0% found this document useful (0 votes)
187 views1 page

BIM Clash Detection Report

This document provides project details for ABC including linked Navis and Revit files. It contains information on clashes detected on 1/24/2018 between a trap door and condensate drainage including the clash name, location, descriptions of the clashing items, item IDs, item types, layers, names, images before and after clash removal, clash point, and assigned contacts and comments.

Uploaded by

Shahrukh Ansari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
187 views1 page

BIM Clash Detection Report

This document provides project details for ABC including linked Navis and Revit files. It contains information on clashes detected on 1/24/2018 between a trap door and condensate drainage including the clash name, location, descriptions of the clashing items, item IDs, item types, layers, names, images before and after clash removal, clash point, and assigned contacts and comments.

Uploaded by

Shahrukh Ansari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Project Detail ABC

Navis file KLM.nwc


123_Arch.nwc
Linked Revit Model 456_Mechancal.nwc
789_Plumbing.nwc
101112_Electrical.nwc
131415_Fire Protection.nwc
Date 1/24/2018
Item1 Item2
Clash Name Grid Location Description Item ID Item /Family Item Type Item ID Layer Item Name IMAGE BEFORE CLASH IMAGE AFTER CLASH Clash Point Assigned To Comments
S. no Name REMOVAL REMOVAL
Comments
Element Element x:582257.437,
TRAP DOOR TRAP DOOR Condensate Name of from
1 Clash-1 1-J & 2-F HARD/CLEARANCE ID: Solid ID: y:2368961.806,
1650x1650 1650x1650 Drainage Modeler Engineer/Super
2843464 2854998 z:284.350
visor

You might also like