Appendix E: Checklist For Kerbstone Works Location / Identification: Drawing No.: No. Description Yes No N/A

This document contains two checklists for construction projects. The first checklist is for kerbstone works and contains 9 items to check such as safety precautions, sufficient materials, proper storage, compaction, setting out, concrete work, alignment, installation, and curing. The second checklist is for survey activities and contains 6 items to check like equipment calibration, control points, drawings, utilities, and layer thickness. Both checklists are to be signed off by construction, QA/QC, and project management representatives to verify the activities were properly checked and complied with requirements.

Uploaded by

JericFuentes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
867 views2 pages

Appendix E: Checklist For Kerbstone Works Location / Identification: Drawing No.: No. Description Yes No N/A

This document contains two checklists for construction projects. The first checklist is for kerbstone works and contains 9 items to check such as safety precautions, sufficient materials, proper storage, compaction, setting out, concrete work, alignment, installation, and curing. The second checklist is for survey activities and contains 6 items to check like equipment calibration, control points, drawings, utilities, and layer thickness. Both checklists are to be signed off by construction, QA/QC, and project management representatives to verify the activities were properly checked and complied with requirements.

Uploaded by

JericFuentes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Appendix E: Checklist for Kerbstone Works
  • Appendix F: Checklist for Survey Activities

APPENDIX E

CHECKLIST FOR KERBSTONE WORKS

Location / Identification:

Drawing No.:

No. Description YES NO N/A

1 Safety precautions are taken before commence the work.

2 There is sufficient material to perform work at the site.

3 Kerbs are stored properly at the site.

4 Field compaction is passed.

5 Setting out is carried out for formwork and foundation concrete.

6 Foundation concrete is casted and cured properly.

7 Alignment and top level of kerb is checked.

8 Kerbstone is installed properly.

9 Backing concrete is casted and cured properly.

Remarks:

THE ABOVE ACTIVITIES WHERE CHECK AND COMPLIES WITH THE REQUIREMENT

Construction Representative QA/QC Representative PMC Representative

Name:
Name: Name:

Signature:
Signature: Signature:

Date:
Date: Date:

TIP - QP - 001
APPENDIX F:

CHECKLIST FOR SURVEY ACTIVITIES

Location / Identification:

Drawing No.:

No. Description YES NO N/A

1 Survey equipment calibration

2 Determining the application point.

3 Establishing of control points for alignment, elevation and slopes.

4 Compliance with relevant Drawings.

5 Setting out of the existing utilities

6 Filling layer thickness.

Remarks:

THE ABOVE ACTIVITIES WHERE CHECK AND COMPLIES WITH THE REQUIREMENT

Construction Representative QA/QC Representative PMC Representative

Name:
Name: Name:

Signature:
Signature: Signature:

Date:
Date: Date:

TIP - QP - 002