DAIKIN ELECTRONIC DEVICES MALAYSIA SDN. BHD.
MONTH :
MONTHLY CHECKLIST
AIR COMPRESSOR SYSTEM Department : Facility
1 Main Power Supply board (DB) free from dust. D
2 Check MCB /DB cable - should not blackened. D
3 Compressor surface to be free from dirt, dust and rust. D
Check all valve in open condition for a system prior
4 D
operation.
5 Main compressor display panel to be free from dust. D
6 No water leaking around compressor area. D
7 Air filter - romove / clean trapped dust before operation. D
Oil level checking.
8 (be sure that oil level is kept between 2 red lines during D
operation)
9 Oil leaking check around oil tank, piping and fittings. D
Discharge air Temperature during operation.
10 D
(must be between 65 to 100°C and reading must take)
Ambient Temperature during operation.
11 D
(must be < 45°C and reading must take)
Check final load pressure after "AUTOSTOP".
13 D
(shall be min.0.71 MPa and Reading must take)
14 Check all Pressure Gauge and reading must show 7 bar. D
12 Air relief valve to be checked. D
13 Motor abnormal noise check. D
14 Floor Cleaning W
15 5S D
16 Running hour D
Checked By Technician
Verified By Supervisor / Engineer
(R) Repair
(X) Not Good (√) Good /Checked (D) Daily (W) Weekly
(S) Service
(signature)