Contract Role in Power Plant Engineering

- The document provides a summary of G.Keerthi Vasan's career objective, experience, skills, and responsibilities. - Vasan has over 15 years of experience in engineering for power plants and their auxiliaries, including cooling towers, pumps, heat exchangers, and water treatment plants. - Recent experience includes working as a lead engineer on a 600MW hybrid solar power project and preparation of pre-bid engineering documents for a combined cycle power plant.

Uploaded by

Shankker Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
291 views10 pages

Contract Role in Power Plant Engineering

- The document provides a summary of G.Keerthi Vasan's career objective, experience, skills, and responsibilities. - Vasan has over 15 years of experience in engineering for power plants and their auxiliaries, including cooling towers, pumps, heat exchangers, and water treatment plants. - Recent experience includes working as a lead engineer on a 600MW hybrid solar power project and preparation of pre-bid engineering documents for a combined cycle power plant.

Uploaded by

Shankker Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

G.

KEERTHI VASAN

No 410 Vasavi Rain bow Apartment ,


Dotta Thoguru, Electronic city
Email: Vasang80@[Link]
Electronic City, Bangalore
Mob: +91- 9597442512

CAREER OBJECTIVE

To seek a challenging position in a growth-oriented and dynamic organization, where by flexibly channelizing all
my potentials and strong enough to prove ability and knowledge in my workplace.
Targeting challenging assignments in Process Engineering/BOP/Fire fighting systems /WTP/ Piping Layout with
an organization of high repute preferably in the Power sector

SUMMARY
 Total experience of about 15 years in Basic and Detail engineering of Power plant and its Auxiliaries
equipment, Balance of Plant (BOP) Packages Comprising of Cooling Tower, cooling water pumps,
,Surface condenser, Heat exchanger, Air compressed system Tanks, Piping Layout, Fire fighting systems,
material handling systems ,Fuel Handling system, WTP, and Detailing of supports for Power projects and
Utility systems.
 Having good design concept and exposure in vendor management in packages like cooling Tower and
Pumps, Heat exchangers, Condensers, Fuel tanks, Water tanks and layout, and water treatment plant,
pre-treatment palnt, DM plant and its RO system, Effluent treatment plant.
 Hands on experience in Thermal Power plant (Coal, Bio Mass and Solar based plant)
 Exposure to Combined power cycle power plant and BFG boilers.
 Exposure to ASME/ANSI/ IS, ISO, API, HEI, NFPA and TAC Codes and Standards for Power and Process
Piping.,
 Good and well exposure in power plant process. (P&ids, PFD, HMBD)
 Good knowledge of Engineering, vendor management and project management methods.

PRESENT EXPERIENCE SUMMARY


M/s TCE at Bangalore (Contract Role - Dec 19 – till Date)
As an Lead Engineer in Mechanical BOP and KKS Tagging Philosophy and coding for Hybrid Solar Power
Project 600 MW.
Technical Engineer in WTP for ADEN power Plant, PESCO Abhudhabi.
Preparation of Pre bid Engineeering Documents, WBD, Water requirement calculations for combined
cycle power plant.
Technical specification and Line sizing of PIDs.
Review of Vendor offer and finalize the WTP package for the budgetary offer.
Involve in Fire fighting package and Losses calculation for combined cycle power plant.

M/s Sobha Ltd (From Sep 2018 till Nov 2019)


worked In Infosys Project as an Sr MEP, responsible for PHE, FHS and STP co-ordination.
Have exposure in erection and commissioning of 2 x 300 KLD MBR plant.
Have knowledge of Geberit and George fisher piping for water line and surface drainage pipes.
Material Follow up with supplier and get the same in time to complete the project.
Execution and Billing of Entire PHE, FHS and STP for entire site.
Exposure in fire and HPS Pump installation and WTP equipments.
Well exposure in ERP for sub contractor billing.
Responsible for Executed items taking measurement at site and supply items , prepare the bill and get
certify from PMC/Client.
Co-ordination with civil team for necessary clearance for PHE works.

PREVIOUS EXPERIENCE SUMMARY


 Previous Employer : M/s Thermax Ltd, Pune.
 Designation : Asst manager
 Duration : May 2010 – May 2017

 Present Employer : M/s Akhsheya Enterprises


 Designation : Project co-ordinater
 Duration : May 2017 till date

SKILL SET:
Proposal Engineering
Balance of Plant, Cooling tower and pumps,surface condensers, De-aeartor, Feed water pumps Fuel oil system,
Heat exchangers, static equipements like oil and water storage tanks, WTP, STP, ETP Packages.
Project management/ vendormanagement / sub contractor co-ordination at site.
Fire fighting systems
Air conditioning and ventilation systems
Thermal Power Plant Operations
Estimation & Cost Optimization
Operations & Maintenance
Design & Detailed Engineering
Equipment and Piping Layout
Team Building & Management

KEY RESPONSIBILITIES:
 Understanding Tender document and preparation of power plant layout.
 Evaluation of Pre order bids and comparison of Technical offer/ bids based on budget cost, Review,
approval of suitable vendors and management of vendor documents after post order.
 After post order, Review of vendor drawings and documents as per the contract award, making deviations
if any, Approval of drawings and documents with interface the Electrical, C&I, and civil departments and
release for site.
 Selection of right boiler, turbine and other equipments.
 Calculation of auxiliary unit sizing (DM plant, CHP, AHP, ESP, Effluent water treatment).
 Understanding boiler concept, familiar with usage of codes and Standards (ASME,TEMA,ISI,NEMA,API, BS)
 Design co-ordination with client and manufacturer till the completion of contract.
 Preparation of P & Id, HMBD, WBD Diagrams as per contractual requirements.
 Interaction with other design team for solving Technical issues and interface.
 Preparation of Design Basis Report for the entire project.
 Preparation of Preliminary Layout and plot plan.
 Preparation of TG hall layout, water treatment plant layout, cooling water piping layout.
 Preparation of Specification for ash handling system, air compressor system, fire fighting system,DM
plant, dosing systems, cooling tower and fuel handling system, Fuel oil pumps, Miscellaneous pumps,
Pipes and specialties.
 Specification for AFBC, CFBC, WHRB, HRSG boilers and specification for all BOP equipments.
 Specification for pumps, compressors and heat Exchangers for power plants and offshore projects
(Knowledge in API 610, API672, TEMA, ASME standards)
 Preparation of design basis report for the project.
 Preparation of chimney and cooling tower layouts, specification
 Specification for firefighting systems.
 Scheduling and planning of project execution.
 Review of fabrication drawings, preparation of Fabrication drawings of boiler support structure.
 Making power plant commissioning plan and arrange resources.
 Preparation of Purchase specification (Technical) for EPC contracts.
 Well versed knowledge in ERP/ SAP and Indenting materials for projects.
 Co-ordination with Procurement for the materials / equipments to delivered the same in Target date.
 Approval of manufacturer design and layout drawings from vendor.
PROJECT SUMMARY:
Project Scope Responsibility
Project: IMFA project, 2X60MW Engineering  Preparation of preliminary General Arrangement
Client: Indian metals and ferrous Manager drawing
alloy Ltd  Preparation of functional specification and vendor
Location: Cuttack, Orissa management for the packages for cooling towers and
pumps, condensers, heat exchangers, Miscellaneous
centrifugal pumps, Reciprocating pumps, fuel oil pumps,
fire fighting system, compressed air system , EOT crane ,
Hoist and Pipes and specialties.
 Handling of entire packages Cooling Towers, Pumps, Fuel
handling systems, Fuel oil pumps, Storage tanks,
Elevators, Hoist, ETP, Valves, control valves and Pipes
and specialties, Fire Fighting systems, EOT Crane, Hoist,
Air Compressed systems, Misc pumps and Fuel oil
pumps.
 Preparation and planning of (BOM) Materials take off for
the entire project like Pipes and fittings, valves and
specialties and indenting the same Through ERP (oracle)
and close Co –ordination with Procurement to delivery
of the materials with in Target date.
 Review of Process P&IDs, HMBD for the Boiler, STG and
WTP packages.
 Review of GA drawings of all equipments Data sheet for
dual media filter, sand filter, ultra filter, dosing pumps,
chlorination system and DM plant.
 Preparation of Design Basis Report, P&ID, and Basic
Engineering documents as per process parameter
requirement.
 Preparation of other process data sheets, Line List,
Utility List, Auxilairy consumption, Valve list, Equipment
List as per process Requirements.
 Tank Volume calculations, Fabrication drawings
 Meenakshi Energy Limited, 2X Lead  Preparation of Plot plan and, preliminary General
135 MW Arrangement drawing,.
Engineer
Functional specification and managing vendor
 Client : Meenakshi Energy
documents and drawings and ensure the approval for
Limited
 Location : Nellore, Andhra the entire package for cooling towers, pumps,
paradesh Miscellaneous centrifugal pumps, Reciprocating pumps,
fuel oil pumps, Air compressors, firefighting system,
compressed air system , EOT crane , Hoist and Pipes and
specialties.
 Preparation of Design Basis Report, P&ID,
and Basic Engineering documents as per
process parameter requirement.
 Preparation of other process data sheets,
Line List, Utility List, Auxilairy consumption,
Valve list, Equipment List as per process
Requirements.
 Managing entire packages of Boilers and STG
(P&ID , HMBD review ) CHP, AHP, Elevators,
Cooling Tower, Hoist, ETP, IBR and NIBR
Valves, Control Valves and Pipes and
Specialties, Fire-fighting Systems, EOT Crane,
Hoist, Air Compressed Systems, Misc pumps
and Fuel Oil Pumps
 Planning of (BOM) Materials take off for the
entire project like Pipes and fittings, valves
and specialties and indenting the same
Through ERP (Oracle) and close coordination
with Procurement to delivery of the
materials within target date.
 Coordinating with contractors / builders and
providing them with all the detailed
construction documents at site.
 Design of Fire fighting systems for entire
plant. (Hydrant and spray)
 Co-ordination with Project management to
complete the major packages in scheduled
time and avoid miss outs and delays at site.
 Preparation of General Arrangement drawing, P&ID,
water balance scheme.
 Calculations of chimney stack height and diameter ,
boiler performance, Heat rate, Bunker volume, Fuel
Project: Abhinav Steels Limited, 1X
Analysis calculation
60 MW Thermal Power
Engineering  Coordination with other design teams and client.
Plant.
Manager  Review of Process P&IDs, HMBD for the Boiler, STG and
Client: ASL- India
WTP packages.
Location: Uttar Pradesh, saithara
 Review of GA drawings of all equipments Data sheet for
dual media filter, sand filter, ultra filter, dosing pumps,
chlorination system and DM plant.

Project: Sudharshan Chemicals Engineering  Design / Preparation & Review of P&IDs, Flow
diagrams, Plot Plan, Equipment layouts, Piping
Limited Manager
layouts, piping isometric drawings BOMs etc.
Roha, Maharashtra 1 X 8
 Preparation of technical specification and technical
MW , Coal based Power Plant
evaluation of vendor pre-bid and Post-bid offer for
Client: SCL- Roha rotating equipment’s such as Cooling tower,Pump,
Compressor, other balance of plant packages like
Location: Roha, Maharashtra
AHP, Water treatment plant, Storage tanks.

 Layout checking, Plot plan checking, checking of civil


drawings and release for constructions.
 Preparation of water treatment plant layout
 Preparation of TG Deck Drawing in co-ordination with
Civil & Electrical.
 Specification for firefighting systems
 Preparation of design basis report for the project.
 Preparation and planning of (BOM) Materials take off for
the entire project like Pipes and fittings, valves and
specialties and indenting the same Through ERP (oracle)
and close Co –ordination with Procurement to delivery
of the material with in Target date.
 Preparation of technical purchase specification for
Cooling tower, pumps, Aircompressors, Fuel oil
systems, Ash handling system (Dense phase),WCC, fuel
Project: Lamson Power corporation
handling system and Handling of packages for
1 x 15 MW, Bio Gas Based power
Lead execution.
plant
Engineer  Vendor drawing, Layout & Plot plan review
Client: Lamson Power corporation
 Preparation of General Arrangement drawing, P&ID,
Location: Philippines
water balance scheme.
 Preparation and checking of chimney and cooling tower
layout.
 Design / Preparation & Review of P&IDs, Flow
diagrams, Plot Plan, Equipment layouts, Piping
layouts, piping isometric drawings BOMs etc.

 Preparation of technical specification and


technical evaluation of vendor pre-bid and Post-
bid offer for rotating equipment’s such as Cooling
Project: Lamson Power corporation
Lead tower, condenser, Pump, Compressor, other
1 X 5.5 MW balance of plant packages like Fuel oil system,
Engineer static equipment,
Client: Lamson power corporation
 Preparation of engineering project schedules,
Location: Phillipines drawing/ document submission schedules,
Planning, monitoring & coordinating the
engineering activities, drawing/ document flow in
line with the target dates.

 Layout checking, Plot plan checking/ Review

Project: 1 X 500 MW, Singareni  Preparation of Detailed Project Report for various power
Collieries Ltd, A.P. Lead plant systems.
Client: Singareni collieries ltd Engineer
Location: Kurnool
Project: 1X 125 MW Reliance Solar Lead  Preparation of P&ID Diagram for Steam, feed water,
Power Project Engineer ACW systems, Central Lube oil system.
 Preparation of calculations for All the entire Static
equipments and Tanks for the Auxiliary of Turbines,
Atm flash tank, Lube oil over head tank, Air receivers,
Dirty and Clean oil tanks and Condensate storage tank.
 Preparation of specification of Power cycle pumps, BFP,
CEP and Review Vendor offer, data sheet evaluation,
and finalize the order.
 Preparation of Specification of Heaters and Review of
Vendor offer and order finalization.
 Indenting the Materials Pipes, valves, all equipments
through ERP and co-ordination with Procurement to
deliver the same in target time.
 Go through of Tender documents of entire package and
Project: 2 X 40 MW Blast Furnace
mention Deviations if any.
gas Based Power plant, Lead
 Preparation of Technical specifications of BFG Boiler,
Client: NMDC Engineer
Steam turbine, Misc Pumps, BOP P&ID.
Location: Chhattisgarh.
 ERP, Pre planning for materials for project.
Company: Utility Power Tech
Limited (From Oct 2006 to Nov
2007)  Coordinating Tendering and site activities.
Involving in Mechanical Project  Preparation of Material Specification for Pipe, Valve
Maintenance , Shut down Engineer &Fittings
of boiler and turbine  Preparation of BOM.
Client: NTPC
Location: Kawas Surat
Company: Hexagon Engineers Ltd Project  Checking of GA drawings for receivers &Tanks.
(From Sep 2002 to Sep 2006) Engineer  Preparation of As-built drawings
Client: Jindal Aluminum Ltd,  Coordinating, planning site erection and commissioning
Bangalore activities.
Location: Bangalore  Preparation of engineering project schedules,
drawing/ document submission schedules, Planning,
monitoring & coordinating the engineering activities,
drawing/ document flow in line with the target
dates.
 Preparation of MTO and fabrication drawings.
 Preparation of general arrangement drawing, P&ID,
Water Balance Scheme.
 Handling entire packages of Boilers and STG (P&ID ,
HMBD review ) CHP, AHP, Elevators, Cooling Tower,
Hoist, ETP, IBR and NIBR Valves, Control Valves and
Pipes and Specialties, Fire-fighting Systems, EOT
Crane, Hoist, Air Compressed Systems, Misc pumps
Company: Cethar Consulting and Fuel Oil Pumps.
Engineers Ltd (From Dec 2007 to Lead  Design of Fire fighting systems for entire plant.
 Planning of (BOM) Materials take off for the entire
Apr 2010) Engineer project like Pipes and fittings, valves and specialties
Location: Chennai and indenting the same Through ERP (Oracle) and
close coordination with Procurement to delivery of
the materials within target date.
 Site Co-ordination with Vendors and sub contractor
to execute the major packages like Coal Handling,
ash handling, cooling towers and WTP areas at site
within scheduled period.

SOFTWARE KNOWLEDGE
 AutoCAD,
 MS Office
 SP 3D
 Navis works

ACHIEVEMENTS & ACOMPLISHMNETS


 Implementation of Cooling tower and pumps, Fuel oil system, storage tanks, WTP, Fire fighting system for
power plant for IMFA & successfully commissioned system for two units.
 Timely completion of All the BOP Packages, Cooling tower and its auxiliary, Fuel oil system, Air
compressed system, Water storage equipment and layout, Fire water distribution , Pipes and specialties
and commissioned the same for IMFA and RIL Project with in target date.
 Coordinated team members with Procurement department for a scheduled delivery of fabrication Items,
bought out items, for the power plant with in a Target date.

ACADEMICS
 B.E. (Mechanical Engineering) – Bhartidasan University – May 2002. (70 %)
 XII – Padma sarangapani – Chennai- State Board – 1998. (81%)
I hereby declare that the above-mentioned information is true to the best of my knowledge.
(G KEERTHI VASAN)
Bangalore