0% found this document useful (0 votes)
1K views1 page

Single Line Diagram for UPS and MSB

This single line diagram shows the electrical connections between Panel MDP, Panel MSB New, Panel SDP-UPS, and various pieces of equipment. Panel MSB New receives power from Panel MDP and distributes it to Panel DB Utility, Panel MSB Lt.3, and three PAC units. Panel SDP-UPS receives power from UPS1 and distributes it to two PDU panels. The diagram identifies the MCCBs connecting each panel and load.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Single Line Diagram for UPS and MSB

This single line diagram shows the electrical connections between Panel MDP, Panel MSB New, Panel SDP-UPS, and various pieces of equipment. Panel MSB New receives power from Panel MDP and distributes it to Panel DB Utility, Panel MSB Lt.3, and three PAC units. Panel SDP-UPS receives power from UPS1 and distributes it to two PDU panels. The diagram identifies the MCCBs connecting each panel and load.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Single Line Diagram

Note :

SINGLE LINE DIAGRAM MCCB1 : From P. MDP


PANEL MSB NEW & PANEL SDP-UPS MCCB2 : To P. DB UTILITY
MCCB3 : To P.MSB Lt.3
MCCB4 : To PAC Vertiv 2
P.MSB NEW P.SDP-UPS MCCB5 : To PAC Climaveneta
From MCCB6 : To PACV ertiv 1
Panel MDP MCCB7 : INCOMING UPS1
R MCCB8 : To UPS1
S MCCB9 : Bypass Maintenance
T MCCB10 : Outgoing UPS1
N MCCB11 : To P.PDU A
MCCB12 : To P.PDU B
MCCB1 MCCB7
Lampu Indikator Panel
FROM MDP 160A
Power Meter INCOMING UPS 1 Note :
400A
MCCB4 MCCB5 MCCB6 PAC Vertiv 1 dekat pintu masuk
R SURGE 100A 100A 100A PAC Vertive 2 dekat Rak Net
S PROTECTOR To PAC 1 To PAC 2 TO PAC 3 Lampu Indikator Panel SDP-UPS
T
N
3P Cable
Power Meter P.SDP-UPS

MCCB8 MCCB9
MCCB2 MCCB3 100A 100A
100A 160A UPS 1 TO UPS 1 Bypass Maintenance
TO DB- TO MSB (LEGRAND)
UTILITY Lt.3

R S T N R S T N

MCCB10
100A
Out UPS 1

MCCB11 MCCB12
100A 100A
Project :
SINGLE LINE DIAGRAM
To P. PDU A To P. PDU B Drawing name :

PANEL MSB NEW & PANEL SDP-UPS

Vendor :
PT.PARIRAYA DINAMIKA

Drawing date : 18 Oktober 2020