Project: K028-Fayyhealth-Polyclinic Risk Assessment For Slab Coring Work

The document is a risk assessment for slab coring work at the K028-FAYYHEALTH-POLYCLINIC project. It identifies potential hazards like falls, fire, noise/dust, and required training. It lists 4 activities with risks: 1) manual handling of coring machines, 2) operating coring machines, 3) electrocution during operation, and 4) concrete coring causing dust/spills. Controls include training, PPE, inspection of equipment, barricading work areas, and good housekeeping. The assessment rates risks and assigns responsibilities to the project engineer, safety officer, and foreman to implement controls.

Uploaded by

adeniyi abiola
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views5 pages

Project: K028-Fayyhealth-Polyclinic Risk Assessment For Slab Coring Work

The document is a risk assessment for slab coring work at the K028-FAYYHEALTH-POLYCLINIC project. It identifies potential hazards like falls, fire, noise/dust, and required training. It lists 4 activities with risks: 1) manual handling of coring machines, 2) operating coring machines, 3) electrocution during operation, and 4) concrete coring causing dust/spills. Controls include training, PPE, inspection of equipment, barricading work areas, and good housekeeping. The assessment rates risks and assigns responsibilities to the project engineer, safety officer, and foreman to implement controls.

Uploaded by

adeniyi abiola
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

PROJECT: K028-FAYYHEALTH-POLYCLINIC

RISK ASSESSMENT FOR SLAB CORING WORK

NO of
ASSESSMENT,
PROJECT/CONTRACT ACTIVITY ASSESSMENT REVIEWED
BY: BY: REVISION &
DATE

PROJECT: K028-FAYYHEALTH-POLYCLINIC

CLIENT: MR SALEM SAIF MOHAMED SEED AL MAZROUEI SLAB CORING SE PM CH/RA/01


WORK
CONSULTANT: AL BAHRI ENGINEERING CONSULTANACY REV: 00

MAIN CONTRACTOR: CHERWELL INTERIOR DECORATION 09/06/2022


LLC.

PREPARED BY: APPROVED BY: APPROVED BY:

ABIOLA FREDERICK ADENIYI PROJECT MANAGER AL BAHRI ENGINEERING

HSE OFFICER CONSULTANACY

CHERWELL HSE DEPARTMENT/[Link]-NO- 01/00 SLAB CORING RISK ASSESSMENT


PROJECT: K028-FAYYHEALTH-POLYCLINIC
RISK ASSESSMENT FOR SLAB CORING WORK

POTENTIAL HAZARDS/CONDITIONS TO BE CONSIDERED

Deep Excavations Work on over water Falls from height X Fire risk High winds

Demolition Confined space Falls from level ground Noise/Dust/Vibration X Adverse

Plant/Machinery X Working Platforms X Slips/Tripping X Fumes Environmental risk

Lifting Operations X Manual Handling X Fuel Storage Traffic X Training Required

Buried/Overhead Service COSHH Storage/Lay Down Area Ground Conditions Health surveillance

NO ACTIVITY HAZARD IDENTIFIED AT RISK L S R CONTROL MEAUSRES L S R ACTION BY:


DESCRIPTION (PEOPLE/PROPERTY)

1. Manual handling of Muscle pain, Back Pain, Moditif Technicians. 2 3 4  TBT to be conducted by work supervisor to 1 2 2 P.E, S.O and
concrete coring Back injury all workers before work start. Foreman
machine Properties  Ensure Manual handling training is in place.
 Use manual handling techniques in lifting
heavy equipment e.g., 2 people must carry
this coring machine to divide the total weight
of this machine thus making it lighter and
easier to carry.
 Barricade the work zone for maximum radius
 Place relevant safety signs.
 Full PPE to be comply, Hard hat, safety
shoes, safety glasses and cut resistant gloves
and dust mask.
2 Concrete coring Muscle pain Operator, Workers, and 2 3 6  Only trained and authorized person must 1 2 2 P.E, S.O &
machine operator Property damage operate this machine. Foreman
 Visually inspect the wires and cables for any
defects or ties to avoid short circuit.
 Technicians must keep the electrical cord

CHERWELL HSE DEPARTMENT/[Link]-NO- 01/00 SLAB CORING RISK ASSESSMENT


PROJECT: K028-FAYYHEALTH-POLYCLINIC
RISK ASSESSMENT FOR SLAB CORING WORK

away from moist surface to prevent its


accidental contact with water which can
caused electrocution.
3 Concrete coring Electrocution Operator, workers, and 3 3 9  Visually inspect the wires and cables for any 1 2 2 P.E, S.O &
machine operation property damage defects or ties to avoid short circuit. Foreman
 Technicians must keep the electrical cord
away from moist surface to prevent its
accidental contact with water which can
caused electrocution.
 Proper PPE should be provided for all
workforces.
 ELCB is compulsory for electrical usage
 Power supply points to be identified & get
approval from DWTC management before
using.
4 Concrete/Slab Dust / Spill of drilling Moditif Workforce, Trip 2 3 6  Barricade the work areas & maintain good 1 2 2 P.E, S.O &
Coring. fluid & slip housekeeping Foreman
 Wear appropriate PPE according to the job
Environmental Affect descriptions like, helmets dust mask, gloves,
and goggles.
 Ensure that there is a proper protection on
the area to prevent water spillage on the
floor.
 Place polyethylene material on the wall or in
the floor prior to coring operation, drip try to
be available
5 Concrete Coring Coring noise, Workers, Public. 2 3 6  Continuous use of machinery must be 1 2 2 P.E, S.O &
Machine Operation Environmental affect minimized. Foreman
 Wear appropriate PPEs like wear muffs or
ear plugs
6 Working at height on Personnel/ Objects fall Workers, Public & 3 3 9  Ensure scaffold platform is erected and 1 2 2 P.E, S.O &
scaffold platform from height/property property damage. inspected by the authorized personnel. Foreman
 All tools must be secured.
 Only trained personnel to work on scaffold
platform.

CHERWELL HSE DEPARTMENT/[Link]-NO- 01/00 SLAB CORING RISK ASSESSMENT


PROJECT: K028-FAYYHEALTH-POLYCLINIC
RISK ASSESSMENT FOR SLAB CORING WORK

 Workplace supervisor is responsible for


ensuring the safe access from ground to work
area
 Continuous monitoring by the supervisor.
 Restrict other parts entry into workplace
without PPE like helmet, safety harness,
goggles & safety shoes.
7 Working near Damage to live Utilities, Moditif Workers, Public 2 3 6  Maintain good housekeeping 1 2 2 P.E, S.O &
utilities and Property damage.  Ensure all personnel are aware the risk Foreman
Slip, Trip, & Fall involved in workplace.
Injuries.  Close monitoring by the supervisor
 Ensure access and egress are free from
obstruction.
 Conduct TBT to ensure all employees are
aware of the hazards in the workplace and
emergency procedure
 Wear appropriate PPE like helmet, goggles,
and safety shoes.

CHERWELL HSE DEPARTMENT/[Link]-NO- 01/00 SLAB CORING RISK ASSESSMENT


PROJECT: K028-FAYYHEALTH-POLYCLINIC
RISK ASSESSMENT FOR SLAB CORING WORK

LIKELIHOOD RISKIN RATING The above risk assessment has been briefed as fully understood
RISK 3 2 1 SEVERITY
RATING Name Sign
3 Major/injury/pollution/Damage
S Name Sign
2 Minor/Pollution/Damage/Loss
E Name Sign
1 Injury/Low Damage/Loss
V 3 9 6 3 Name Sign
LIKELIHOOD
E
3 Likely Name Sign
R 2 6 4 2
2 Possible Name Sign
I
1 Never/Very Unlikely Name Sign
T 1 3 2 1

Name of person given risk assessment briefing

Name Date:

Signature Time

CHERWELL HSE DEPARTMENT/[Link]-NO- 01/00 SLAB CORING RISK ASSESSMENT