Electrical Power Systems Commissioning

This document outlines the commissioning process for electrical power systems. Chapter 1 provides project details like the owner and commissioning provider. Chapter 2 lists specific electrical equipment and systems that may require commissioning. Chapters 3-5 cover additional testing areas. Appendix B contains a signature block for approving the commissioning plan.

Uploaded by

Humaid Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
309 views1 page

Electrical Power Systems Commissioning

This document outlines the commissioning process for electrical power systems. Chapter 1 provides project details like the owner and commissioning provider. Chapter 2 lists specific electrical equipment and systems that may require commissioning. Chapters 3-5 cover additional testing areas. Appendix B contains a signature block for approving the commissioning plan.

Uploaded by

Humaid Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Electrical Power Systems Commissioning

Electrical Power Systems Commissioning

Chapter 1

Project: _____________________________________________ Address: ________________________________


Owner: _____________________________________________ Email/Phone: _____________________________
Owner’s Project Manager: ______________________________ Email/Phone: _____________________________
Cx Provider: _________________________________________ Email/Phone: _____________________________
Date Initiated: ______________________ Date Revised: ______________________
System Integrated System
Chapter 2

Commissioning
Commissioning Commissioning
Item Equipment/System Complete—
Required— Required—
Date
Y/N Y/N
1. Power feeders and conduit systems
2. Panel and switchboard installation
Chapter 3

3. Grounding systems
4. Uninterruptible power supply systems and
load banking
5. Emergency generator and systems
6. Infrared testing
Chapter 4

7. Voltage drop and power quality


8. Power switching calculations and timing
setting
Chapter 5
Appendix B
Appendix B

The approval section that follows can be used if applicable to the planning process. Approval can be granted by the
Owner/representative, Design Team, or CxP depending on the Owner’s requirements.

I have reviewed the required items and plans and verified that they meet the project requirements:
Appendix B

Owner or Owner’s Representative Name: ___________________________________________________________


Company Name: ______________________________________________________________________________
Signature: _____________________________________________ Date: _________________________________