PAGE NO :
DESIGN CALCULATIONS OF TOWER CRANE PILE FOUNDATION DESIGN REV. NO. : R0
PILE DATA:
Type of Pile = Bored Cast-in-situ
Size = 400.0 mm diametre
Founding depth = 8 m below NGL
Pile cut-off level = 1 m below FGL
Grade of Concrete, fck = M 30
Concrete Elastic Modulus (E) = 5000 (fck)1/2
2
= 27386 N/mm
2
E = 273861 kg/cm
4
Moment of Inertia (I) = 125664 cm
Value of constant (K1), for Medium Sand = 0.525 From IS:2911(P1/S1)-
1/5
T = ( E * I / K1 ) = 146 cm -1979
Free length of pile above ground (L1) = 0.00 cm
L1 / T = 0.00
Lf / T from fig-2 of IS 2911 (P1/S1)-1979 = 2
For fixed head pile, Lf =2 * T = 291 cm
STRUCTURAL DESIGN OF PILE:
Calculaton of Vertical Steel upto depth of Fixity:
Actual Compression load on the pile, P = 3.220 t
Actual Tension on the pile, T = 6.64 t
Actual Lateral load on the pile = 8.12 t
(I) For Compression and bending
Compression Load (P) = 3.2 t
Lateral load (Qh) = 8.1 t
Fixed end moment (Mf) = Qh*(L1 + Lf)/2 (From IS 2911 Part I/sec1)
Mf = 11.8 t-m
Moment reduction factor (m) = 0.95 (From IS 2911 Part I/sec1,
Actual moment on the pile (M) = 11.2 t-m Appendix B, fig 3A & 3B)
Cover to nominal reinforcement (dʹ) = 75 mm
Pile Diameter (D) = 400 mm
2
fck = 30 N/mm
KAPP-3,4/DC/29300/6002
PAGE NO :
DESIGN CALCULATIONS OF TOWER CRANE PILE FOUNDATION DESIGN REV. NO. : R0
fy = 500 N/mm2
Pu = 4.8 t (Pu=1.5 * P)
Mu = 16.9 t-m (Mu=1.5 * M)
dʹ/D = 0.188
Pu/ ( fck * D2 ) = 0.010
Mu/ ( fck * D3 ) = 0.088
From Chart 61 of SP-16 (Design Aids), pt = 0.09 f
ck
pt, required = 2.7 % (min) (Pt min = 0.4%)
2
Minimum reinforcement required = 3393 mm
Dia of main bar = 20
Number of bars required = 11.0
Provide lateral ties of 8mm dia at 200mm c/c.
(ii) For Tension and bending
Uplift (Qt) = 6.64 t
Lateral load (Qh) = 8.12 t
Actual moment on the pile (M) = 11.2 t-m
Pu = 10.0 t
Mu = 16.9 t-m
dʹ/D = 0.188
Tu/ (fck * Ac) = 0.026
Mu/ (fck * Ac* D) = 0.112
From Ghanekar and Jain charts, pt = 0.4 fck/fy
Pt, required = 2.4 % (min) (Pt min = 0.4%)
2
Minimum reinforcement required = 3016 mm
Dia of main bar = 20
Number of bars required = 10.0
Provide lateral ties of 8mm dia at 200mm c/c.
Curtailment of Vertical Steel beyond the depth of Fixity:
The moment due to lateral force is prevelant only upto depth of fixity.
Hence vertical reinforcement is curtailed beyond the depth of fixity of pile.
KAPP-3,4/DC/29300/6002
PAGE NO :
DESIGN CALCULATIONS OF TOWER CRANE PILE FOUNDATION DESIGN REV. NO. : R0
Depth of Fixity of Pile (Fixed head) = 2.92 m
Consider curtailment below 2.92 m to upto end of the pile
The reinforcement required beyond point of curtailment is calculated for maximum compression capacity
and minimum eccentricity of Pile.
For Compression and Bending due to Minimum eccentricity:
Ultimate Compression Load on Pile (Qult) = 1.5 x 3.22x 10 = 48.3 kN
Minimum Eccentricity = e = 20 mm
Moment acting due to minimum eccentricity = 48.3x1000x20 = 966000 N-mm
Cover to Main Reinforcement = dʹ = 75+8+12/2 = 89 mm
Diameter of bar provided = 12 mm
Diameter of Pile = D = 400 mm
Fck = 30 N/mm2
Fy = 500 N/mm2
Pu = 48300 N
Mu = 966000 N-mm
dʹ/D = 89/400 = 0.223
2
Pu/FckD = 48300/(30x400²) = 0.01
Mu/FckD3 = 966000/(30x400³) = 0.001
From Chart 61 of SP-16, p/Fck = 0.01
Percentage of steel required = 0.01x30 = 0.3 %
minimum % of steel as per CL 5.11.1 of IS2911 (P1/S1)-1979 0.4 %
Area of steel required = 0.4/100x3.14/4x400² = 503 mm2
No of 12 mm dia tor steel required = 5 Nos
No of 12 mm dia tor steel provided = 6.0 Nos
Area of steel provided = 679 mm2
Provide 8Y Stirups at spacing = 200 c/c
For Tension and Bending due to Minimum Eccentricity:
Ultimate Uplift capacity on Pile (Qult) = 1.5 x 6.64 x 10 = 99.6 kN
Ultimate Moment acting due to Min. Ecc. = 99.6x1000x20 = 1992000 N-mm
Cover to Main Reinforcement = dʹ = 75+8+12/2 = 89 mm
KAPP-3,4/DC/29300/6002
PAGE NO :
DESIGN CALCULATIONS OF TOWER CRANE PILE FOUNDATION DESIGN REV. NO. : R0
Diameter of bar provided = 12 mm
Diameter of Pile = D = 400 mm
Area of Concrete = Ac = 125664 mm2
Fck = 30 N/mm2
Fy = 500 N/mm2
Pu = 99600 N
Mu = 1992000 N-mm
dʹ/D = 89/400 = 0.223
Pu/(Fckxp/4xD2) = 99600/(30x3.14/4x400²) = 0.026
Mu/(Fckxp/4xD3) = 1992000/(30x3.14/4x400³) = 0.001
From Columns 2.2-F3 of Ghanekar & Jain , w = 0.05
Area of steel = wAcFck/Fy = 0.05x125664x30/500 = 377 mm2
Percentage of steel required = 0.3 %
No of 12 mm dia tor steel required = 4 Nos
No of 12 mm dia tor steel provided = 6 Nos
Area of steel provided = 679 mm2
Provide 8Y Stirups at spacing = 200 c/c
KAPP-3,4/DC/29300/6002