100% found this document useful (1 vote)
3K views2 pages

Speed, Time, and Distance Worksheet

The document provides word problems involving speed, time and distance calculations. It contains 6 problems asking how far or long it takes to travel given speed and time or distance. An answer key with the solutions is provided.

Uploaded by

emana71
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views2 pages

Speed, Time, and Distance Worksheet

The document provides word problems involving speed, time and distance calculations. It contains 6 problems asking how far or long it takes to travel given speed and time or distance. An answer key with the solutions is provided.

Uploaded by

emana71
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

12/24/2020 Speed, Time, and Distance Worksheet

Speed, Time, and Distance Worksheet


1 a. Sarah drives her car with a constant speed of 60 km/h. How far can 1 b. Juan rides his horse with a constant speed of 8 km/h. How far can he
she travel in 1 3/4 hours? travel in 1/2 hour?

2 a. Noah roller skates with a constant speed of 12 miles per hour. How 2 b. A van moves with a constant speed of 84 km/h. How far can it travel
long will he take to travel a distance of 18 miles? in 1 hour 30 minutes?

3 a. A train travels with a constant speed of 116 km/h. How long will it take 3 b. Pete roller skates with a constant speed of 12 miles per hour. How far
to travel a distance of 377 kilometers? can he travel in 45 minutes?

[Link] 1/2
12/24/2020 Speed, Time, and Distance Worksheet

Page 2

Answer Key
1 a. She can travel 105 kilometers in 1 3/4 hours. 1 b. He can travel 4 kilometers in 1/2 hour.

He takes 1 hours 30 minutes or 1 1/2 hours to travel a distance of


2 a. 2 b. It can travel 126 kilometers in 1 hour 30 minutes.
18 miles.
It takes 3 hours 15 minutes or 3 1/4 hours to travel a distance of
3 a. 3 b. He can travel 9 miles in 45 minutes.
377 kilometers.

Copying permission: You are free to copy this worksheet to any number of students for their mathematics work. Do not distribute on websites, books, or any such material without permission. Copyright
[Link]

[Link] 2/2

12/24/2020
Speed, Time, and Distance Worksheet
https://www.homeschoolmath.net/worksheets/table-speed-time-distance.php?col=2&
12/24/2020
Speed, Time, and Distance Worksheet
https://www.homeschoolmath.net/worksheets/table-speed-time-distance.php?col=2&

You might also like