Republic of the Philippines
Province of ____________
Municipality of _______________
Municipal Engineering Office
UNIT COST OF EQUIPMENT (ACEL Rates)
Description Unit Unit Cost
EQUIPMENT (rental rates, including operator, oil, fuel and taxes)
I Prime Mover trip
II Bulldozer (D8) day
II.a Clearing ( 500 m /hr )
2
II.b Stripping ( 200 m2/hr )
II.c Excavation ( 25 m3/hr )
II.d Quarry ( Stock pilling) ( 50 m3/hr )
II.e Pushing ( 3 m3/hr )
III Backhoe (0.50 cu.m.) day
III.a Excavation ( Normal condition ) ( 20m /hr )
3
III.b Excavation ( Hard soil / rocky ) ( 15 m 3/hr )
IV Road Roller (tandem Vibro) day
IV.a 6 Passes ( 72 m /hr )
3
V Road Grader day
V.a Sub grading ( 300 m2/hr )
V.b Spreading ( 42.50 m3/hr )
V.c Clearing ( 950 m2/hr )
V.d Excavation ( 20 m3/hr )
VI Payloader day
VI.a Loading ( 30cu.m/hr )
VII Water Truck day
VII.a Watering ( 4000 gals capacity)
VII.b Concrete Vibrator day
VIII Concrete Mixer including Motor, Oil and Fuel ( One Bagger) day
IX Welding Machine day
X Electric Grinder day
XII Oxy-Acetylene day
XIII Mini Dump Truck day
Prepared By:
Municipal Engineer
Republic of the Philippines
Province of ____________
Municipality of _______________
Municipal Engineering Office
Labor Cost
Republic of the Philippines
Province of ____________
Municipality of _______________
Municipal Engineering Office
UNIT COST OF MATERIALS
Description unit Unit Cost
CONTRUCTION MATERIALS AND HARDWARES
1 Portland Cement Type 1P bag
2 Portland Cement type 1 bag
3 1" Graded Gravel cu.m.
4 Washed Sand cu.m.
5 Filling Materials cu.m.
6 4"- 6" Boulders cu.m.
9 Aggregate Base Course (Bacalan Source) cu.m.
10 Asphalt drum
11 300mm Diameter RCPC pc.
12 600mm Diameter RCPC pc.
13 900mm Diameter RCPC pc.
14 1000mm Diameter RCPC pc.
15 1200mm Diameter RCPC pc.
16 Good Lumber bd.ft.
17 Coco Lumber bd.ft.
18 Common Wire Nails kg.
19 Hacksaw Blade pcs
20 #80 Nylon String clip
21 0.40mm x 1.2 x 2.4 G.I. Sheet sheet
22 50mm Schedule 40 G.I. Pipe length
23 3mm x 25mm Angle Bar length
24 20mm dia RSB, Grade 33 length
25 16mm dia RSB, Grade 33 length
26 12mm dia RSB, Grade 33 length
27 10mm dia RSB, Grade 33 length
32 16mm Plain Bar length
33 12mm dia Plain Bar length
34 10mm dia Plain Bar length
35 10mm Square Bar length
36 Welding Rod kg.
37 1/8 x 1/2 Blind Rivets pc.
38 #16 GI Tie wire kg.
39 1/4" x 4' x 8' Ordinary Plywood pc.
40 12" x 12" Bronze Name Plate (Engraved) pc.
41 Semi-Gloss Latex Paint li.
43 Metal Primer li.
44 Quick Dry Enamel (Black) li.
45 Quick Dry Enamel (White) qt.
46 Tinting Color (Blue) pint
47 Tinting Color (Yellow) pint
48 Tinting Color (Red) pint
49 1" Paint Brush pc.
50 2" Paint Brush pc.
51 Construction Spade pc.
53 Construction Pail pc.
54 Rubber Boots pc.
55 Hard Hat pc.
56 Bara pc.
57 Hand Gloves pc.
58 Dust Mask pc.
59 Empty Drum pc.
60 Steel Cabinet (3 layers) pc.
61 Rope m.
62 1/4"x4'x8' Marine Plywood shts
Prepared By:
Municipal Engineer
Republic of the Philippines
Province of ____________
Municipality of _______________
Municipal Engineering Office
LABOR RATES
Item No. Item Description Quantity Unit Unit cost
I Engineering Supervision 1 per day
II Foreman 1 per day
III Skilled
a. Mason 1 per day
b.Carpenter 1 per day
c.Steelman 1 per day
d. Welder 1 per day
e. Electrician 1 per day
f. One bagger operator 1 per day
g. Leadman 1 per day
h. Plumber 1 per day
i. Glass Installer 1 per day
j. Painter 1 per day
k. Tile setter 1 per day
l. Tinsmithmen 1 per day
IV Unskilled/Laborer 1 per day
V Bodegero 1 per day
( also Incharge of materials' record)
Certified Correct:
Municipal Engineer