Laporan Pemeliharaan Panel Listrik

The document is a maintenance checklist for electrical panels. It lists 67 panels across various floors and locations of a building. It includes items to check such as voltage measurements, current measurements, cable temperatures, ground resistance, and visual inspections of components. The target is to check 22 panels per month or 6 panels per week.

Uploaded by

AdentzSony
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
134 views5 pages

Laporan Pemeliharaan Panel Listrik

The document is a maintenance checklist for electrical panels. It lists 67 panels across various floors and locations of a building. It includes items to check such as voltage measurements, current measurements, cable temperatures, ground resistance, and visual inspections of components. The target is to check 22 panels per month or 6 panels per week.

Uploaded by

AdentzSony
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Maintenance Panel Listrik

Dilakukan oleh:
Tanggal Pemeriksaan:
Nama Panel:

Tanggal :
Sub
No. Item Pekerjaan Item Nilai Limit Kondisi Catatan khusus
1 Pengukuran Tegangan R-S ………....V 380 V (-5%/+10%)
S-T ………....V 380 V (-5%/+10%)
R-T ………....V 380 V (-5%/+10%)
R-N ………....V 220 V (-5%/+10%)
S-N ………....V 220 V (-5%/+10%)
T-N ………....V 220 V (-5%/+10%)
2 Pengukuran arus beban R ………….A Max 85% X In
S ………….A Max 85% X In
T ………….A Max 85% X In
N ………….A Must be 0
Gnd ………….A Must be 0
3 Pengukuran temperature kabel R ………...°C < 65°C
S ………...°C < 65°C
T ………...°C < 65°C
N ………...°C < 65°C
Pengukuran Tahanan Kabel Grounding ke Body Gnd-
4 Panel PEN ……Ohm < 5 Ohm
5 Pemeriksaan Fisik
Kunci Panel
Inner Cover Panel
Separator antar fasa pada breaker
Exhaust Fan Panel
Keadaan Panel
Bekas Terbakar
Baut/Cable Shoe/Lug
Peralatan indicator (Lampu Indikator, Analog
Meter)
Gland Packing Kabel/Cable Duct
Dilakukan oleh, Diperiksa oleh,
Teknisi Koordinator teknisi
NO Panel Nama Panel
Lantai 2
31 PP. AMS Power panel area manajemen & staff
32 PP. IU AC-2/3 Power panel indoor unit AC lt.2-3
33 PP. ICU Power panel ICU
34 PP. CSSD Power panel ( Central sterile supply departement )
35 PP. IU AC-2/2 Power panel indoor unit AC lt.2-2
36 PC. OK-1/2 Panel control ruang operasi 1 lantai 2
37 [Link]-2/2 Panel control ruang operasi 2 lantai 2
38 PP. AC OK Power panel AC ruang OK
39 PP. OPS Power panel area operasi
40 PP. RAD Power panel ruang radiologi
41 PP. IU AC-2/1 Power panel indoor unit AC lt.2-1
42 PP. RMH Power panel rehab medik
43 SDP. 2 Sub distribution panel lantai 2
44 PP. 2 Power panel lantai 2
45 PP. UPS-2 Power panel Uninterupted power supply lt. 2
Lantai 3
46 PP. 3 Power panel lantai 3
47 PP. AC-3 Power panel AC lantai 3
48 PP. UPS-3 Power panel Uninterupted power supply lt. 3
49 PP. OU VRV Power panel outdoor unit VRV
50 PP. Lift Power panel lift-1
Lantai 4
51 PP. 4 Power panel lantai 3
52 PP. AC-4 Power panel AC lantai 3
53 PP. UPS-4 Power panel Uninterupted power supply lt. 3
Rooftop
54 SDP. Atap
55 PP. Atap
56 PP. Lift-2
57 PP. FAN
58 PP. WH
59 PP. BP
60 PP. DW
61 PP. Lift-3
62 PP. lift-1
63 Panel Masjid
64 Panel Sumpit Masjid
65 Panel IPSRS
66 Panel MDR
67 Panel Sumpit MDR
67 Unit Panel
Target Perbulan 22 Unit Panel
Perminggu 6 Unit Panel
NO Tangal Nama Panel Dokumen
1 06-07-2022 PP. Ground Ada
2 06-07-2022 Panel sumpit 3 Ada
3 06-07-2022 Panel sumpit 2 Ada
4 06-07-2022 SDP. ground Ada
5 06-07-2022 Panel Sumpit 1 Ada
6 14-07-2022 PP. MCU Ada
7 14-07-2022 PP. IU AC 1/1 Ada
8 14-07-2022 PP. PNI Ada
9 14-07-2022 PP. PA Ada
10 14-07-2022 PP. IU AC 1/3 Ada
11 14-07-2022 PP. IGD Ada
12 14-07-2022 PP. IU AC 1/2 Ada
13 14-07-2022 PP. PI Ada
14 20-07-2022 PP. IU AC G2 Ada
15 20-07-2022 PP. IG Ada
16 20-07-2022 PP. IU AC G1 Ada
17 20-07-2022 PP. JNH Ada
18 23-07-2022 PP. ENG Ada
19 23-07-2022 SDP. UPS Ada
20 23-07-2022 PP. IDR Ada
21 23-07-2022 PP. GM Ada
22 28-07-2022 PP. Rumah Singgah Ada
23 28-07-2022 Sumpit MDR / Rumah Singgah Ada
24 30-07-2022 SDP MG Ada