Box Culvert Quantities For Proposed Culverts
Design Culvert Size
[Link] Str. No Existing New Acutal Size of
Chainage Chainage Box Culvert
Width of FRL TO Height of
No of cells
culvert GL DIFF. culvert
1 1 87.691 1.500 1 3.00 2.31 3.00 1X3X3
2 2 86.208 2.985 1 3.00 -0.10 2.50 1 X 3 X 2.5
3 3 85.050 4.150 1 3.00 0.16 3.00 1X3X3
4 4 84.017 5.180 1 2.00 0.62 2.00 1X2X2
5 5 80.473 8.667 1 3.50 5.39 3.00 1 X 3.5 X 3
6 6 80.153 8.976 1 3.00 2.01 3.00 1X3X3
7 7 79.795 9.332 1 3.00 2.25 3.50 1 X 3 X 3.5
8 8 78.919 10.196 1 3.00 0.68 3.00 1X3X3
9 9 75.8 13.307 1 4.00 0.84 3.00 1X4X3
10 10 75.480 13.624 1 2.00 0.58 2.00 1X2X2
11 11 75.241 13.862 1 4.00 2.16 3.00 1X4X3
12 12 74.000 14.880 1 3.00 1.80 4.00 1X3X4
13 13 72.896 15.972 1 2.50 2.22 2.50 1 X 2.5 X 2.5
14 14 70.789 18.818 1 3.00 1.54 3.00 1X3X3
15 15 0.630 0.630 1 3.00 0.37 3.00 1X3X3
16 16 - 16.282 2 2.00 2.22 2.50 2 X 2 X 2.5
17 17 - 16.450 2 2.00 2.22 2.50 2 X 2 X 2.5
18 18 - 16.615 2 2.00 2.22 2.50 2 X 2 X 2.5
19 19 - 17.352 3 3.00 2.22 2.00 3X3X2
20 20 - 18.350 3 3.00 2.22 2.00 3X3X2
Dimensions of Box Culvert
Concrete
Length of C/S width of Qty per mt
Box in m Box in m in Cum
Top slab Ext. Wall Int. Wall Bottom
Size of Haunch
Thk. Thk. Thk. Slab Thk.
0.250 0.250 0.000 0.300 0.150 0.150 3.500 21.00 5.833
0.250 0.250 0.000 0.300 0.150 0.150 3.500 15.00 5.583
0.250 0.250 0.000 0.300 0.150 0.150 3.500 15.00 5.833
0.250 0.250 0.000 0.250 0.150 0.150 2.500 16.00 4.136
0.300 0.300 0.000 0.350 0.150 0.150 4.100 15.00 7.037
0.250 0.250 0.000 0.300 0.150 0.150 3.500 15.00 5.833
0.250 0.250 0.000 0.300 0.150 0.150 3.500 15.00 6.083
0.250 0.250 0.000 0.300 0.150 0.150 3.500 15.00 5.833
0.350 0.350 0.000 0.400 0.150 0.150 4.700 15.00 8.302
0.250 0.250 0.000 0.250 0.150 0.150 2.500 15.00 4.136
0.350 0.350 0.000 0.400 0.150 0.150 4.700 15.00 8.302
0.250 0.250 0.000 0.300 0.150 0.150 3.500 15.00 6.333
0.250 0.250 0.000 0.270 0.150 0.150 3.000 15.00 4.989
0.250 0.250 0.000 0.300 0.150 0.150 3.500 15.00 5.833
0.250 0.250 0.000 0.300 0.150 0.150 3.500 15.00 5.833
0.250 0.250 0.250 0.250 0.150 0.150 4.750 15.00 7.837
0.250 0.250 0.250 0.250 0.150 0.150 4.750 15.00 7.837
0.250 0.250 0.250 0.250 0.150 0.150 4.750 15.00 7.837
0.250 0.250 0.250 0.300 0.150 0.150 10.000 15.00 14.385
0.250 0.250 0.250 0.400 0.150 0.150 10.000 15.00 14.235
HYSD Qty Total
per mt in Concrete Qty Total Steel
Cum in Cum Qty in MT
0.525 122.48 11.02
0.502 83.74 7.54
0.525 87.49 7.87
0.372 66.17 5.96
0.704 105.55 10.55
0.525 87.49 7.87
0.547 91.24 8.21
0.525 87.49 7.87
0.747 124.53 11.21
0.372 62.03 5.58
0.747 124.53 11.21
0.570 94.99 8.55
0.449 74.84 6.74
0.525 87.49 7.87
0.525 87.49 7.87
0.705 117.56 10.58
0.705 117.56 10.58
0.705 117.56 10.58
1.295 215.78 19.42
1.281 213.53 19.22
Project: Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for NH-166F from Mahad Junction (at Km 123/400 on
up to Chitta Darwaja, Pachad to Tomb of Jijaumata, and Hirkaniwadi Connector in the state of Maharashtra on Engineering, Procurement & Const
Contract (Length km-25.609) (Balance work)
Earth Work Excavation For
Protection works for Flat
Backfilling with selected
Retaining Wall Steel Qty
Protection work for Toe
Retaining wall Concrete
Curtain wall Garde M15
Box Concrete Quantity
Quantity (M25 Grade)
M40 Grade RCC Crash
PCC below Flat Apron
apron (300thk stone)
M15 Grade Concrete
Protection work for
wall Garde M15
Box Steel Qty
(M30 Grade)
Foundation
cast-in-situ
Barrier
(M15)
Chainage
earth
[Link]
Cum Cum Cum Cum Cum MT Cum Cum Cum Cum Cum MT
1 1.5 501.98 14.49 622.49 122.48 72.04 11.02 2.26 28.05 14.03 52.47 28.707 5.763
2 2.985 421.58 12.89 313.39 83.74 55.84 7.54 2.26 21.09 10.55 45.82 23.841 4.468
3 4.15 490.47 14.35 444.64 87.49 72.04 7.87 2.26 28.05 14.03 52.47 28.707 5.763
4 5.18 322.61 10.18 214.00 66.17 41.07 5.96 1.62 12.69 6.35 35.39 18.976 3.286
5 8.667 602.30 20.15 459.90 105.55 136.58 10.55 19.82 30.96 15.48 55.41 29.193 10.926
6 8.976 490.47 14.35 444.64 87.49 72.04 7.87 2.26 28.05 14.03 52.47 28.707 5.763
7 9.332 560.72 15.81 598.39 91.24 89.66 8.21 2.26 35.91 17.96 59.11 33.572 7.173
8 10.196 490.47 14.35 444.64 87.49 72.04 7.87 2.26 28.05 14.03 52.47 28.707 5.763
9 13.307 548.77 16.27 475.31 124.53 73.71 11.21 3.04 33.95 16.97 58.35 29.680 5.896
10 13.624 320.66 9.91 200.63 62.03 41.07 5.58 1.62 12.69 6.35 35.39 18.976 3.286
11 13.862 548.77 16.27 475.31 124.53 73.71 11.21 3.04 33.95 16.97 58.35 29.680 5.896
12 14.88 632.31 17.28 774.64 94.99 108.70 8.55 2.26 44.67 22.34 65.75 38.438 8.696
13 15.972 403.97 12.13 310.31 74.84 55.84 6.74 1.94 19.62 9.81 43.93 23.841 4.468
14 18.818 490.47 14.35 444.64 87.49 72.04 7.87 2.26 28.05 14.03 52.47 28.707 5.763
15 0.63 490.47 14.35 444.64 87.49 72.04 7.87 2.26 28.05 14.03 52.47 28.707 5.763
16 16.282 457.46 14.79 308.25 117.56 55.84 10.58 3.07 24.77 12.38 50.57 23.841 4.468
17 16.45 457.46 14.79 308.25 117.56 55.84 10.58 3.07 24.77 12.38 50.57 23.841 4.468
18 16.615 457.46 14.79 308.25 117.56 55.84 10.58 3.07 24.77 12.38 50.57 23.841 4.468
19 17.352 555.93 21.31 204.64 215.78 41.07 19.42 6.46 30.24 15.12 63.85 18.976 3.286
20 18.35 572.21 21.31 212.66 213.53 41.07 19.22 6.46 30.24 15.12 63.85 18.976 3.286
Total 9816.55 304.10 8009.60 2169.51 1358.11 196.31 73.53 548.67 274.34 1051.69 527.91 108.65
ion (at Km 123/400 on NH-66) to Raigad fort
, Procurement & Construction (EPC) Basis
Filter Media behind Abutment
Filter Media below stone
Structure Number
Weep Holes No's
Flexible Apron
Stone Pitching
No's Cum Cum Cum pitching Cum No's
46 98.02 32.10 16.05 83.36 2
30 61.35 22.14 11.07 73.24 2
46 73.54 32.10 16.05 83.36 2
18 52.46 14.02 7.01 56.36 2
46 93.75 33.19 16.60 88.43 2
46 73.54 32.10 16.05 83.36 2
64 86.16 43.90 21.95 93.49 2
46 73.54 32.10 16.05 83.36 2
46 75.73 34.31 17.15 93.49 2
18 49.58 14.02 7.01 56.36 2
46 75.73 34.31 17.15 93.49 2
84 99.21 57.54 28.77 103.61 2
30 61.35 22.14 11.07 69.86 2
46 73.54 32.10 16.05 83.36 2
46 73.54 32.10 16.05 83.36 2
30 61.35 22.14 11.07 81.68 2
30 61.35 22.14 11.07 81.68 2
30 61.35 22.14 11.07 81.68 2
18 49.58 14.02 7.01 106.99 2
18 49.58 14.02 7.01 106.99 2
784.00 1404.30 562.60 281.30 1687.50 40.00