The document describes a fixed buffer stop system with a concrete base foundation that is used to safely stop trains. It consists of long stroke gas-hydraulic buffers mounted on a reinforced concrete base. The buffers are designed to absorb impact energy and allow for a controlled reduction in train speed. The concrete base allows for customization and reduced costs compared to all-steel designs. Simulation analysis is used to validate the performance of the buffer stops under different train speeds and masses.

Uploaded by

Shahryar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
735 views2 pages

Rail Buffer Stops for Engineers

The document describes a fixed buffer stop system with a concrete base foundation that is used to safely stop trains. It consists of long stroke gas-hydraulic buffers mounted on a reinforced concrete base. The buffers are designed to absorb impact energy and allow for a controlled reduction in train speed. The concrete base allows for customization and reduced costs compared to all-steel designs. Simulation analysis is used to validate the performance of the buffer stops under different train speeds and masses.

Uploaded by

Shahryar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Product Overview: Describes buffer stop construction, installation, and benefits for railway systems.
  • Example Application and Specifications: Illustrates application examples and provides detailed specifications of buffer stops.

FIXED BUFFER STOP

WITH CONCRETE BASE FOUNDATION


Rail

FIXED BUFFER STOPS PRODUCT DETAILS PRODUCT ADVANTAGES


Long length gas-hydraulic buffers can be • Appropriate for mainline, depot and Oleo gas-hydraulic buffers are optimised
used to offer a fixed, fully recoverable test track applications. specifically for each application, offering
installation and maximum protection to maximum efficiency to minimise
• Used in conjunction with a buffering
passengers with reduced deceleration rates. installation distances. The long stroke
beam or buffering trolley designed to
buffers offer reduced and controlled
interface correctly with the rolling
Oleo hydraulic energy absorption systems deceleration rates and all projects are
stock.
are used to dissipate the impacting energy accompanied by validated simulation
supported on a concrete base foundation. • Design variances for both centre graphs to give detailed analysis of the
coupling impacts and side buffering buffer and train performance upon
impacts. impact.
• Gas-hydraulic buffers installed in Additional advantages include:
embedded steel mounts and set in a
reinforced concrete base foundation. • Ability to self reset after impact,
reducing overall lifetime costs
compared to sliding devices.
Site supervision and training
provided by Oleo professional engineers • Concrete base foundation allows the
for the installation of buffer stops. customer to customise the design
suitable for their requirements and
can reduce the overall cost
compared to a full steel structure.
• Purely mechanical device – no power
or manual control required.
• Minimal maintenance required.
• Long service life.
• Additional configuration options
available including electrical
insulation, painting and
galvanisation.
• DigitalTrains’ sophisticated simulation
capability can be used to understand
how the train interfaces with rail
infrastructures, such as buffer stops.
FIXED BUFFER STOP WITH CONCRETE BASE FOUNDATION DESIGNS
EXAMPLE APPLICATION Rail

L (Installation Length)
H (Height of coupler)

Reflecting Sign
(Red)

+
- 0.00 (Top of rail)

SPECIFICATION
• Contains 1 off 'buffing trolley', two long stroke hydraulic
buffers and one set of steel embedded part.

• Reinforced concrete base for steel embedded part.

• Impacting point from the top of rail (coupler height) mm


(720 – 660 – 824).

Examples for conditions and installation length:

Configuration Buffer Stop Type Train mass Impacting speed Installation length Impact capacity Recoverable stroke

8 Cars Type 730 510t 12km/h 9.5m 3360kJ 3000mm

8 Cars Type 724 300t 14km/h 8m 2688kJ 2400mm

6 Cars Type 724 380t 13km/h 8m 2688kJ 2400mm

6 Cars Type 724 220t 16km/h 8m 2688kJ 2400mm

Email: [email protected] Tel: +44 (0)24 7601 5140

Incorporating Oleo world leading www.oleo.co.uk www.oleo.cn www.oleo.co.in www.digitaltrains.online LEADING THE WORLD
Gas Hydraulic Technology Metric Issue 2 – December 2019 IN TRAIN SIMULATION SOFTWARE

You might also like