It tests understanding of topics like feedback loops, version control, decentralized decision making, assumptions of variability, queue lengths, program visions, definitions of done, strategic themes, implementing epics over multiple program increments, and solution backlogs.

Uploaded by

jk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views2 pages

Safe Questions Undafe

The document contains 10 multiple choice questions about Lean-Agile principles and SAFe. It tests understanding of topics like feedback loops, version control, decentralized decision making, assumptions of variability, queue lengths, program visions, definitions of done, strategic themes, implementing epics over multiple program increments, and solution backlogs.

Uploaded by

jk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

1. What is the connection between feedback and optimum batch size? A.

Lack of feedback
contributes to higher holding cost B. Feedback and batch size are generally not connected
C. Small batch sizes enable faster feedback with lower transaction costs D. Large batches
reduce transaction cost and provide a higher return on investment 2. What is one key
reason for keeping the test data for automated tests under version control? A. For
reporting and auditing purposes B. Version control is required for quality standards C.
All enterprise assets must be under version control D. If test data gets out of sync,
automated tests may not properly execute 3. What is the primary goal of decentralized
decision-making? A. Reduce Cost of Delay B. Resolve dependencies C. Enable faster
flow of value D. Increase alignment 4. What does SAFe® Principle #3, "Assume
variability; preserve options," enable? A. Better economic results B. Specification
traceability C. Up front design of systems D. Stronger Definition of Done 5. What is a
result of shorter queue lengths? A. Lower quality B. Increased risk C. Less variability D.
Longer cycle times 6. Which statement is most accurate about the Program Vision? A. It
expresses the strategic intent of the Program B. It drives the allocation of budget for the
Agile Release Train C. It summarizes the team PI Objectives for the current Program
Increment D. It provides an outline of the Features for the next three Program Increments
Continued… 7. What Definition of Done is required for the Iteration Review? A. Release
B. Team Increment C. System Increment D. Solution Increment 8. What is the primary
purpose of Strategic Themes? A. Determine the order in which Epics should be executed
B. Drive incremental implementation across the enterprise C. Connect the portfolio to the
enterprise business strategy D. Define the sequence of steps used to deliver value to the
customer 9. An Epic spanning two PIs was approved for implementation. What is the
optimum implementation path from a Lean-Agile perspective? A. Implement the Epic
across the same number of PIs as it took to develop B. Report the percentage completed
to the key stakeholders at every PI boundary C. Demonstrate the progress to the key
stakeholders after two PIs and have them accept the epic D. Demonstrate the progress to
key stakeholders after first PI and make a decision how to proceed with the Epic in the
second PI 10. What backlog items are part of the Solution Backlog? A. Benefits B.
Features C. Capabilities D. User Stories

2. outline of the Features for the next three Program Increments Continued… 7. What
Definition of Done is required for the Iteration Review? A. Release B. Team Increment
C. System Increment D. Solution Increment 8. What is the primary purpose of Strategic
Themes? A. Determine the order in which Epics should be executed B. Drive incremental
implementation across the enterprise C. Connect the portfolio to the enterprise business
strategy D. Define the sequence of steps used to deliver value to the customer 9. An Epic
spanning two PIs was approved for implementation. What is the optimum
implementation path from a Lean-Agile perspective? A. Implement the Epic across the
same number of PIs as it took to develop B. Report the percentage completed to the key
stakeholders at every PI boundary C. Demonstrate the progress to the key stakeholders
after two PIs and have them accept the epic D. Demonstrate the progress to key
stakeholders after first PI and make a decision how to proceed with the Epic in the second
PI 10. What backlog items are part of the Solution Backlog? A. Benefits B. Features C.
Capabilities D. User Stories
1. C 2. D 3. C 4. A 5. C 6. A 7. B 8. C 9. D 10. C