September 16

The document contains schedules for several concrete pouring teams over multiple dates. It lists details such as client name, quantity of slabs, type of slab, projected start and end times of pouring, and travel times between sites. On September 1st, team Michel poured slabs for clients in Balaclava, G Bai, and Triolet. On September 2nd, teams Dolizer, Ravi and Michel poured slabs for various clients. On September 3rd, team Michel poured slabs in Wooton, Rose Belle, Ebene and Pailles. The schedules provide timelines for pouring concrete at different project sites.

Uploaded by

NidDou
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views50 pages

September 16

The document contains schedules for several concrete pouring teams over multiple dates. It lists details such as client name, quantity of slabs, type of slab, projected start and end times of pouring, and travel times between sites. On September 1st, team Michel poured slabs for clients in Balaclava, G Bai, and Triolet. On September 2nd, teams Dolizer, Ravi and Michel poured slabs for various clients. On September 3rd, team Michel poured slabs in Wooton, Rose Belle, Ebene and Pailles. The schedules provide timelines for pouring concrete at different project sites.

Uploaded by

NidDou
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Date: 9/1/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

BALACLAVA 48.1 FLAT + BASE 7:30 7:30 10:42 10:57 10:57 0:30

G BAIE 25.0 FLAT 11:27 11:42 11:27 11:42 11:42 12:57 13:12 13:12 0:16

G BAIE 34.7 FLAT 13:28 13:43 13:28 13:43 13:43 15:28 15:43 15:43 0:15

TRIOLET 27.0 FLAT + PITCH 15:58 16:13 15:58 16:13 16:13 18:01 18:01 18:01 0:00

END 18:01

134.8 OK

Time Pump to Yard 18:46

Time Water Truck to Yard 19:01


Date: 9/2/2016 Team: DOLIZER

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Time Site Pump Set Casting Casting Pump Out Team Out Travel
Address

MTE LONGUE 12.0 FLAT 7:30 7:30 8:06 8:21 8:21 0:15
MTE LONGUE 32.0 FLAT 8:36 8:51 8:36 8:51 8:51 10:11 10:26 10:26 0:15
DEPINAY 26.8 FLAT 10:41 10:56 10:41 10:56 10:56 12:05 12:20 12:20 0:30
ROCHE BOIS 15.5 FLOOR 12:50 13:05 12:50 13:05 13:05 13:52 14:07 14:07 0:15
TRANQUEBAR 12.2 FLAT 14:22 14:37 14:22 14:37 14:37 15:13 15:28 15:28 0:30
MONT ROCHES 18.7 FLAT 15:58 16:13 15:58 16:13 16:13 17:09 17:24 17:24 0:15
B BASSIN 12.2 FLAT 17:39 17:54 17:39 17:54 17:54 18:31 18:31 18:31 0:00
END 18:31
129.4 OK

Time Pump to Yard 18:55

Time Water Truck to Yard 19:10

Date: 9/2/2016 Team: RAVI

Time Frame

Team :
Projected Time
Client Name QTY SLAB Time on Casting Start Time In Time Start Time End Time Time Time
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

Q BORNES 54.0 FLAT 7:30 7:30 9:45 10:00 10:00 0:19

VACOAS 9.0 FLAT 10:19 10:34 10:19 10:34 10:34 11:06 11:21 11:21 0:19

EBENE 10.0 WALL + COLUMN 11:40 11:55 11:40 11:55 11:55 12:55 13:10 13:10 0:19

R HILL 7.0 FLAT 13:30 13:45 13:30 13:45 13:45 14:09 14:24 14:24 0:19

MOKA 45.0 FLAT + ^ 14:44 14:59 14:44 14:59 14:59 17:59 17:59 17:59 0:00

END 17:59

125 OK

Time Pump to Yard 18:32

Time Water Truck to Yard 18:47

Date: 9/2/2016 Team: MICHEL

Time Frame

Team : Projected Time


Client Name QTY SLAB Time on Casting Start Time In Time Start Time End Time Time Time
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

M CHOISY 21.5 FLAT 7:30 7:30 8:25 8:40 8:40 0:15


G BAIE 17.5 FLAT 8:55 9:10 8:55 9:10 9:10 10:03 10:18 10:18 0:15
TRIOLET 19.3 FLAT 10:33 10:48 10:33 10:48 10:48 11:46 12:01 12:01 0:15
ILLOT 27.5 FLAT 12:16 12:31 12:16 12:31 12:31 13:42 13:57 13:57 0:24
REMPART 7.0 FLAT 14:21 14:36 14:21 14:36 14:36 14:59 15:14 15:14 0:34
BEL AIR 22.5 BAS + FLO 15:49 16:04 15:49 16:04 16:04 17:02 17:17 17:17 0:15
FLACQ 14.4 FLAT 17:32 17:47 17:32 17:47 17:47 18:31 18:31 18:31 0:00
END 18:31
129.7 OK
Time Pump to Yard 19:41

Time Water Truck to Yard 19:56


Date: 9/3/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time Time Time
Client Name QTY SLAB Casting Start Start Time End Casting
Site Site Pump Set Pump Out Team Out Travel
Address Time Casting

WOOTON 7.0 FLA + PITCH 7:30 7:30 8:02 8:17 8:17 0:30
ROSE BELLE 51.0 OTHERS 8:47 9:02 8:47 9:02 9:02 12:21 12:36 12:36 0:37
EBENE 17.5 BASES 13:14 13:29 13:14 13:29 13:29 14:20 14:35 14:35 0:16
PAILLES 60.0 OTHERS 14:51 15:06 14:51 15:06 15:06 18:36 18:36 18:36 0:00
END 18:36
135.5 OK
Time Pump to Yard 19:02

Time Water Truck to Yard 19:17


Date: 9/7/2016

Team :
Client Name QTY
Address
Q BORNES
PAILLES
Q BORNES

Date: 9/7/2016

Team :
Client Name QTY
Address
TRIOLET
BALACLAVA
PEREYBERE
B BASSIN

Date: 9/7/2016

Team :
Client Name QTY
Address
BELVEDERE
Q BORNES

0
Team: DOLIZER

Time Frame
Projected
SLAB Time on Casting Start
Site Time
7:30
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
END #DIV/0!
###

Team: RAVI

Time Frame
Time on Projected
SLAB Site Casting Start
Time
7:30
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
END #DIV/0!
###

Team: MICHEL

Time Frame
Projected
Time on
SLAB Casting Start
Site Time

#DIV/0! #DIV/0!
END #REF!
#REF!
OLIZER

Time
Time In Time Start Time End Time Time
Site Pump Set Casting Casting Pump Out Team Out
7:30 7:30 #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Time Pump to Yard #DIV/0!


Time Water Truck to Yard #DIV/0!

RAVI

Time In Time Time Time End Time Time


Site Pump Set Start Casting Pump Out Team Out
Casting
7:30 7:30 #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Time Pump to Yard #DIV/0!


Time Water Truck to Yard #DIV/0!

MICHEL

Time
Time In Time Time End Time Time
Start
Site Pump Set Casting Casting Pump Out Team Out
0:00 0:00 #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Time Pump to Yard #DIV/0!


Time Water Truck to Yard #DIV/0!
Travelling Time - Projected
Travel
Time Time / Travel /
Travel min min/m3
0:18 18.9 #DIV/0!
0:18 18.9 #DIV/0!
0:00

37.8 #DIV/0!

Distance from Last Site to Yard

Travelling Time - Projected


Time Travel Travel /
Travel Time / min/m3
min
0:09 9 #DIV/0!
0:22 22.5 #DIV/0!
0:55 55.5 #DIV/0!
0:00

87 #DIV/0!

Distance from Last Site to Yard

Travelling Time - Projected


Travel
Time Travel /
Time /
Travel min min/m3
0:42 42 #DIV/0!
0:00

42 #DIV/0!

Distance from Last Site to Yard


Time - Projected Speed Projected Speed
Distance / Speed / Casting Travelling
Km Km per h
12.60 40.00 #DIV/0!
12.60 40.00 #DIV/0!

25.2 40.0 #DIV/0! #DIV/0!

16.7 40.0

Time - Projected Speed Projected Speed


Distance / Speed /
Km Km per h Casting Travelling

6.00 40.00 #DIV/0!


15.00 40.00 #DIV/0!
37.00 40.00 #DIV/0!

58.0 40.0 #DIV/0! #DIV/0!

6.0 40.0

Time - Projected Speed Projected Speed


Distance / Speed /
Casting Travelling
Km Km per h
28.00 40.00 #DIV/0!

28.0 40.0 #DIV/0! #DIV/0!

14.5 40.0
ojected Speed

Set Up Overall

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.0

#DIV/0! #DIV/0!
#DIV/0!

ojected Speed

Set Up Overall

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.0

#DIV/0! #DIV/0!
#DIV/0!

ojected Speed

Set Up Overall

#DIV/0! #DIV/0!
0.0

#DIV/0! #DIV/0!
#DIV/0!
Date: 9/8/2016 Team: DOLIZER

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Time Site Pump Set Casting Casting Pump Out Team Out Travel
Address

P VERTE 19.0 FLAT 7:30 7:30 8:25 8:40 8:40 0:15

CALEBASSES 29.0 FLAT 8:55 9:10 8:55 9:10 9:10 10:25 10:40 10:40 0:30

G BAIE 19.0 FLAT 11:10 11:25 11:10 11:25 11:25 12:20 12:35 12:35 0:10

G BAIE 17.0 POOL 12:46 13:01 12:46 13:01 13:01 13:50 14:05 14:05 0:15

T A BICHES 17.5 FLAT 14:20 14:35 14:20 14:35 14:35 15:26 15:41 15:41 0:15

G BAIE 17.5 FLAT 15:56 16:11 15:56 16:11 16:11 17:01 17:16 17:16 0:10

PTE RAFFRAY 25.0 BASE 17:27 17:42 17:27 17:42 17:42 18:47 18:47 18:47 0:00

END 18:47

144 OK

Time Pump to Yard 19:44

Time Water Truck to Yard 19:59

Date: 9/8/2016 Team: RAVI

Time Frame

Team : Projected Time


Client Name QTY SLAB Time on Time In Time Time End Time Time Time
Site Casting Start Site Pump Set Start Casting Pump Out Team Out Travel
Address Time Casting

B BASSIN 58.5 FLAT 7:30 7:30 9:32 9:47 9:47 0:15

PHOENIX 48.0 FLAT 10:02 10:17 10:02 10:17 10:17 12:08 12:23 12:23 0:43
M TABAC 26.0 FLAT 13:06 13:21 13:06 13:21 13:21 14:29 14:44 14:44 0:22
F SIDE 12.6 FLAT 15:06 15:21 15:06 15:21 15:21 15:58 16:13 16:13 0:16
CASTEL 8.2 FLAT 16:29 16:44 16:29 16:44 16:44 17:11 17:11 17:11 0:00

END 17:11
153.3 OK

Time Pump to Yard 17:53

Time Water Truck to Yard 18:08

Date: 9/8/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

ANAHITA 32.5 OTHERS 7:30 7:30 8:44 8:59 8:59 1:07

LESCALIER 15.5 BLIND 10:07 10:22 10:07 10:22 10:22 11:32 11:47 11:47 0:19

LA FLORA 20.0 FLAT+PITCH 12:06 12:21 12:06 12:21 12:21 13:31 13:46 13:46 0:16

ROSE BELLE 16.5 OTHERS 14:03 14:18 14:03 14:18 14:18 15:52 16:07 16:07 0:10

GROS BOIS 21.0 BASES 16:17 16:32 16:17 16:32 16:32 17:27 17:42 17:42 0:21

MAHEBOURG 15.0 BASES 18:03 18:18 18:03 18:18 18:18 19:01 19:01 19:01 0:00

END 19:01

120.5 OK

Time Pump to Yard 20:31

Time Water Truck to Yard 20:46


Date: 9/9/2016 Team: DOLIZER

Time Frame

Team : Projected
Client Name QTY SLAB Time on Casting Start Time In Time Time Start Casting Time End Time Time Time
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time

VACOAS 20.0 FLAT 7:30 7:30 8:22 8:37 8:37 0:15

VACOAS 24.0 FLAT + PITCH 8:52 9:07 8:52 9:07 9:07 10:31 10:46 10:46 0:15

R HILL 10.0 BLIND 11:01 11:16 11:01 11:16 11:16 12:01 12:16 12:16 0:15

EBENE 19.0 FLAT + COL 12:31 12:46 12:31 12:46 12:46 13:58 14:13 14:13 0:15

COROMANDEL 15.0 FLAT 14:28 14:43 14:28 14:43 14:43 15:26 15:41 15:41 0:15

ALBION 17.0 FLOOR 15:56 16:11 15:56 16:11 16:11 17:01 17:16 17:16 0:15

P A SABLES 15.7 OTHERS 17:31 17:46 17:31 17:46 17:46 18:31 18:31 18:31 0:00

END 18:31

120.7 OK

Time Pump to Yard 18:52

Time Water Truck to Yard 19:07

Date: 9/9/2016 Team: RAVI

Time Frame
Team : Time on Projected Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Time Start Casting
Address Site Time Site Pump Set Casting Pump Out Team Out Travel

EBENE 40.5 FLAT 7:30 7:30 8:59 9:14 9:14 0:28


RICHE TERRE 120.0 FLAT 9:42 9:57 9:42 9:57 9:57 15:57 16:12 16:12 0:24
F DU SAC 11.5 FLAT 16:37 16:52 16:37 16:52 16:52 17:28 17:28 17:28 0:00
END 17:28
172 OK
Time Pump to Yard 18:26

Time Water Truck to Yard 18:41

Date: 9/9/2016 Team: MICHEL

Time Frame

Team : Projected
Client Name QTY SLAB Time on Time In Time Time Start Casting Time End Time Time Time
Site Casting Start Site Pump Set Casting Pump Out Team Out Travel
Address Time

SEBASTOPOL 16.0 BASES 8:00 8:00 8:46 9:01 9:01 0:19

MONT IDA 31.9 FLAT 9:20 9:35 9:20 9:35 9:35 10:49 11:04 11:04 0:19

FLACQ 20.0 FLAT 11:23 11:38 11:23 11:38 11:38 12:30 12:45 12:45 0:12

BEL AIR 10.8 FLAT 12:57 13:12 12:57 13:12 13:12 13:44 13:59 13:59 0:18

Q COCOS 31.2 FLAT 14:17 14:32 14:17 14:32 14:32 15:43 15:58 15:58 0:15

FLACQ 8.0 FLAT 16:13 16:28 16:13 16:28 16:28 16:55 17:10 17:10 0:15

FLACQ 19.0 FLAT 17:25 17:40 17:25 17:40 17:40 18:35 18:35 18:35 0:00

END 18:35

136.9 OK

Time Pump to Yard 19:45

Time Water Truck to Yard 20:00


Date: 9/10/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

MOKA 70.3 FLAT+PITCH 7:30 7:30 11:43 11:58 11:58 0:19

PHOENIX 30.7 FLAT 12:17 12:32 12:17 12:32 12:32 14:04 14:19 14:19 0:15

VACOAS 59.0 FLAT 14:34 14:49 14:34 14:49 14:49 17:17 17:17 17:17 0:00

END 17:17

160 OK

Time Pump to Yard 17:59

Time Water Truck to Yard 18:14


Date: 9/11/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

CHEMIN GRENIER 25.5 FLAT 7:30 7:30 8:36 8:51 8:51 0:12

BEL OMBRE 25.0 FLAT 9:04 9:19 9:04 9:19 9:19 10:24 10:39 10:39 0:15

RIAMBEL 13.0 FLAT+PIT 10:54 11:09 10:54 11:09 11:09 11:54 12:09 12:09 0:57

B VALLON 9.5 BASES+POOL 13:06 13:21 13:06 13:21 13:21 13:52 14:07 14:07 0:25

UNION PARK 8.5 FLAT 14:33 14:48 14:33 14:48 14:48 15:16 15:31 15:31 0:39

Q BORNES 12.5 FLAT 16:10 16:25 16:10 16:25 16:25 17:01 17:01 17:01 0:00

END 17:01

94 OK

Time Pump to Yard 17:46

Time Water Truck to Yard 18:01


Date: 9/15/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

G GAUBE 21.8 FLAT 7:30 7:30 8:35 8:50 8:50 0:15

G GAUBE 17.0 FLAT 9:05 9:20 9:05 9:20 9:20 10:19 10:34 10:34 0:15

C MALHEUREUX 15.5 FLAT 10:49 11:04 10:49 11:04 11:04 11:59 12:14 12:14 0:15

DARUTTY 15.0 FLAT 12:29 12:44 12:29 12:44 12:44 13:29 13:44 13:44 0:19

MONT GOUT 18.7 FLAT 14:03 14:18 14:03 14:18 14:18 15:14 15:29 15:29 0:22

G BAIE 17.0 FLAT 15:52 16:07 15:52 16:07 16:07 16:58 17:13 17:13 0:15

PEREYBER 7.0 FLAT 17:28 17:43 17:28 17:43 17:43 18:06 18:06 18:06 0:00

END 18:06

112 OK

Time Pump to Yard 18:51

Time Water Truck to Yard 19:06


Date: 9/16/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Time Site Pump Set Casting Casting Pump Out Team Out Travel
Address

GRAND PORT 10.0 FLAT 7:30 7:30 8:00 8:15 8:15 0:27

ROSE BELLE 9.0 BASES 8:42 8:57 8:42 8:57 8:57 9:29 9:44 9:44 0:33

VACOAS 28.0 FLAT 10:17 10:32 10:17 10:32 10:32 11:56 12:11 12:11 0:15

R HILL 28.5 BASES 12:26 12:41 12:26 12:41 12:41 14:06 14:21 14:21 0:15

Q BORNES 11.8 FLAT 14:36 14:51 14:36 14:51 14:51 15:27 15:42 15:42 0:15

VACOAS 19.0 FLAT 15:57 16:12 15:57 16:12 16:12 17:09 17:09 17:09 0:00

END 17:09

106.3 OK

Time Pump to Yard 17:51

Time Water Truck to Yard 18:06


Date: 9/17/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

BELLE MARE 7.0 FLAT 7:30 7:30 7:53 8:08 8:08 0:15

FLACQ 20.0 FLAT 8:23 8:38 8:23 8:38 8:38 9:30 9:45 9:45 0:53

Q BORNES 14.7 FLOOR 10:38 10:53 10:38 10:53 10:53 11:36 11:51 11:51 0:15

Q BORNES 17.0 FLAT 12:06 12:21 12:06 12:21 12:21 13:10 13:25 13:25 0:28

PLAINE VERTE 7.0 FLAT 13:53 14:08 13:53 14:08 14:08 14:32 14:47 14:47 0:15

V D PRETES 26.0 FLAT 15:02 15:17 15:02 15:17 15:17 16:24 16:39 16:39 0:15

RICHE TERRE 15.0 FLAT 16:54 17:09 16:54 17:09 17:09 17:53 17:53 17:53 0:00

END 17:53

106.7 OK

Time Pump to Yard 18:21

Time Water Truck to Yard 18:36


Date: 9/19/2016 Team: MICHEL

Time Frame
Team : Projected Time
Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Address Site Site Pump Set Casting Pump Out Team Out Travel
Time Casting
P D ROCHES 60.0 FLOOR 7:30 7:30 11:00 11:15 11:15 0:45
GOODLANDS 23.0 FLAT 12:00 12:15 12:00 12:15 12:15 13:24 13:39 13:39 0:37
G BAIE 39.0 FLAT 14:16 14:31 14:16 14:31 14:31 16:28 16:28 16:28 0:00
END 16:28
122 OK
Time Pump to Yard 17:33

Time Water Truck to Yard 17:48


Date: 9/20/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

STE CROIX 12.6 FLAT 7:30 7:30 8:06 8:21 8:21 0:15

MTE LONGUE 10.0 PITCH 8:36 8:51 8:36 8:51 8:51 9:26 9:41 9:41 0:37

CALODYNE 20.0 FLAT 10:19 10:34 10:19 10:34 10:34 11:26 11:41 11:41 0:25

T A BICHES 23.0 FLAT 12:06 12:21 12:06 12:21 12:21 13:21 13:36 13:36 0:21

MAPOU 70.0 BEAM+FLAT 13:57 14:12 13:57 14:12 14:12 17:42 17:57 17:57 0:19

ROCHE NOIRE 10.5 FLAT 18:16 18:31 18:16 18:31 18:31 19:02 19:02 19:02 0:00

END 19:02

146.1 OK

Time Pump to Yard 20:09

Time Water Truck to Yard 20:24


Date: 9/21/2016 Team: MICHEL

Time Frame
Team : Projected Time
Client Name QTY SLAB Time on Time In Time Time End Time Time Time
Site Casting Start Site Pump Set Start Casting Pump Out Team Out Travel
Address Time Casting
P LA FAYETTE 44.5 FLAT 7:30 7:30 9:07 9:22 9:22 0:15
ROCHE NOIRE 10.5 FLAT 9:37 9:52 9:37 9:52 9:52 10:23 10:38 10:38 0:30
P LARDIER 19.0 FLAT 11:08 11:23 11:08 11:23 11:23 12:18 12:33 12:33 0:57
EBENE 41.5 WALL+FLOOR 13:30 13:45 13:30 13:45 13:45 16:31 16:46 16:46 0:10
MOKA 19.5 FLAT 16:56 17:11 16:56 17:11 17:11 18:08 18:08 18:08 0:00
END 18:08
135 OK
Time Pump to Yard 18:38

Time Water Truck to Yard 18:53


Date: 9/22/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

ANAHITA 49.0 BASES 8:00 8:00 10:17 10:32 10:32 0:51

G SABLES 9.0 FLAT 11:23 11:38 11:23 11:38 11:38 12:07 12:22 12:22 0:52

PTE DESNY 9.0 FLAT 13:15 13:30 13:15 13:30 13:30 14:00 14:15 14:15 0:15

HERMITAGE 30.0 BASES 14:30 14:45 14:30 14:45 14:45 15:54 16:09 16:09 0:15

ST PAUL 17.3 FLAT 16:24 16:39 16:24 16:39 16:39 17:29 17:44 17:44 0:15

VACOAS 7.0 BASES 17:59 18:14 17:59 18:14 18:14 18:37 18:37 18:37 0:00

END 18:37

121.3 OK

Time Pump to Yard 19:19

Time Water Truck to Yard 19:34


Date: 9/22/2016 Team: MICHEL

Time Frame
Team : Projected Time
Client Name QTY SLAB Time on Casting Start Time In Time Start Time End Time Time Time
Address Site Site Pump Set Casting Pump Out Team Out Travel
Time Casting
ST JULIEN 8.0 FLAT 7:30 7:30 7:56 8:11 8:11 0:15

C D MASQUE 16.2 FLAT 8:26 8:41 8:26 8:41 8:41 9:28 9:43 9:43 0:31

PONT PRASLIN 18.5 FLAT 10:14 10:29 10:14 10:29 10:29 11:23 11:38 11:38 0:19

PAMPLEMOUSSES 20.0 BASES 11:58 12:13 11:58 12:13 12:13 13:05 13:20 13:20 0:13

BALACLAVA 26.0 FLA + WAL+BAS 13:33 13:48 13:33 13:48 13:48 15:58 16:13 16:13 0:15

P A PIMENT 7.0 FLAT 16:28 16:43 16:28 16:43 16:43 17:06 17:21 17:21 0:30

COROMANDEL 17.0 FLAT 17:51 18:06 17:51 18:06 18:06 18:55 18:55 18:55 0:00

END 18:55

112.7 OK
Time Pump to Yard 19:18
Time Water Truck to Yard 19:33
Date: 9/24/2016 Team: MICHEL

Time Frame

Team : Projected Time


Client Name QTY SLAB Time on Time In Time Time End Time Time Time
Casting Start Start
Site Time Site Pump Set Casting Casting Pump Out Team Out Travel
Address

VACOAS 35.0 BASES 7:30 7:30 8:50 9:05 9:05 0:42

LALLMATIE 47.5 FLAT 9:47 10:02 9:47 10:02 10:02 12:44 12:59 12:59 0:18
FLACQ 18.0 FLAT 13:17 13:32 13:17 13:32 13:32 14:24 14:39 14:39 0:36

PAMPLEMOUSSES 20.0 FLAT 15:15 15:30 15:15 15:30 15:30 16:22 16:37 16:37 0:15

MON GOUT 15.0 FLAT 16:52 17:07 16:52 17:07 17:07 17:50 17:50 17:50 0:00
END 17:50

135.5 OK

Time Pump to Yard 18:34

Time Water Truck to Yard 18:49


Date: 9/27/2016 Team: DOLIZER

Time Frame

Team : Projected Time


Client Name QTY SLAB Time on Casting Start Time In Time Start Time End Time Time Time
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

ROSE BELLE 109.0 FLAT 7:30 7:30 12:57 13:12 13:12 0:00

ROSE BELLE 25.0 FLOOR 13:12 13:27 13:12 13:27 13:27 14:42 14:57 14:57 0:00

ROSE BELLE 25.0 FLOOR 14:57 15:12 14:57 15:12 15:12 16:27 16:27 16:27 0:00

END 16:27

159 OK

Time Pump to Yard 17:37

Time Water Truck to Yard 17:52


Date: 9/28/2016 Team: MICHEL

Time Frame

Team : Projected Time


Client Name QTY SLAB Time on Casting Start Time In Time Start Time End Time Time Time
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

MTE BLANCHE 12.5 FLAT 7:30 7:30 8:06 8:21 8:21 0:15

SEBASTOPOL 11.0 BASES 8:36 8:51 8:36 8:51 8:51 9:23 9:38 9:38 0:20

BEL AIR 20.0 FLAT 9:58 10:13 9:58 10:13 10:13 11:05 11:20 11:20 0:15

T D DOUCE 7.5 FLAT 11:35 11:50 11:35 11:50 11:50 12:15 12:30 12:30 0:39

CAMP THOREL 34.0 FLAT 13:09 13:24 13:09 13:24 13:24 14:42 14:57 14:57 0:52

UNION PARK 20.0 BASES 15:49 16:04 15:49 16:04 16:04 16:56 17:11 17:11 0:30

CASTEL 10.0 FLAT 17:41 17:56 17:41 17:56 17:56 18:25 18:25 18:25 0:00

END 18:25

115 OK

Time Pump to Yard 19:03

Time Water Truck to Yard 19:18


Date: 9/29/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

FLACQ 20.5 FLAT 8:00 8:00 8:53 9:08 9:08 1:07

ROSE BELLE 50.0 FLOOR 10:15 10:30 10:15 10:30 10:30 12:20 12:35 12:35 0:15

ROSE BELLE 61.5 FLAT 12:50 13:05 12:50 13:05 13:05 15:21 15:36 15:36 0:15

GROS BOIS 29.0 FLAT+PITCH 15:51 16:06 15:51 16:06 16:06 18:02 18:02 18:02 0:00

END 18:02

161 OK

Time Pump to Yard 19:21

Time Water Truck to Yard 19:36


Date: 9/30/2016 Team: MICHEL

Time Frame

Team : Projected Time


Time on Time In Time Time End Time Time Time
Client Name QTY SLAB Casting Start Start
Site Site Pump Set Casting Pump Out Team Out Travel
Address Time Casting

FLACQ 30.2 FLAT 7:30 7:30 8:39 8:54 8:54 0:52

HERMITAGE 32.5 FLAT 9:46 10:01 9:46 10:01 10:01 11:16 11:31 11:31 0:15

EAU COULEE 7.0 FLAT 11:46 12:01 11:46 12:01 12:01 12:26 12:41 12:41 0:15

CASTEL 10.0 FLAT 12:56 13:11 12:56 13:11 13:11 13:41 13:56 13:56 0:15

LA MARIE 13.0 FLAT 14:11 14:26 14:11 14:26 14:26 15:05 15:20 15:20 0:30

MTE ORY 27.0 FLAT 15:50 16:05 15:50 16:05 16:05 17:15 17:15 17:15 0:00

END 17:15

119.7 OK

Time Pump to Yard 17:40

Time Water Truck to Yard 17:55


Date: 9/1/2016

Team :
Client Name QTY
Address

Date: 9/1/2016

Team :
Client Name QTY
Client Name QTY
Address

Date: 9/1/2016

Team :
Client Name QTY
Address
0
Team: DOLIZER

Time Frame
Projected
SLAB Time on Casting Start
Site Time

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
END #DIV/0!
###

Team: RAVI

Time Frame
Time on Projected
SLAB Site Casting Start
Time on
SLAB Casting Start
Site
Time

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
END #DIV/0!
###

Team: MICHEL

Time Frame
Projected
SLAB Time on Casting Start
Site Time

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
END #DIV/0!
###
OLIZER

Time
Time In Time Start Time End Time Time
Site Pump Set Casting Casting Pump Out Team Out
0:00 0:00 #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Time Pump to Yard #DIV/0!


Time Water Truck to Yard #DIV/0!

RAVI

Time In Time Time Time End Time Time


Site Pump Set Start Casting Pump Out Team Out
Time In Time Time End Time Time
Start
Site Pump Set Casting Pump Out Team Out
Casting
0:00 0:00 #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Time Pump to Yard #DIV/0!


Time Water Truck to Yard #DIV/0!

MICHEL

Time
Time In Time Start Time End Time Time
Site Pump Set Casting Casting Pump Out Team Out
0:00 0:00 #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Time Pump to Yard #DIV/0!
Time Water Truck to Yard #DIV/0!
Travelling Time - Projected
Travel
Time Time / Travel /
Travel min min/m3
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00

0 #DIV/0!

Distance from Last Site to Yard

Travelling Time - Projected


Time Travel Travel /
Travel Time / min/m3
Time Travel /
Time /
Travel min/m3
min
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00

0 #DIV/0!

Distance from Last Site to Yard

Travelling Time - Projected


Travel
Time Time / Travel /
Travel min min/m3
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00 0 #DIV/0!
0:00
0 #DIV/0!

Distance from Last Site to Yard


Time - Projected Speed Projected Speed
Distance / Speed / Casting Travelling
Km Km per h
40.00 #DIV/0!
40.00 #DIV/0!
40.00 #DIV/0!
40.00 #DIV/0!

0.0 40.0 #DIV/0! #DIV/0!

40.0

Time - Projected Speed Projected Speed


Distance / Speed /
Km Km per h Casting Travelling
Distance / Speed /
Casting Travelling
Km Km per h
40.00 #DIV/0!
40.00 #DIV/0!
40.00 #DIV/0!
40.00 #DIV/0!

0.0 40.0 #DIV/0! #DIV/0!

40.0

Time - Projected Speed Projected Speed


Distance / Speed / Casting Travelling
Km Km per h
40.00 #DIV/0!
40.00 #DIV/0!
40.00 #DIV/0!
40.00 #DIV/0!
0.0 40.0 #DIV/0! #DIV/0!

40.0
ojected Speed

Set Up Overall

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.0

#DIV/0! #DIV/0!
#DIV/0!

ojected Speed

Set Up Overall
Set Up Overall

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.0

#DIV/0! #DIV/0!
#DIV/0!

ojected Speed

Set Up Overall

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.0
#DIV/0! #DIV/0!
#DIV/0!