DETAILS OF TRANSMISSION LINE TOWER
1. 400KV/220KV TOWERS:
Voltage Class & No. of Circuits
Tower Type
400KV DC
400KV SC
0.2
0.15
0.30
0.60
Total height above ground level in Mtr.
46.3
46.0
46.0
Height of Bottom cross arms in mtr.
26.3
22.3
Base width of Ground Lelvel
10.4
13.6
Angle of Deviation
200KV DC
0.2
0.15
0.30
0.60
46.0
31.0
31.0
31.0
22.3
22.3
26.3
22.3
14.6
14.6
8.1
10
200KV SC
0.2
0.15
0.30
0.60
0.2
0.15
0.30
0.60
31.0
32.8
32.6
33.0
33.1
27.4
27.0
27.4
27.9
22.3
22.3
22.3
17.5
14.9
14.9
17.6
14.9
14.9
14.1
10.1
10.7
5.95
8.5
9.9
10.6
4.2
6.6
6.8
8.1
Approximate Conductor spacing in Mtr.
Vertical
8.0
8.0
8.0
8.0
4.9
4.9
5.0
5.0
5.1
5.6
14.8
17.3
18.3
19.2
11.0
11.6
12.2
13.5
9.2
10.0
11.2
10.4
8.8
8.6
9.5
9.7
Normal Tower inclding stubs
9.0
1.5
18.0
23.0
6.0
8.5
9.5
12.6
3.4
5.3
6.2
7.6
2.8
2.8
3.9
4.6
Blot & Nuts
0.4
0.5
0.6
0.7
0.3
0.4
0.4
0.5
0.2
0.2
0.3
0.3
0.1
0.1
0.2
0.2
87.0 155.0
57.0 110.0
Horizantal
Approximate Tower Weight in MT
Approximate foundation volumes in CMT for normal & dry soil foundation
Earth Excavation
16.0 146.0 170.0 300.0
Cement Concrete
6.0
14.0
21.0
23.0
Reinforcement required in MT
0.4
0.6
1.1
2.6
40.0
56.0
32.0
48.0
28.0
30.0
36.0
58.0
4.1
7.0
9.5
16.5
3.6
5.4
6.8
10.9
3.8
4.0
4.8
7.0
0.6
12.0
2. 110KV & 66KV TOWERS:
Voltage Class & No. of Circuits
110KV DC
110KV SC
66KV DC
Tower Type
Angle of Deviation
0-2
0-15
0-30
0-60
0-2
0-15
0-30
0-60
Total height above ground level in Mtr.
24.5
24.7
26.6
24.9
21.5
21.5
21.6
Height of Bottom cross arms in mtr.
15.1
13.4
13.4
13.4
15.1
13.4
13.4
4.3
5.4
6.0
7.2
3.4
3.6
Vertical
3.2
3.2
3.2
3.3
3.2
Horizantal
6.0
6.0
6.8
8.8
5.6
2.0
3.2
3.3
4.7
0.05
0.1
0.1
0.2
Base width of Ground Lelvel
66KV SC
0-2
0-15
0-30
0-60
0-2
0-15
0-30 0-60
22.5
19.4
15.9
19.4
20.6
16.8
17.1
17.1
17.2
13.4
12.6
11.4
11.4
11.4
12.3
11.7
11.7
11.7
4.6
5.4
4.2
5.2
5.3
5.8
2.5
3.4
4.3
4.7
3.2
3.2
3.2
2.3
2.1
2.2
2.4
2.1
2.2
2.3
2.3
4.6
5.8
7.4
4.2
4.4
4.8
6.2
3.7
3.7
4.2
5.4
1.5
2.1
2.3
3.0
1.3
16
1.9
2.6
1.1
1.4
1.6
2.0
0.05
0.1
0.1
0.2
0.05
0.07
0.07
0.2
0.05
0.06
0.07
0.1
Approximate Conductor spacing in Mtr.
Approximate Tower Weight in MT
Normal Tower inclding stubs
Blot & Nuts
Approximate foundation volumes in CMT for normal & dry soil foundation
Earth Excavation
24.0
37.0
45.0
67.0
21.0
24.0
29.0
44.0
15.0
21.0
28.0
42.0
18.0
22.0
25.0
36.0
Cement Concrete
2.40
3.40
4.4
7.7
2.2
2.3
2.8
4.3
1.6
2.1
2.7
4.1
2.6
3.0
3.2
4.6
Reinforcement required in MT