0% found this document useful (0 votes)
119 views1 page

Campus Building Functional Areas List

The document appears to be a list of building areas with details on their functions, components, and new conditions. It includes entries for multiple rooms across different levels and areas of a building. Each entry specifies the building reference, level, room, function area name, component group, component name, and new condition. The components listed include things like internal doors, locks, floors, walls, lighting and more. The document provides a detailed inventory of building areas, components, and their new conditions.

Uploaded by

Jogendra Mahat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views1 page

Campus Building Functional Areas List

The document appears to be a list of building areas with details on their functions, components, and new conditions. It includes entries for multiple rooms across different levels and areas of a building. Each entry specifies the building reference, level, room, function area name, component group, component name, and new condition. The components listed include things like internal doors, locks, floors, walls, lighting and more. The document provides a detailed inventory of building areas, components, and their new conditions.

Uploaded by

Jogendra Mahat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

FareaTyp_Fun CmpMst_Co

BldFArea_FuncAr Camp cAreaTypeNa CmpGb_GroupN CmpTyp_Compo mponentNa New


eaName us Building Level Room me ame nentName me Condition
Internal Doors
BR.516.01.007 BR 516 01 007 Workshops Superstructure Locks Swipe Card
Internal Doors
BR.516.01.007 BR 516 01 007 Workshops Superstructure Locks Swipe Card
BR.516.01.011 BR 516 01 011 Workshops Finishes Internal - Walls Paint
BR.516.01.011 BR 516 01 011 Workshops Finishes Internal - Walls Paint
BR.512.01.002 BR 512 01 002 Office Finishes Internal - Floor Carpet
BR.512.01.002 BR 512 01 002 Office Finishes Internal - Floor Carpet
Desk/Workst
BR.512.01.002 BR 512 01 002 Office Fittings Furniture ation
Desk/Workst
BR.512.01.002 BR 512 01 002 Office Fittings Furniture ation
Open
BR.512.01.001B- 001B- Support/Open
000 BR 512 01 000 Plan Office Finishes Internal - Floor Carpet
Open
BR.512.01.001B- 001B- Support/Open
000 BR 512 01 000 Plan Office Finishes Internal - Floor Carpet
Teaching
Support /
BR.512.01.001 BR 512 01 001 Preparation Finishes Internal - Floor Vinyl
Teaching
Support /
BR.512.01.001 BR 512 01 001 Preparation Finishes Internal - Floor Vinyl
Internal Doors
BR.514.02.007 BR 514 02 007 Prayer Rooms Superstructure Locks Lock
Internal Doors
BR.514.02.007 BR 514 02 007 Prayer Rooms Superstructure Locks Lock
General Lighting(LED
BR.515.02.019 BR 515 02 019 Lab - Other Fittings Fitments )
General Lighting(LED
BR.515.02.019 BR 515 02 019 Lab - Other Fittings Fitments )
Internal Doors
BR.511.03.101 BR 511 03 101 Cleaners Store Superstructure Locks Lock
Internal Doors
BR.511.03.101 BR 511 03 101 Cleaners Store Superstructure Locks Lock

You might also like