1. Time period for bare MRF buildings without any masonry infills: T= 0.075h 0.
75
When h = 12.34 m ( h in meters excludes basement storeys)
T= 0.49 sec (for RC MRF building)
T= 0.53 sec (for RC-Steel Composite MRF bui
T= 0.56 sec (for Steel MRF building)
Sa/g = 2.0251275 Medium Soil
2. Time period for MRF buildings with RC structural walls: T= 0.075h 0.75 /√Aw >= 0.09h/√d
When h = 12.34 m Awi = Effective c/s area of wall I in first storeybof building, in s
Awi = 2.804 sqm Lwi = Length of structural wall I in first storey in the considere
Lwi = 14.02 m d = base dimension of the building at plinth lvl along consid
d= 17.07 m Nw = number of walls in the considred direction
Nw = 2 Lw/h shall not exceed 0.9.
T= 0.29 sec
3. All other buildings: Time period for MRF with brick infill panel: T= 0.09h/√d
When h = 17.1 m
d= 11.60 m
T= 0.45 sec
For use in response spectrum method - Sa/g = 2.5 Soft Soil
Sa/g = 2.5 Medium Soil
Sa/g = 2.5 Soft Soil
For use in equivalent static method-
Sa/g = 2.5 Medium Soil
When h = 15.25 d= 32.45 T= 0.29 Sa/g = 2.5
When h = 15.25 d= 32.45 T= 0.34 Sa/g = 2.50
1.5DL EQX EQY Spectra-X Spectra-Y DL %LL
40367.27 700.511 700.511 26911.513 2052.1933
40367.27 3085.42 3085.42 0 0 26911.513 2052.1933
33368.58 1075.76 1075.76 793.74 823.57 22245.72 902.54
84133.11 2848.03 2848.03 5789.39 5793.68 40816.85 2995.16
(for RC MRF building)
(for RC-Steel Composite MRF building)
(for Steel MRF building)
all I in first storeybof building, in sqm
all I in first storey in the considered direction
building at plinth lvl along considered direction
considred direction
Soft Soil
Medium Soil
Z I R Sa/g Vx=(Z/2)*(I/R)*(Sa/g)*(DL+%LL) Static,Sx Static,Sy
0.36 1.5 5 2.5 3910.10 5.58 5.58
0.36 1.5 5 2.5 3910.10 1.27 1.27
0.36 1 5 2.5 2083.34 1.937 1.937
0.36 1.5 5 2.5 5914.62 2.077 2.077
Spectra,Sx Spectra,Sy
2.625 2.530
1.022 1.021
1. Time period for bare MRF buildings without any masonry infills: T= 0.075h 0.75
When h = 27.2 m ( h in meters excludes basement storeys)
T= 0.89 sec (for RC MRF building)
T= 1.01 sec (for Steel MRF building)
Sa/g = 1.119469 Medium Soil
2. All other buildings: Time period for MRF with brick infill panel: T= 0.09h/√d
When h = 16.09 m
d= 24.42 m
T= 0.29 sec
Sa/g = 2.5 Soft Soil
Sa/g = 2.5 Medium Soil
1.5DL EQX EQY Spectra-X Spectra-Y DL %LL
46742.3 3818.52 3818.52 31161.533 1545.3
15625.15 1323.03 1322.58 0 0 10416.767 458.43
15625.15 1323.03 1322.58 0 0 10416.767 458.43
(for RC MRF building)
(for Steel MRF building)
Z I R Sa/g Vx=(Z/2)*(I/R)*(Sa/g)*(DL+%LL) Static,Sx Static,Sy
0.36 1.5 5 2.5 4415.42 1.16 1.16
0.36 1.5 5 2.135 1253.80 0.95 0.95
0.36 1.5 5 2.203 1293.74 0.98 0.98
Spectra,Sx Spectra,Sy