FIRE SAFETY MAINTENANCE SCHEDULE
CHECKED BY: YEAR OF:
LISTED FOR INSPECTION REMARKS
1. TEST smoke alarms.
2. TEST the fire alarm system.
3. CHECK Exposed sprinkler pipe hangers to ensure they
are in good condition
4. CHECK all sprinkler heads to ensure they free from
damage, corrosion, grease, and dust.
5. INSPECT fire department connections for caps, rust or
obstructions.
6. CONDUCT a fire pump flow test.
7. INSPECT all fire hose cabinets.
8. CONDUCT General engine maintenance for
emergency generator set.
9. CONDUCT Maintenance procedures for fire
extinguishers.
INSPECTOR'S SIGNATURE_______________ SUPERVISOR'S SIGNATURE_______________
T.Y COMPOSITE INTERNATIONAL CORPORATION
TECO Industrial Park Ninoy Aquino Highway
Bundagul Mabalacat City Pampanga 2010.
FIRE SAFETY MAINTENANCE SCHEDULE
CHECKED BY: FOR THE MONTH OF:
LISTED FOR INSPECTION REMARKS
1. INSPECT All doors in fire separations.
2. INSPECT And TEST emergency lighting system , batteries
units and lamps.
3. INSPECT all portable fire extinguishers.
4. TEST the operability of interconnected smokes and pull
station by testing atleast one smoke alarm.
5. TEST Fire alarm system amd check all components
including standby power batteries.
6. TEST Alarm for the sprinkler system by flowing water.
7. INSPECT sprinkler valves are electrically supervised.
8. TEST sprinkler water flow devices.
9. INSPECT and clean breathers, Governors and linkages on
emergency generator sets.
INSPECTOR'S SIGNATURE_______________ SUPERVISOR'S SIGNATURE_______________
T.Y COMPOSITE INTERNATIONAL CORPORATION
IMPROVEMENT PROJECT COST
Project Description: Guard house gate 2 Requesting Dept.: Maintenance
Date of Requisition: July 3, 2021 Project plan no.:
Date need: Date Start:
Date accomplishment:
No. Description Quantity Unit price Amount Supplier
1 Cement 15 pcs
2 Sliding window 2 pcs P 3400
3 skimcoat 1 pc
4 Flat latex white 1 tim
5 deform bar 20 pcs
6 sand 1 elf
prepared by: Received by:
Donis vicente____ Victor B. Sicat___
maintenance staff Purchasing manager
Check by: Approved by:
Robert Auro_____ Yukimasa Nishida___
Maintenance Manager General manager