1. Outline of Project
2. SOW
2.1 Architectural Fire Protection(Passive fire Protection)
2.2 Fire Water System
2.3 Fire Alarm System
3. Schedule
PT 4060 PT 4061
24.085 ac 24.688 ac
Key plan
Bird View
Provide all necessary "Passive Fire Protection" comments on the drawings above for endorsement.
Not limited to below
• Purpose Groups
• Compartments
• Mixed use building
• Fire Appliance Access
• Road width
• Perimeter access
• Fire hydrant
• Walls and Floors
• Compartment walls (FRP requirements for-non masonry )
• Compartment floors
• Structural protection
• Horizontal and vertical barrier of external wall
• Cladding on external wall
• Notional boundary distance
• Means of Escape
• Travel distance to exits
• Staircase requirements according to escape provision computation
• Smoke exhaust system (Active Fire Protection?)
© 2021 JGC CORPORATION 12
Chapter 02: Architectural Design
2.1 Architecture
2.1.7 Passive Fire Protection
Outline Factory Bldg. Admin/Lab Bldg. Energy Bldg. Pellet Bldg. Flammable Storage WWT Plant
Storey 2 2 1 1 1 1
Height 31.00m 12.50m 5.50m 5.50m 5.50m 5.50m
RC
Structure RC RC RC RC RC
S(PEB)
Fireproof
TBD Partial requirement TBD TBD Necessary TBD
Req.
Phase Phase 1 Phase 2 Phase 1 Phase 2 Phase 1 Phase 2 Phase 1 Phase 1 Phase 1 Phase 2
延床面積
38,000 16,000 10,600 - 1,125 800 300 1,380 480 480
[m2]
※Others: Fire Pump Bldg., Gas Station, Substation, Waste Storage, Guardhouse, Pellet Silo, Liquid Nitrogen yard, Water Tank
Grade F
General Visitors corridor Vinyl Flooring Sheet LGS+GBR+GBR+Vinyl Cloth LGS+GBR+DR PVC molding
(靴履替えなし)
<Admin / Lab. Bldg.>
Zone General rooms Floor Wall Ceiling Others
Seal molding、
Grade E
Changing room Vinyl Flooring Sheet Steel Partition Steel Partition Wall corner/Wall-ceiling
Pharmaceutical
corner R Aluminum
Grade F
General Entrance hall Porcelain tile Steel Partition Aluminum louver panel AL molding
(靴履替えなし)
Grade F
General Office, Visitor hall Tile carpet LGS+GBR+GBR+Vinyl Cloth LGS+GBR+DR PVC molding
(靴履替えなし)
<Legend>
LGS : Light Gauge Steel
GBR : Gypsum Board Regular type
EP : Emulsion Paint
© 2021 JGC CORPORATION 16
Chapter 02: Architectural Design
2.1 Architecture
2.1.9 Interior Finishing Schedule
<Other Buildings>
Grade F
LGS+GBR+GBR+Vinyl
General Guard House PVC Tile LGS+GBR+DR PVC molding
Cloth
(靴履替えなし)
Grade F
Permeable conc
General Flammable Storage Exposed Exposed ー
+Dust proof paint
(靴履替えなし)
Grade F
Permeable conc
General WWT Plant Exposed Exposed ー
+Dust proof paint
(靴履替えなし)
Grade F
Permeable conc
General Energy Bldg. Exposed Exposed ー
+Dust proof paint
(靴履替えなし)
Grade F
Permeable conc
General Pellet Storage LGS+GBR+SiCa+G-EP Exposed ー
+Dust proof paint
(靴履替えなし)
<Legend>
LGS : Light Gauge Steel
GBR : Gypsum Board Regular type
EP : Emulsion Paint
AA B
Perimeter Pile
erimeter Pile 1 2 3 4 5 6 7 8 9
160000
10 11 12 13 14 15 16 17
foundation 02
10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000
F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3
2700
F4 F4
H
1800 1800
foundation 02
9700
900 900
5400
5400
F4 F4
600
G
SPUN PILE
10000
900
D600
1800
1800
600
F4 F4
F
2700
900
10000
Spun pile E
F4 F4
D600 600
600
FOUNDATION F4
69400
10000
FOUNDATION F3
F4 F4
600 D
TIE BEAM
300x600mm Plan Spun pile
D600
▼1FL 1ST FLOOR LEVEL
10000
200
600
F4 F4 TIE BEAM
内側 外側 C 300x600mm
1000
200
OUTSIDE GROUND LEVEL
10000
▲GL
1000
500
外側
1000
B
F4 F4
▼GL 内側 OUTSIDE GROUND LEVEL
600
500
9700
EXPANSION JOINT
EXPANSION JOINT
CONCRETE SPUN PILE
600
D600 F4 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F4
A
39700 29700
TIE BEAM
300x600mm
300 1ST FLOOR LEVEL 300 1ST FLOOR LEVEL 300
1000
OUTSIDE
GROUND LEVEL
U/G pit OUTSIDE GROUND LEVEL
400
UNDERGROUND PIT
500
400
GRAVEL
1500 1500 THK=100mm 1500
LEAN CONCRETE LEAN CONCRETE
H D A
SECTION A-A
A-A section
600 600
TIE BEAM TIE BEAM
300x600mm TIE BEAM 300 300x600mm
300x600 1ST FLOOR LEVEL 1ST FLOOR LEVEL
200
SLAB
200
1000
OUTSIDE GROUND LEVEL OUTSIDE GROUND LEVEL
1200 1200 1200 1200
LEAN CONCRETE LEAN CONCRETE SPUN PILE SPUN PILE
D400 D400
500
600
SPUN PILE GRAVEL
D400 1500 THK=100mm
LEAN CONCRETE
SPUN PILE LEAN CONCRETE
D400 SPUN PILE
D600
SPUN PILE
D600 Spun pile Spun pile
H D400 D A D600
SECTION B-B
B-B section
© 2021 JGC CORPORATION 20
Chapter 02: Architectural Design
Sidewalk
2.3 Exterior work Pipe rack
2.3.1 External structures, Road pavement, Drainage Plan
Roofing over
sidewalk
Road section
Green area
Legend
Lawn
Heavy duty road
Light duty road
Gravel
Pipe rack image 芝生イメージ図 Sidewalk
L ditch (0.3mx0.3m)
V ditch (0.3mx0.3m)
Manhole
(MH-1mx1m)
Exit Gate
Manhole
(MH-0.5mx0.5m)
Dainage slope
Tie-in of water
• In order to keep space for fire water pump, the approximate size for fire water pump area is
required, after pump capacity is decided.
Note:
• When it is judged that (water/foam) sprinkler is not adequate, it is required to propose the
alternative protection system, such as gas suppression system.
Fire Alarm System Drawing Fire Alarm Layout for Factory (1st Floor) including cable routing, symbol drawing
Fire Alarm System Drawing Fire Alarm Layout for Factory (2nd Floor) including cable routing, symbol drawing
Fire Alarm System Drawing Riser Diagram for Fire Alarm Layouts
Fire Alarm System Narrative Specification of Fire Alarm Devices, Panels and Cables
• KOM : 28-Apr
• Interim Meeting-1 : if any
• Interim Meeting-2 : 26-May(4 weeks for preparation of Deliverables)
• Final Meeting : 9-Jun(1 week comment by JGC, 1 week follow up by BL&H)
Notes;
Interim Meeting-1 :to discuss and confirm the Basic Design Concept of the systems before starting the
preparation of the deliverables either by JGC or consultant
Interim Meeting-2: to discuss and confirm the verification result by consultants or JGC’s comment on the
deliverables by consultants