Gavhan Plaza Toll System Overview

The document provides the scope of work for an infrastructure project including: 1) Design, supply, installation, testing and commissioning of intelligent transportation systems, toll management systems, traffic management systems, security surveillance, electrical power systems, highway illumination, and more. 2) Construction of administrative buildings, toll plazas, truck laybys, and other miscellaneous structures. 3) Civil works like approach roads, ramps, and service roads. The scope of work covers all necessary electrical, mechanical, and civil works for bridges, buildings, substations and other infrastructure elements of the project.

Uploaded by

tariq1987
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
313 views12 pages

Gavhan Plaza Toll System Overview

The document provides the scope of work for an infrastructure project including: 1) Design, supply, installation, testing and commissioning of intelligent transportation systems, toll management systems, traffic management systems, security surveillance, electrical power systems, highway illumination, and more. 2) Construction of administrative buildings, toll plazas, truck laybys, and other miscellaneous structures. 3) Civil works like approach roads, ramps, and service roads. The scope of work covers all necessary electrical, mechanical, and civil works for bridges, buildings, substations and other infrastructure elements of the project.

Uploaded by

tariq1987
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Scope of Work

Design, Supply, Installation, Testing & Commissioning of following (ERG 34);


1) Intelligent Transportation System (ITS)
2) Toll Management System (TMS)
3) Traffic Management System and associated Fiber Optic System (ATMS)
4) Security Surveillance at all Substations, Toll plazas, Administrative Buildings.
5) Electrical Powering System with SCADA Automation System
6) Powering of Fire Fighting, Dehumidification and Navigational Aids
7) Highway Illumination System and Providing Specified Aesthetic Lighting and Controls
8) Design and Construction of Administrative Buildings including Command Control Centre with State of Art
Interiors, Furnitures and Mechanical, Electrical, Plumbing and Fire Fighting (MEPF) Services.
9) Design and Construction of Toll Plazas with associated Mechanical, Electrical, Plumbing and Fire Fighting
(MEPF) Services
10) Truck and Toll Laybys Facilities

Brief Scope of work


1. Intelligent Transportation System (ITS)
a. Information gathering from Toll Management System (TMS) and Advance Traffic Management
System (ATMS) continually to forecast
b. Handling Congestion on MTHL
c. Diversion on MTHL if any
d. Slow speed warning
e. Weather forecasts
f. Travel Time forecasts
g. Inform respective agencies like patrolling and medical team to attend to emergencies
h. Assist the Traveler during travel on MTHL and manage major incidents.
2. Toll Management System (TMS)
a. Hybrid ETC Lane Equipment
b. Data Communication System
c. Plaza Computer System
d. Traffic Control Center Requirements
e. Toll Plaza Equipment
3. Traffic Management System
a. Traffic Control Centre System
b. Emergency Call Box
c. Traffic Surveillance and Closed-Circuit Television System
d. Automatic Traffic Counter-Cum-Classifier System
e. Meteorological Observation System
f. Variable Message Sign Sys tem
g. Digital Transmission System
h. Fiber Optic Cable System
i. Power Conditioning Equipment System
j. Control Center System Equipment Software
k. Closed Circuit Television for Toll Management System
l. Network Equipment
[Link] (OFC, power)
n. Power Supply System
o. Other Related Requirements, if any.
4. Security Surveillance at all substations, Toll plazas and Administrative Buildings
a. Providing Video cameras, its housing and pan, and Tilt Heads mounted at a height to cover the target
areas.
5. Electrical Powering system with SCADA Automation System
a. Main HV Power Switching Station and HV/LV Distribution Substation including the construction of
associated building having SCADA Control Centre provision.
b. Electrical HT& LT Network with multiple HV/LV Distribution Substations connected in Ring along
the length of project.
c. Control and Monitoring of HT&LT network on SCADA over fiber optic cable
d. Earthing System for entire Electrical Works
e. Lightning Protection System for entire Project (wherever applicable)
f. Any other subsidiary Work related to the above that may be required.
6. Powering Fire Fighting, Dehumidification and Navigational Aids
a. Powering all the Mechanical, Electrical, Plumbing and Firefighting (MEPF)
b. Services across the Bridge / Road as per requirement
c. Powering of Fire Fighting System for Bridge
d. Powering of Dehumidification of the Box girders
e. Powering of Ventilation System for Box girders
f. Powering of General Lighting & Small Power Provisions (if any) in the Box Girder for maintenance
g. Providing Second Source of Supply to Navigational Aids
h. Powering Specified Aesthetic Lighting across the Bridge
i. Providing Suitable Earthing & Lightning System
7. Highway Illumination System Complete with Monitoring & Control
a. Highway Pole Mounted Lighting including associated Feeder Pillars
b. Crash Barrier Embedded Street Lighting System including Associated Feeder Pillars
c. Providing Aesthetic Lighting System along with Feeder Pillars
d. Control and Monitoring of Lighting System with Fibre Optic Cable
e. Applicable Earthing and Lightning System
8. Truck and Toll Laybys Facilities
a. Truck Laybys shall be provided with Full MET, Full ECB and CCTV facilities
b. Toll Laybys shall be provided with guiding signs, ECB, CCTV facilities
c. 8 nos. of weigh bridge installation.

SCOPE OF WORK FOR CIVIL AND ARCHITECHTURAL DDC


1.0 Project Scope of Work

(1) Gavhan Portion / Chirle


(a) Main Administration and Command Control Centre Building – Gavhan (G+4)
(b) 16 Lanes Toll Plaza with underground toll tunnel.
(c) 2 Nos. Weigh Bridges.
(d) Access Roads to Admin Building (Drive Ways)
(e) Landscaping including landscaping for future expansion area.
(f) 2 Nos. Food Plazas (G+1]
(g) Approach road to main Toll Plaza

(2) Shivail Nagar Portion:


(a) Admin Building (G+1).
(b) 6 Ramp Toll Plazas (varying from 3 lanes to 6 lanes).
(c) 6 Nos. Weigh Bridges
(d) Approach Roads and Ramps to all 6 Toll Plazas.
(e) 6 Nos. Porta Cabins.
(f)4.5 M. wide - 1.6 km. long Service Roads

(3) Sewri Portion:


(a)Admin Building (G+2)

(4) Miscellaneous Buildings and Structures:


(a)Substation Building
(b)Mast Foundations
Scope of Work updated on 15 July 2022
Electrical Works for Bridges
S. Description Detailed Scope
No.
1. Power Supply Receiving Power demand application, Liasion with BEST for power Supply demand and
source from BEST associated work for Switching Station at Sewri including HT Metering Kiosk etc.
The charges in terms Power demands, security deposit and fee as applicable
including supervision charges etc. to be paid by the Employer to the BEST.
The Employer shall, however, reimburse the amount to the contractor under Sub
Head - Provisional Sum.
2. Switching Station Design Design, Seeking approval for Switching station building layout and associated
equipment, HT Metering Kisok, SCADA system etc., procurement, supply,
transportation, installation, testing & commissioning of Switching Station including
all associated accessories in complete at Sewri in all respect with proper safety &
security to meet the requirement stipulated by the BEST’s Power Planning Team.
The work to be supervised by BEST personnel on time to time basis.
This shall also include supply and install all the safety equipment at strategic
location as laid down under Indian Electricity Rule and in conformation with Local
Fire Authority of Maharashtra.
MTHL Bridge and Buildings Substation
3. Compact Substations Design, procurement, supply, transportation, installation, testing & commissioning
of Compact Substations on the provided Substation platforms of various capacities
across the Bridge. (location and Chainages are mentioned in the Employer’s
Requirement).
This shall also include supply and install all the safety equipment at strategic
location as laid down under Indian Electricity Rule and in conformation with Local
Fire Authority of Maharashtra.
4. 11kV HV Cables (E ) Design, procurement, supply, transportation, laying, installation, testing &
commissioning of 11kV, 3 x 1Cx 240 Sqmm HV XLPE FR-LSH, Class-2
conductor Cu (E) Power Cable including associated Straight Through Joint and
Termination to connect all the Compact substations on the bridge and buildings, as
per the attached drawing. This shall include provision of Cable Tray / Ladder and
Hangers etc. as required as per Employer’s Requirement. All the fixtures and
fittings should have seismic compliance.
Note: This shall also include provision of Ladder and required support to lay 11 kV
Cable along Box Girder from 11 kV Switching Station to the entry point of Box
Girder at Sewri.
5. 1.1kV LV Cables
a) Design, procurement, supply, transportation, laying, installation, testing &
commissioning of 1.1kV, 4x 1Cx 240/185/150/120/95 and 70 Sqmm Class-2
conductor, XLPE FR-LSH Al. Power Cable (as per the actual loads for feeder
pillars and any other requirement). This shall include Straight Through Joint
and Terminations and all associated etc. to feed LT Supply from the Compact
substations all along the Bridge, as per the attached drawing. This shall include
provision of Cable Tray / Ladder and Hangers etc. as required as per
Employer’s Requirement. All the fixtures and fittings should have seismic
compliance.

b) Design, procurement, supply, transportation, laying, installation, testing &


commissioning of 1.1kV, 4Cx 25/35 Sqmm XLPE FR-LSH, Class-2 conductor,
Cu Power Cable including associated terminations, joints and Junction Boxes
etc. as required with each Light pole and ITS Pole to feed LT power for
Lighting and power for ITS Equipment. This shall include provision of Cable
Tray / Ladder suitable supports etc. as per Employer’s Requirement and
drawing. However, provision of 3 numbers 100 mm dia steel conduits in
concrete of Crash barriers is being made by the respective Package contractor
for Fibre cable and power Cables.

c) Design, procurement, supply, transportation, laying, installation, testing &


commissioning of 1.1kV, 4Cx 25/35/50/70 Sqmm, Class-2 conductor, XLPE
FR-LSH Al. Power Cables as required as per design to meet load requirement
from Substation / Feeder Pillar to feed various Distribution Boards like Girder
lighting DB/ aesthetic lighting DB, event based lighting DB, Navigational,
Vehicle charging, fire Fighting and ventilation fans etc. as applicable as per
Employer’s requirement and drawing. This shall include provision of Cable
Tray / Ladder and Hangers etc. as required as per Employer’s Requirement. All
the fixtures and fittings should have seismic compliance.

6. Earth Cables for Earthing &


Lightning Protection a) Design, procurement, supply, transportation, laying, installation, testing &
commissioning of 1.1kV, 1Cx 240 Sqmm, flexible HR PVC insulated Al
Class-2 conductor cable (for interconnection between Steel liner of the Pile Cap
to Box Girder for body earthing & for interconnection between Steel liner of the
Pile Cap to Crash Barrier cable tray for lightning Protection) with suitable
clamps and support including termination, joints. The material, connections and
joints etc. shall be rust proof.

b) Design, procurement, supply, transportation, laying, installation, testing &


commissioning of 1.1 kV, 1Cx 150/50/35/16 Sqmm, flexible bare Al Class-2
Conductor cables / wire (in Void of Box Girder and in Cable Tray along the
Crash Barrier) with suitable clamps and support including termination, joints on
existing Cable Tray / Ladder. The material, connections and joints etc. shall be
rust proof.

c) Design, procurement, supply, transportation, installation, testing &


commissioning of 1.1 kV, 1Cx. 300 Sqmm, flexible HR PVC insulated Al
Class-2 conductor cable for Lightning Protection Earthing between Pile steel
liner and the bridge (Superstructure) including welded to liner by using
additional steel plate as require as per Drawings. The provision shall be made at
every 150mtr in marine area as well on the land portion.

7. Equipotential Earthing for all Supply, Installation, testing & commissioning of GI Strip of 32mmx6mm size / or
Poles, Panels, DBs and equivalent conductor as require connecting Light / ITS Poles, Panels, DBs and
Junction Boxes etc. Junction Boxes etc. for equipotential boding all along the bridge and Service
throughout the bridge Building. This shall include provision of redundant / duplicate earth connection as
per standards.

6. Fibre Cable a) Design, procurement, supply, transportation, installation, testing &


commissioning of 12 C Fibre Cable for SCADA/BMS Control and Monitoring
System for HV Switching Station, Compact Substation, HV/LV Switchgears,
RMU, etc. from Main Central Command Centre at Sewri and to make it
operational etc.

b) Design, procurement, supply, transportation, installation, testing &


commissioning of 12 C Fibre Cable for SCADA/BMS for Lighting control and
monitoring (ON/OFF/ FAILED status) across the Bridge.
The OFC Cable shall be laid and running through the 100mm Steel conduit
provided in crash barrier. Lighting Control from Main Central Command Centre at
Sewri to make it operational, etc. as require as per specification.

7. Cable trays Design, procurement, supply, transportation, installation Galvanized, factory


fabricated, Cable Tray / Ladder, Hangers etc. for supporting Cables / Wires /
conduits etc. inside and outside the Box Girder as per Drawing and anchoring
provisions made in box girder by Package-1, 2 & 3 Contractors for HV/ LV & Fibre
Cables, etc. as per Employer’s Requirement.
The Cable Tray / Ladder, Hangers etc. shall be hot dip galvanized (IS- 4759/6745
latest) with PU painted (IS 13213), to suits saline environment of sea and provides
corrosion resistance.
8. Distribution Board / Feeder Design, procurement, supply, transportation, installation, testing & commissioning
Pillars of Feeder Pillars with appropriate ratings of ACB / MCCB / MCB, Switchgears and
(on Bridge) associative wiring & indication in complete as require for façade lighting to view
gallery on pier Top or at the location behind the crash barrier etc. as require as per
specification.
(The location and Chainages are attached with the Specification.
9. Conical Poles for Lighting & Design, procurement, supply, transportation, installation, testing & commissioning
CCTV/VIDS system of 9/10 meter-high Conical Poles for Lighting & CCTV/VIDS. The poles shall be
hot dip galvanized high tensile sheet steel of grade E350 (IS 2713 - Pt.-2) with PU
painted (IS 13213), to suits saline environment of sea and provides corrosion
resistance. This shall include Base Plate, 2 Nos 40 mm dia, 1,5 meter length GI
Pipe, Junction Boxes inbuilt wiring and earthing etc. in complete as require as per
Employer’s Requirement and standards.

10. Street Lighting Pole mounted Design in accordance to IRC using proper software to meet Minimum 40 Lux,
overall uniformity 0.4, and transvers uniformity 0.33 illumination on the surface of
Road.
Procurement, supply, transportation, installation, testing & commissioning of 2x150
W LED Street Lighting fixtures. The provisions of mounting structure on crash
barrier are being made by Package-1, 2 & 3 Contractors at every 26 meters interval
to suit mounting arrangement for Light Pole. Necessary interface regarding
mounting structure and fixing to be dealt by the Electrical Contractor.
The Road and Bridge Lighting shall be based on Lighting control / dimming
management system.
11. High Mast Lighting Design in accordance to IRC using proper software to meet Minimum 40 Lux,
overall uniformity 0.4, and transvers uniformity 0.33 illumination on the surface of
Road.
Procurement, supply, transportation, installation, testing & commissioning of High
mast (12.5mtr, 15 mtr & 25 mtr High for area Lighting at various ramp locations
viz. Sewri, Sivaji Nagar, Gavan Toll Plaza, SH54 highway ramp and Chirle
Interchange. (However, the location, numbers and height of High Masts shall be
decided during detail design to achieve the require illumination level).
The High Mast shaft shall be made of best steel grade in compliance with BS EN
10025 FE 510; minimum Yield strength of 355N/sqmm (min.) for thickness <
30mm, Tensile strength between 490 – 639/N/Sqmm, minimum, elongation for
thickness 3 mm and 30 mm : 22%, and shall capable to withstand sustained basic
wind of 180 KMPH with 3 sec. gust.

Box Girder Lighting Design, Procurement, supply, transportation, installation, testing & commissioning
of Box Girder Lighting (Void) with average Illumination level of 10 Lux all along
the length inside void of Box Girder. This shall include necessary wiring, cabling
distribution Boards and all accessories as require meeting average illumination of
10 Lux all along the void.
12 Linear Heat Detection system Design, procurement, supply, installation, testing & commissioning of Leaner heat
in Box Girder Detection in the box girder including Fire alarm Panel ang all accessories in
complete as require to be monitored from central command center at Gavan.
13. Access Control System for Electronic Security keypad provided by Package-1, 2 & 3 for limiting the access to
Box Girder Entry point /Door, the box girder on the preapproved basis and shall be relayed to the toll plaza
and Main Central Command monitoring station at Main Comment Centre at Gavan. This shall also include
Centre Buildings. restricted area of Main Comment Centre at Gavan
14. Substation Earthing Design, procurement, supply, transportation, installation, testing & commissioning
of 4 Nos. (2 for neutral & 2 for Body) Earth connection using 1cx 240Sqmm Cu,
class-2,HR PVC insulated cable bonded to pile steel liner and welded to liner by
using another steel plate in marine area as well on the land portion for approval of
CEIG from the Bridge.
15. Lightening protection for Design, procurement, supply, transportation, installation, testing & commissioning
Substation of 1 No. Earth connection for lightening protection using 1Cx 240Sqmm Cu, class-2
,HR PVC insulated cable bonded to pile steel liner and welded to liner by using
another steel plate in marine area as well on the land portion of bridge
(Superstructure) as require for Substation Earthing.
7. Earthing for Lightening Design, procurement, supply, transportation, installation, testing & commissioning
Protection for electrical and of 1 No. Earth connection for lightening protection using 1Cx 300Sqmm Cu,
electronic equipment on Bridge class-2 ,HR PVC insulated cable bonded to pile steel liner and welded to liner by
using another steel plate in marine area as well on the land portion of bridge
(Superstructure) as require for [Link] every 150 mtrs / close to the ITS
Equipment.
18. 60mtr x 7 mtr Layby / Rescue a. Design in accordance to IRC using proper software to meet Minimum 40 Lux,
Bay along the main Bridge at overall uniformity 0.4, and transvers uniformity 0.33 illumination on the
every 7KM on North & South surface of Road.
Road.
Procurement, supply, transportation, installation, testing & commissioning of
2x150 W LED Street Light Fixture.
b. Design, procurement, supply, transportation, installation, testing &
commissioning of 9/10 meter-high Conical Poles for Lighting & CCTV/VIDS.
The poles shall be hot dip galvanized high tensile sheet steel of grade E350 (IS
2713 - Pt.-2) with PU painted (IS 13213), to suits saline environment of sea and
provides corrosion resistance.
This shall include Base Plate, 2 Nos 40 mm dia, 1,5 meter length GI Pipe,
Junction Boxes inbuilt wiring and earthing etc. in complete as require as per
Employer’s Requirement and standards.
c. Provision for 1 nos. 20KW, 3 phase power supply points including Junction
Box (IP:66 rated) and suitable provision of MCB as require for Electric vehicle
charging in future at every rescue bay.

The work as above shall be complete in all respect but not limited to.
Electrical Works for Building and Toll Plaza
S. Description Detailed Scope
No.
1. BEST HV Switching Station, BEST Switching Substation including Switchgear requirement in accordance with
Sewri BEST Specifications and approval thereof from BEST including HT Metering Kiosk
etc. as required to meet total Power Demand.
Design, procurement, supply, transportation, installation, testing & commissioning of
a. 11kV HV Switchgear for 11kV Ring Main Distribution
b. HT Metering Kiosk for 1 Point meter Supply
c. Scada Room
d. Power system including all Panels as per SLD with all accessories,
e. HT and LT Cables and Cable Trays
f. Surge Arrestor,
g. ELV/ Data/ telecom /FAS/ PAS as required
h. UPS for Workstation including UPS Power Distribution Boards and Sockets,
i. Lighting system as specified including emergency lighting
j. Raw Power /General Power Distribution Boards and Sockets
k. ELV/ Data/ telecom as required
l. Neutral & Body Earthing
m. Infra lighting including compound lighting & security
n. 500kVA DG Set with acoustic Enclosure, AMF Panel, and fuel Tank as require.
o. Access Control System in restricted area.
p. supply and install all the safety equipment at strategic location as laid down under
Indian Electricity Rule and in conformation with Local Fire Authority of
Maharashtra.
q. Clean Gas based Fire Suppression System.

The entire work shall be complete in all respect in accordance with NBC, IE Rules,
Indian standards and local regulation of BEST
Note: 3 phase 415 V LT Power Supply to be catered from the Nearest CSS of Sewri.
2. Sub Command Centre, Sewri Design, procurement, supply, transportation, installation, testing & commissioning of
a. 11kV/433V, 500kVA Compact Substation to cater Sewri Area power demand
b. Power Supply and Distribution System including Panels/ DBs/Switchboards per
SLD with all accessories
c. LV Cables and able Trays
d. Surge Arrestor
e. UPS for Workstation including UPS Power Distribution Boards and Sockets,
f. Lighting system as specified including emergency lighting
g. Raw Power /General Power Distribution Boards and Sockets
h. ELV/ Data / telecom with EPABX and intercom as required
i. Earthing
j. Lightning protection
k. Infra lighting including compound lighting & security,
l. 500kVA DG Set with acoustic Enclosure, AMF Panel, and fuel Tank as require.
m. Access Control System in restricted area.
n. Lifts,
o. BMS
p. Solar Power System
q. Fire Alarm and detection System
r. Public Address System.
s. Supply and install all the safety equipment at strategic location as laid down under
Indian Electricity Rule and in conformation with Local Fire Authority of
Maharashtra
t. Clean Gas based Fire Suppression System.

3. Shivaji Nagar Command Design, procurement, supply, transportation, installation, testing & commissioning of
Centre.
a. 11kV/433V, 500kVA Compact Substation to cater Sewri Area power demand
b. Power Supply and Distribution System including Panels/ DBs/Switchboards per
SLD with all accessories
c. surge arrestors
d. LV Cables/ HV Cables and Cable Trays
e. UPS for Workstation including UPS Power Distribution Boards and Sockets,
f. Lighting system as specified including emergency lighting
g. Raw Power /General Power Distribution Boards and Sockets
h. ELV/ Data / telecom with EPABX and intercom as required
i. Earthing
j. Lightning protection
k. Infra lighting including compound lighting & security,
l. 500kVA DG Set with acoustic Enclosure, AMF Panel, and fuel Tank as require.
m. Access Control System in restricted area.
n. Lifts,
o. BMS
p. Solar Power System
q. Fire Alarm and detection System
r. Public Address System,
s. Supply and install all the safety equipment at strategic location as laid down under
Indian Electricity Rule and in conformation with Local Fire Authority of
Maharashtra
t. Clean Gas based Fire Suppression System
4. Porta Cabin Design, procurement, supply, transportation, installation, testing & commissioning of
a. Power Supply and Distribution System including DBs/Switchboards per SLD with
all accessories
b. surge arrestors
c. LV Cables and Cable Trays
u. UPS for Workstation including UPS Power Distribution Boards and Sockets,
v. Lighting system as specified including emergency lighting
w. Raw Power /General Power Distribution Boards and Sockets
d. ELV/ Data/ telecom /FAS/ PAS as required
e. Earthing
5 4 lane/ 6 lane Toll Plaza Design, procurement, supply, transportation, installation, testing & commissioning of
a. Power Supply and Distribution System including DBs/Switchboards per SLD with
all accessories
b. surge arrestors
c. LV Cables and Cable Trays
a. UPS for Workstation including UPS Power Distribution Boards and Sockets,
b. Lighting system as specified including emergency lighting
c. Raw Power /General Power Distribution Boards and Sockets
d. ELV/ Data/ telecom /FAS/ PAS as required
e. Earthing
f. Area lighting & security
6. Main Central Command Design, procurement, supply, transportation, installation, testing & commissioning of
Centre, Gavan a. 11kV/433V, 1000kVA Compact Substation to cater Gavan Area power demand
b. Power system including all Panels as per SLD with suitable surge arrestors
c. Cable Trays
d. LV Cables/ HV Cables
e. UPS for Workstation including UPS Power Distribution Boards and Sockets,
f. Lighting system as specified including emergency lighting
g. Raw Power /General Power Distribution Boards and Sockets
h. ELV/ Data / telecom with EPABX and intercom as required
i. Earthing
j. Lightning protection
k. Infra lighting including compound lighting & security,
l. 500kVA DG Set with acoustic Enclosure, AMF Panel, and fuel Tank as require.
m. Access Control System in restricted area.
n. Lifts,
o. BMS
p. Solar Power System
q. Fire Alarm and detection System
r. Public Address System,
x. Supply and install all the safety equipment at strategic location as laid down under
Indian Electricity Rule and in conformation with Local Fire Authority of
Maharashtra
s. Clean Gas based Fire Suppression System

7. 16 lane Toll Plaza including Design, procurement, supply, transportation, installation, testing & commissioning of
Tunnel a. Power system including all Panels as per SLD with suitable surge arrestors
b. UPS for Workstation including UPS Power Distribution Boards and Sockets,
c. Lighting system as specified including emergency lighting
d. Raw Power /General Power Distribution Boards and Sockets
e. ELV/ Data/ telecom /FAS/ PAS as required
f. Earthing
g. Area lighting & security

HVAC Works for Building and Toll Plaza


S. Description Detailed Scope
No.
1. BEST HV Design, procurement, supply, transportation, installation, testing & commissioning of Mechanical
Switching Ventilation System, as required as per standards and BEST Regulation.
Station, Sewri
2. Sub Command Design, procurement, supply, transportation, installation, testing & commissioning of
Centre, Sewri 1. Air Conditioning System

a. VRF System (Office Areas & Control Room) (1 Set working)

Dx System (UPS RM, Battery RM, Electrical Room, Control Rooms) redundant System One Set
Working and One Set Standby.
[All monitoring room such as ITS, ATCC, HTMS room VRF as well as DX unit to maintain
redundancy. DX unit will stand by units in case of failure of centralized VRF system]
b. Precision Air Conditioners (Server Rooms) (One Set Working and One Set Standby)

2. Mechanical Ventilation

a. Toilet exhaust, Pantry, Storerooms


b. Battery Room Ventilation
c. Emergency Ventilation (Staircase, Lift well, Lift Lobby Pressurization fire operations as per fire
norms)

3. Shivaji Nagar Design, procurement, supply, transportation, installation, testing & commissioning of
Command 1. Air Conditioning System
Centre.
a. VRF System (Office Areas & Control Room) (One Set Working)
b. Dx System (UPS RM, Battery RM, Electrical Room, Control Rooms) (One Set Working and
One Set Standby)

[All monitoring room such as ITS, ATCC, HTMS room VRF as well as DX unit to maintain
redundancy. DX unit will stand by units in case of failure of centralized VRF system]
c. Precision Air Conditioners (Server Rooms) (One Set Working and One Set Standby)

2. Mechanical Ventilation

a. Toilet exhaust, Pantry, Storerooms


b. Battery Room Ventilation
c. Emergency Ventilation (Staircase, Lift well, Lift Lobby Pressurization fire operations as per fire
norms)

4. Porta Cabin Design, procurement, supply, transportation, installation, testing & commissioning of
1. Air Conditioning System
a. VRF System (Office Areas & Control Room)
b. Dx System (UPS RM, Battery RM, Control Rooms)
c. Precision Air Conditioners (Server Rooms)
2. Mechanical Ventilation
a. Toilet exhaust
b. Battery Room Ventilation
6. Main Central Design, procurement, supply, transportation, installation, testing & commissioning of
Command
1. Air Conditioning System
Centre, Gavan

a. VRF System (Office Areas & Control Room) (One Set Working)
b. Dx System (UPS RM, Battery RM, Electrical Room, Control Rooms) (One Set Working and
One Set Standby)

[All monitoring room such as ITS, ATCC, HTMS room VRF as well as DX unit to maintain
redundancy. DX unit will stand by units in case of failure of centralized VRF system]
c. Precision Air Conditioners (Server Rooms) (One Set Working and One Set Standby)

2. Mechanical Ventilation
a. Toilet exhaust, Pantry, Storerooms
b. Battery Room Ventilation
c. Emergency Ventilation (Staircase, Lift well, Lift Lobby Pressurization fire operations as per fire
norms)

7. 16 lane Toll Design, procurement, supply, transportation, installation, testing & commissioning of Mechanical
Plaza with Ventilation for Tunnel as require as per NBC and Indian Standards.
Tunnel