Proiect TTM Calcul Draft Survey: Student: Barban Oleksandr Grupa: TM 43

This document contains calculations for a draft survey of a ship before and after loading cargo. It provides key ship dimensions and draft measurements before loading with 430t of reserves and 11,570t of ballast. After loading 1690t of reserves, 395t of ballast, and an estimated 48,310.7t of cargo, it provides updated dimensions and draft measurements. It calculates trim, metacentric height, stability criteria, and displacement before and after loading to determine the amount of cargo loaded.

Uploaded by

Alex Barban
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
373 views8 pages

Proiect TTM Calcul Draft Survey: Student: Barban Oleksandr Grupa: TM 43

This document contains calculations for a draft survey of a ship before and after loading cargo. It provides key ship dimensions and draft measurements before loading with 430t of reserves and 11,570t of ballast. After loading 1690t of reserves, 395t of ballast, and an estimated 48,310.7t of cargo, it provides updated dimensions and draft measurements. It calculates trim, metacentric height, stability criteria, and displacement before and after loading to determine the amount of cargo loaded.

Uploaded by

Alex Barban
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Proiect TTM

Calcul Draft Survey

Student: Barban Oleksandr


Grupa: TM 43

Universitatea Maritima din Constanta

2020-2021
Inainte de incarcare
Tpv Bd = 3,24m + 23 × 0,02m = 3,7m
Tpv = 3,72m
Tpv Td = 3,28m + 23 × 0,02m = 3,74m

T⊗ Bd = 4,05m + 23 × 0,021m = 4,53m

T ⊗ = 4,5115m

T⊗ Td = 4,01m + 23 × 0,021m = 4,493m

Tpp Bd = 5,52m + 23 × 0,022m = 6,026m


Tpp = 6,061 m
Tpp Td = 5,59m + 23 × 0,022m = 6,096m

Rezerve = 200t + 23 × 10t = 430t


Balast = 9500t + 23 × 90t = 11570t
t
ρapa = 1,014 m ³
t
ρdoc = 1,025 m ³
[Link] = Tpp – Tpv = 6,061 m – 3,72m = 2,341 m
dpv = 5,27m dpp = 8,6m d⊗ = 0m

LBM = 171,13m LBP = 185m


AP .TRIM
x,y,z = d(pv,pp,⊗) × LBM
2,341m
x = 5,27m × 171,13m = 0,072091m
2,341m
y = 8,6m × 171,13m = 0,11764m
2,341m
z = 0 × 171,13m = 0m
[Link] = Tpv – x = 3,64791 m
T⊗.cor = T⊗ + z = 4,5115m
[Link] = Tpp + y = 6,17864m
(REAL)TRIM = [Link] – [Link] = 6,17864m – 6,64791m =
=2,53073m (nava este apupata)
Tpv . cor ×6 T ⊗ . cor ×Tpp . cor 3,6479 m+6 × 4,5115 m+6,17864 m
MMC = 8 = 8 =
=4,6119m

Deschidem Tablele Hidrostatice


Pentru MMC = 4,61m :
 Dispacement = 22084t
 TPC = 50,7t
 LCF = 4,31m (spre prova)

Pentru MMC + 0,5m » MCT1 = 566,8 tm


Pentru MMC – 0,5m » MCT2 = 554,9 tm
TRIM × LCF ×TPC × 100 2,5307 m× 4,31 m×50,7 t × 100
cor A = LBP = 185 m =

= 298,9194t
(+) TRIM si LCF sunt in aceeasi directie

cor A este NEGATIVA


(-) TRIM si LCF sunt in directii diferite

cor A = -298,9194t

ΔMCT = MCT1 – MCT2 = ,8t – 552,4t = 12,2t


TRI M 2 ×50 × ΔMCT ( 2,53073 m )2 ×50 ×11,9 t
cor B = LBP = 185 m = 20,5985t

Dcor = Displacement ± cor A + cor B = 22084t – 298,9194t +


+20,5985t = 21805,6791t
ρapa
D = Dcor × ρdoc = 21571,6669 t
D = D0 + rezerve + ballast + k »»»

k = D – D0 – rezerve – balast =21571,6669t – 9360t – 430t -11570t =


= 211,669 t
Dupa incarcare
Tpv Bd = 10,84m + 23 × 0,03m = 11,53m
Tpv = 11,56m
Tpv Td = 10,9m + 23 × 0,03m = 11,59m

T⊗ Bd = 11,01m + 23 × 0,028m = 11,654m

T ⊗ = 11,669m

T⊗ Td = 11,04m + 23 × 0,028m = 11,684m

Tpp Bd = 11,15m + 23 × 0,025m = 11,725m


Tpp = 11,695m
Tpp Td = 11,09m + 23 × 0,025m = 11,665m

Rezerve = 1000t + 23 × 30t = 1690t


Balast = 50t + 23 × 15t = 395t
t
ρapa = 1,032 m ³
t
ρdoc = 1,025 m ³
[Link] = Tpp – Tpv = 11,695m – 11,56m = 0,135m
dpv = 5,27m dpp = 8,6m d⊗ = 0m

LBM = 171,13m LBP = 185m


AP .TRIM
x,y,z = d(pv,pp,⊗) × LBM
0,135 m
x = 5,27m × 171,13m = 0,00415m
0,135 m
y = 8,6m × 171,13m = 0,00678m
0,135 m
z = 0 × 171,13m = 0m
[Link] = Tpv – x = 11,55585m
T⊗.cor = T⊗ + z = 11,669m
[Link] = Tpp + y = 11,70178m
(REAL)TRIM = [Link] – [Link] = 11,70178m – 11,55585m =
=0,14593m (nava este apupata)
Tpv . cor +6 T ⊗. cor +Tpp . cor
MMC = 8 =
11,55585 m+ 6 ×11,669 m+11,70178 m
8
=11,658m

Deschidem Tablele Hidrostatice


Pentru MMC = 11,658m :
 Dispacement = 59543t
 TPC = 56,1t
 LCF = 3,98m (spre pupa)

Pentru MMC + 0,5m » MCT1 = 755,7 tm


Pentru MMC – 0,5m » MCT2 = 744,2 tm
TRIM × LCF ×TPC × 100 0,14593 m×3,94 m×56,1 t ×100
cor A = LBP = 185 m =

= 17,435t
(+) TRIM si LCF sunt in aceeasi directie

cor A este POZITIVA


(-) TRIM si LCF sunt in directii diferite

cor A = +17,435t

ΔMCT = MCT1 – MCT2 = 755,7t – 744,2t = 11,5t


TRI M 2 ×50 × ΔMCT ( 0,14593 m)2 ×50 ×11,5 t
cor B = LBP = 185 m = 0,066t

Dcor = Displacement ± cor A + cor B = 59543t +17,435t + +0,066t =


59967,25t
ρapa
D = Dcor × ρdoc = 59967,25t
Calculul cantitatii de marfa incarcata :

Deplasament inainte de incarcare :21571,66t (A)


Rezerve inainte de incarcare : 430t
12000t (a)
Balast inainte de incarcare : 11570t

Deplasament dupa incarcare : 59967,25t (B)


Rezerve dupa incarcare : 1690t
2085t (b)
Balast dupa incarcare : 395t

Q=(B-b-D0)-(A-a-D0)=B-b-A+a=(B-b)-(A-a)
Q=57882,25t-9571,55t=48310,7t