LAMPIRAN 1B
(PWD 142A - Rev.2015)
JABATAN PENGAIRAN DAN SALIRAN
PRELIMINARY DETAILED ABSTRACT FOR
HEAD SUBHEAD YEAR TOTAL PROVISION RM
PROVISION FOR CONSTRUCTION RM
BRIEF DESCRIPTION OF BUILDINGS
BUILDING Frame Wall Roof Floor Ceiling Window IBS
BREAKDOWN OF PRELIMINARY COST ESTIMATE COST (RM)
1 PRELIMINARIES
2 PILING/SPECIAL FOUNDATION
Type and Size
a
b
c
3 BUILDING Drawing No. Floor Area m2 Cost/m2
a
b
c
d
e
f
g
h
j
k
4 SERVICES
a Plumbing Installation
b Electrical Installation
c Fire Protection Installation
d Air Conditioning Installation
e Lift & Conveyor Installation
f Communication Installation
g
h
j
k
SUBTOTAL carried forward
1B/1/3
BREAKDOWN OF PRELIMINARY COST ESTIMATE (CONT'D) COST (RM)
SUBTOTAL brought forward
5 EXTERNAL WORKS
a i) Site Preparation
ii) Earthwork
b Roads,Hardstanding,
Footpaths & Paving
c Fencing & Gates
d Turfing & Lanscaping
e Surface Drainage
f Sewerage
g Water Reticulation
h Rain Water Harvesting
i Ancillary Building (eg : Refuse Chamber, Security Post, TNB Sub Statiton, Pump House )
6 PROVISIONAL SUM
a Internal & External Signages
b Built In & Loose Furniture
c Interior Design Work
7 TOTAL COST (1 to 6)
8 GOODS AND SERVICES TAX (GST)
9 TOTAL COST INCLUSIVE GST
10 CONTRIBUTION FEE TO LOCAL & UTILITY AUTHORITY
a Tenaga Nasional Berhad (TNB)
b
c
d
e
11 MISCELLANEOUS (inclusive of GST)
a Advertisement
b Documentation
c Soil Investigation
d Utility Mapping
e Items Supplied/Procured by Client
ALL IN UNIT RATES (of
(ofTotal
Totalitems
Items1 9toto9)11) TOTAL (Items 9 to 11)
Total Floor Area m2 : Cost/m2 :
11 SUPERVISION
12 PROFESSIONAL FEES (inclusive of GST)
a Architect
b Civil & Structural Engineer
c Mechanical Engineer
d Electrical Engineer
e Quantity Surveyor
f
TOTAL COST OF PROJECT
Estimating Officer Division Director / State Director of Works:Branch Director :
Date: Date: Date:
1B/2/3 PDA ms 2/2
NOTES ON FILLING OF PRELIMINARY DETAILED ABSTRACT FORM (PDA)
1.0 GENERAL INFORMATION
1.1 The information given on this Detailed Abstract is for Government use only.
1.2 No portion of the form is to be left blank. Items not applicable in any particular case shall have a dash inserted against them.
If any item is included under 'BUILDING' this shall be stated in the 'COST' column.
2.0 TOTAL PROVISION
2.1 Total Provision shall be the amount approved by the Client Department for the project and shall be stated in the project brief.
If this information is not available it shall be left blank.
3.0 PROVISION FOR CONSTRUCTION
3.1 Provision for Construction shall be the Total Cost of Project as shown. For revised PDA, Provision for Construction shall be the
Total Cost of project in previously approved PDA.
4.0 BRIEF DESCRIPTION OF BUILDINGS
4.1 The following abbreviations shall be used in completing the 'Brief description of Buildings' :
Al - Aluminium CCR - Coloured Cement MT - Mosaic Tiles T - Timber
Rendering
AB - Acoustic Board CHB - Concrete Hollow Bricks MFB - Metal Fibre Board Tyn - Tyrolean
AC - Asbestos Cement Ff - Fairface MFW - Metal Framed Screen Tz - Insitu Terrazo
Wall
BK - Common Brick FSM - Fairface Screen Wall OGB - Ordinary Gypsum Board TB - Timber Boarding
BRF - Built-up Roofing FCB - Fibre Cement Board PF - Plastered finish TS - Timber Strip
Felt
CBk - Cement Sand Brick GMD - Galvanised Metal PCM - Precast Concrete TT - Terazzo Tiles
Decking Members
CR - Cement Rendering GWL - Glass Wool Board Pqt - Parquet TSW - Timber Framed Screen Wall
CSMT - Casement GWT - Glazed Wall Tiles QT - Quarry Tiles VT - Vinyl Tiles
CT - Ceramic Tiles HP - Hyrib Plaster RC - Reinforced Concrete WCB - Wood Cement Board
Con - Concrete LV - Louvre RGB - Reinforced Gypsum Board WCR - Waterproof Cement Rendering
Co.T - Concrete Tiles MS - Mosaic Slab St. - Steel
Both the base material and the finish shall be given in the case of floors, walls and flat roofs, thus :
Con./VT RC/WCR
Both the base material or the type of suspension/framing and the finish shall be given in the case of ceiling, thus :
T/WCB Al./MFB
5.0 PILING/SPECIAL FOUNDATION
5.1 Each type and size of Piling/Special Faoundation and its cost shall be stated separately
6.0 BUILDING
6.1 The cost for the building shall be exclusive of all services.
6.2 The buildings to be listed under item 3 shall refer to the same buildings as listed under 'Brief Description of buildings'.
6.3 The Floor Area shall mean the Gross Floor Area of all enclosed spaces fulfilling the functional requirements of the building
measured flat on plan to the internal face of the enclosing walls.
6.4 The Drawing Numbers to be stated shall only be those of the Architectural floors plans, sections and elevations. Structural and
other detailed drawing numbers need not be stated.
7.0 INTERNAL SERVICES
7.1 The cost for the internal services shall be inclusive of Profit and Attendance and all builders work in connection therewith where
applicable.
8.0 GOODS AND SERVICES TAX (GST)
8.1 The amount to be allowed for GST shall be 6 percent of the total items of 1 to 6.
9.0 PROFESSIONAL FEES
9.1 The amount of Professional fees for each Consultant shall be inserted in the 'Cost' column.
10.0 CONTRIBUTION FEE TO LOCAL AND UTILITY AUTHORITY
10.1 Where the contribution fee payment is made by the Contractor in the name of the Contractor or the Consultant, the fee amount claimed by
the Contractor or Consultant from the Government is subject to GST. Where the contribution fee payment is made in the name of the Government,
the fee amount claimed by the paying party is not subject to GST.
1B/3/3 PDA Notes ms 1/1