NFI for Chemical Dosing Packages

Uploaded by

arip.yuwono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views2 pages

NFI for Chemical Dosing Packages

Uploaded by

arip.yuwono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

TANGGUH EXPANSION – PROJECT EXECUTE

LNG EPC

NOTIFICATION FOR INSPECTION (NFI) Page


1 of 2
Notification for Inspection No.: NFI-1201883-0035 R1
(NFI Submission Date: 11-Dec-2019)

E-Mail to: Mr. Doni Djajadi <[Link]@[Link]>


Att. to: Mr. Pasaribu Rio Martin <[Link]@[Link]>

Project Name: TEP


PO Number: 1201883

REQ Number: 870310-PTS-900-MEC-REQ-52503

REQ Description: REQUISITION FOR CHEMICAL DOSING PACKAGES

Supplier Name: LEWA NIKKISO SINGAPORE PTE LTD

PO Line Number: 2

Equipment / Material No.: (see Note Chemical Dosing Package


1)
Kind of Test: (See Note 2) FAT DEMULSIFIER (017-V-31303)

ITP Document Number: 870310-S-1201883-MEC-H03-0001

ITP Step Number: FAT

CSTS/COMPANY/PJIT/MIGAS Witness Hold


Intervention
Inspection Date and Time: (see Note 23 & 24 DEC 2019 (10.00am Morning)
3)
Duration of Test: Till complete

Test Location Address: KM6.5 (Exs Marina City) 29423, Jl. Brigjen Katamso,
Tanjung Uncang, Batu Aji, Batam City, Riau Islans
29425, Indonesia
Manufacturer Name: LEWA & PT Angkasa
Person in Charge: CK Leow (LEWA) & Ricky (PT Angkasa) & Visal (PT
Angkasa)
Telephone Number: Tel: +65 8774 3349 & +62 823-8454-3693 & +62 823-8409-
7830

E-mail Address: [Link]@[Link]


Ricky@[Link]
visal@[Link]

Note For piping / instrument / electrical bulk material, attach the list of equipment / material subject
1: to test.
Note Inspection subject to be detailed (hydrostatic test, air leak test, routine test, and so on).
2:
TANGGUH EXPANSION – PROJECT EXECUTE
LNG EPC

NOTIFICATION FOR INSPECTION (NFI) Page


2 of 2
Notification for Inspection No.: NFI-1201883-0035 R1
(NFI Submission Date: 11-Dec-2019)

Note All the applicable documents duly stamped by CSTS (code A or B) to be ready for inspection
3: as well as the relevant inspection and test certificates/records/reports to be ready for review.

NFI shall be submitted to CSTS in advance as follows.


7 calendar days (Indonesia)
CSTS/COMPANY/PJIT
14 calendar days (other than Indonesia)
14 calendar days (Indonesia)
MIGAS
40 calendar days (other than Indonesia)