0 ratings0% found this document useful (0 votes) 321 views5 pagesEil Qap-2012
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
ox
(QUALITY ASSURANCE PLAN. AZ
©. Suppuee ms pr castncs evr. LmaTeD i rem:
CUSTOMER ENERCONINDALTD. f eau
GAPNO REV:PCRLIGRP 802 Date
3) oncipion | ype oa ae [ante
SB] pest category | ela erecta scptinceNoms) Red
| |
imensions | Measurement 1 bagel al
> ° = ‘casting Org,
+ | ta Eqipmen
een we] ve sao
| isa ae
nee son
2 | rwmans ( “ oe.
sews a ert sptoace
eiarg
Aspaciae [Sample zeae} ee |
uw | este Pal emane | or
FI |
| 7
3 M Visual Each mould QA-080 10d0e
As pae2cPL
ae
AAs perinepecten j
Verdor Procedure se
Type cas Por |
fossa Rani Rpt
~ haresDescription
Exentot
rtentot | eterence Document
Acceptance Norms
Recors
Inspection by
vendor] a, | Ee
atime casing. Spee
tote selected by 38
party Erereon
scneasing |mkcoz cor ra VOC
Lab report
va ater ano : Freetomtonay | Peston oman | tnzecton a
[plasting) oe defect defect ‘report
carina iersion
‘iene
ing repe
10% | respect rigs |" Saag | om Resor wr
Telemre pe
eerie
cst esrer moan | Weve toacnave | EN 15592655: Jory ena
|required) Each batch lane requred propartes | 400-reuLt [YT 4
oes ‘As casi
enteson bet som | sinwotearieg | sintering | em
sine
en reas encason
ever onesetote aur ales be erat ant
onees seer | er sormie ‘een
person Jc pcren| 23g epstmion =
scm at loro sn oncinesyecoa Ge oa OS Lap pot oR
[ine asta seb at
Fa tc once —_
Rivne and approved by
Fea
Haven [Cra] if 4,
[ecast-1
[hasan Sawa bas —Ravyi
_Appraved by ENERCON =
DateT
s De raracteristi oie) Mater ment | Acceptance Norms | Record Inspection | i ‘Frequency
] emerson | chances [camry [Ma] St eco bacmet pc | macnn | Rie | rman
pe a
feelers bees | el rent vornse| @ | w fal on
:
eee
7
foe per aos
oe eee coins | ast rrrwe | | | x [open
rear
ares
pes Sreardae
IC fevers [tomar]
L — Ee
= Date: a&
at a
S| oescroton | charactsses | ate |e tatnod record | Inspectionby | Responsible | Frequency
| xa] EE
vendor
rary | OR
¢ ineacnpat | Drang orang | soeeion |p | w [we] an |eecncasing
preaing&ne ata] Oren
le sutaceriien | c |Sutececinsh Drawing inscerton |p | wo |wir] aa Jesencastng
sor Ube incase
esingsce otro | cu | Maint | oh gapi Rt OF Noreeet|| || w [we|| os | Peeommoey
6 | moennea —[Soenense Sie ers
fz noraer sutace werra [Hl Proceaue aa 7 as
fenoruerurace | | Mtepw [ansia | om resorane |iycssse5| wrineon | ep | w [win] Ore er ee a Scoce
lec owe | Seope vee pees
ssa inapcton Tina Lamp in sc Foe
Fro fom Fourety
Fos Fourary Sactnes | aman id
[reac romty | c |avatte Drie mecctrecc | Veuliessrarans [O8eas0ens5an | weecion | p | w |wr| aa |eeencasing
ote é oan i. Se
se Sekage 2. i
ertace | Coste
c Eacheastng | macoooaas | Clearedsutece | incpecton | Pp | wo |wrR}| GA [Each Casing
ipecton | epee
lanes, et
7 | SiStng ad
Pang
Teo 044, 00
mie i conieg
c | wom | wow [pS CORMOE, | asserensnm | wegen |p | w fw] ar leoncatra
Fan cond, Report
Prepaed by Reviewed and approve by: ‘Approved by ENERCON INDIA
Yes
- Awe
I Pareunltunen) oe f eal _
i ‘Date: TS TAXA fous Das fagitt ByDescription
7
coer Notes
Pant Nmber 10)
|
|
|
|
|
[saming by oe
ty
~ Approved by ENERCON INDIA,