0% found this document useful (0 votes)
58 views5 pages

03 - 04 - Estimate Time and Cost

TIME AND COST ESTIMATION
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views5 pages

03 - 04 - Estimate Time and Cost

TIME AND COST ESTIMATION
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Project Management Foundations: Small Projects

with Bonnie Biafore

Office Relocation Project


Optimistic Most Likely Pessimistic Labor Equipment and Other Non-Time-
Materials Total Cost Avg. Labor Rate
Hours Hours Hours Cost Facilities Based Cost

$100

Find new office space 30 40 60 $4,000 $4,000

Define office requirements 8 12 16 $1,200 $1,200

Design office layout 8 12 20 $0 $0

Negotiate and sign lease 6 8 16 $800 $800

Obtain construction Construction


40 80 120 $0 $4,000 $4,000
permit permit

Build out space 40 60 80 $0 $0

Walk through office space 2 4 6 $400 $400

Correct build-out issues 8 16 24 $0 $0

Approve build-out 2 2 2 $200 $200

Identify network
4 8 12 $800 $800
requirements

Design network 8 16 24 $1,600 $1,600

Review network design 2 4 8 $400 $400

Project Management Foundations: Small Projects with Bonnie Biafore

1 of 3
Install and configure Network
8 16 24 $1,600 $3,000 $4,600
network equipment

Test network 4 6 16 $600 $600

Identify phone system


4 8 12 $800 $800
requirements

Design phone system 8 16 24 $1,600 $1,600

Review phone system


2 4 8 $400 $400
design

Install and configure


8 16 24 $1,600 $5,000 $6,600 Phone system
phone system

Test phone system 4 6 16 $600 $600

Identify software
8 12 16 $1,200 $1,200
requirements

Specify software and


8 16 24 $1,600 $1,600
configuration

Review software plan 2 4 8 $400 $400

Install and configure


16 20 24 $2,000 $5,000 $7,000 Software
software

Test software 8 16 24 $1,600 $400

Project Management Foundations: Small Projects with Bonnie Biafore


2 of 3
Negotiate and sign IT
6 8 16 $800 $800
contract

Identify internet
4 6 8 $600 $600
requirements

Sign up for internet service 2 4 8 $400 $400

Test internet service 8 12 16 $1,200 $1,200

Approve IT systems 2 2 2 $200 $200

260 434 658 $26,600 $13,000 $0 $4,000 $43,600