Electrical Power Systems Commissioning
Chapter 1
Project: _____________________________________________ Address: ________________________________
Owner: _____________________________________________ Email/Phone: _____________________________
Owner’s Project Manager: ______________________________ Email/Phone: _____________________________
Cx Provider: _________________________________________ Email/Phone: _____________________________
Date Initiated: ______________________ Date Revised: ______________________
System Integrated System
Chapter 2
Commissioning
Commissioning Commissioning
Item Equipment/System Complete—
Required— Required—
Date
Y/N Y/N
1. Power feeders and conduit systems
2. Panel and switchboard installation
Chapter 3
3. Grounding systems
4. Uninterruptible power supply systems and
load banking
5. Emergency generator and systems
6. Infrared testing
Chapter 4
7. Voltage drop and power quality
8. Power switching calculations and timing
setting
Chapter 5
Appendix B
Appendix B
The approval section that follows can be used if applicable to the planning process. Approval can be granted by the
Owner/representative, Design Team, or CxP depending on the Owner’s requirements.
I have reviewed the required items and plans and verified that they meet the project requirements:
Appendix B
Owner or Owner’s Representative Name: ___________________________________________________________
Company Name: ______________________________________________________________________________
Signature: _____________________________________________ Date: _________________________________